Build your list
Pick the add-ons for your package
Tick what you need. Your list appears on the right, ready to send with your quote request.
One plant, one shipment
Made in Vietnam, packed with your steel
Every add-on is produced in Vietnam and packed in the same hall as the frame, so one shipment brings everything. Tap a photo to open it full size.
Photo
Photo
Photo
In detail
How we handle add-ons
Made in Vietnam only
Every add-on listed here is produced in Vietnam, like the rest of the package. Items that are not made in Vietnam are not offered.
Fire protection
Fire-resistance ratings follow from occupancy and construction type and are set by the design team. Fireproofing must suit the shop primer, which is confirmed before fabrication.
Electrical and building services
We supply the support steel. Electrical, mechanical, plumbing and fire systems are designed, permitted and installed by licensed contractors in your state.
Large-project capacity
Add-ons ride with the largest packages
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
- 5,000 t Sunpro Steel Factory Steel industry · about 5,500 short tons
- 2,500 t CPV Food Processing Factory Food processing · about 2,750 short tons
- 2,000 t Long Son petrochemical Oil and gas · about 2,200 short tons
- 2,000 t M&D warehouse, Thailand Warehouse and industrial · about 2,200 short tons
- 1,500 t Tongwei feed factory, phase 1 Animal feed · about 1,650 short tons
- 1,000 t New Era cold storage, phase 1 Cold storage, phase 1 tonnage · about 1,100 short tons
In the catalog
Add-on items in the catalog
Cementitious Fireproofing
Spray-applied fire-resistive material (SFRM) is sprayed on site, after erection, by the US contractor’s fireproofing applicator. World Steel supplies the structural steel prepared for it. Made by World Steel in Vietnam VerifiedFire Protection Specification Support
Help aligning the fire protection product, the listed design and the steel shop drawings. Made by World Steel in Vietnam VerifiedCoating Compatibility Review
A check that the shop primer suits the fireproofing or intumescent product chosen for the job. Made by World Steel in Vietnam VerifiedFire Protection Inspection Documentation
Thickness records for fire coatings, ready for the special inspector and the building official. Made by World Steel in Vietnam VerifiedCable Tray Supports
Steel frames and hangers that hold cable trays at the heights and spacings your electrical design shows. Made by World Steel in Vietnam VerifiedWhere it meets the other systems
Fireproofing or intumescent coating goes over a shop primer it is approved for.
Design limit: The fire protection manufacturer must accept the primer before the steel is painted. · What gets checked: Thickness readings recorded for the special inspector.
Scope, in writing
What we supply and what stays with your team
World Steel, our plant in Vietnam
- Only add-ons made in Vietnam, listed one by one in your quote
- Fire protection products and documents, with primer compatibility confirmed before fabrication
- Electrical support steel fabricated and coated with the building steel
The US contractor, our customer
- Fire-resistance ratings set by occupancy and construction type with your design team
- Fireproofing application at site where it is site-applied, and its inspection
- Electrical, mechanical, plumbing and fire systems designed, permitted and installed by licensed contractors
Questions from US contractors
Optional add-ons questions and answers
6 answers, grouped by topic.
What is offered 2 answers
Why are only Vietnam-made add-ons offered?
Every add-on is produced in Vietnam, like the rest of the package, so one supply chain and one shipment cover everything. Items that are not made in Vietnam are not offered.
Which add-ons are included in my quote?
Your quote lists exactly which add-ons, if any, are included. Nothing is added unless you ask for it.
Fire protection 2 answers
Can you provide a fire rating for the steel?
A rating is claimed only where a listed, approved design backs it. Fire-resistance ratings follow from occupancy and construction type and are set by your design team.
Why check primer compatibility?
Fireproofing must bond to the shop primer. We confirm compatibility before fabrication so the coating and the fireproofing work together.
Electrical support 2 answers
Do you supply the electrical system?
No. We supply the support steel. Electrical, mechanical, plumbing and fire systems are designed, permitted and installed by licensed contractors in your state.
Do add-ons ship separately?
No. They are packed with the building steel and ship in the same containers, marked to the shop drawings.
Keep reading
Related pages
Price it or partner with us
Send the list with your drawings.
We quote the steel and the add-ons you ticked, produce both in Vietnam and ship them together.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833