Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Port structures several stories high under construction, drone view

Virginia · Port and logistics

From our plant to your Virginia site through the Port of Virginia

The Port of Virginia, with terminals in Norfolk, Portsmouth and Newport News, is one of the deepest harbors on the East Coast. Steel packed in our plant sails there, then continues by truck, or by rail to the Virginia Inland Port at Front Royal and the Richmond area for inland sites.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Virginia site through the Port of Virginia.

Exported steel in place in Singapore: a World Steel job abroad, shown for the building type rather than a US site.

Gateway
Port of Virginia, Norfolk
Inland links
Rail, truck, inland port
Packing
Erection order, listed
Our part
Plant to port, tracked

Why it matters

Delivery is part of the steel package

A large package arrives as many containers and flat racks. If members are mixed, the site loses days sorting them. We pack and list by erection area, so each delivery matches the next step of your crane plan.

You follow the packing and loading of every member in PEB Studio, and the Incoterm agreed in the contract sets who handles freight, customs and the trucking to your site.

The route

Gateways for Virginia sites

Port of Virginia

Norfolk, Portsmouth and Newport News terminals for most Virginia sites.

Port page →

Port of Baltimore

An option for northern Virginia sites close to Maryland.

Port page →

Rail and inland port

Rail to Front Royal and the Richmond area for inland sites.

Truck to site

The last leg by truck, delivered in erection order.

Who does what

Logistics, split clearly

World Steel supplies

  • Packing and labelling by erection area
  • Packing lists per container and flat rack
  • Loading at the plant, tracked in PEB Studio
  • Shipping documents for the agreed Incoterm
  • Erection drawings and piece marks

The US contractor arranges

  • Import clearance as agreed in the contract
  • Trucking from port or rail yard to site
  • Unloading, laydown and erection
  • Site access and permits
  • Storage on site

Virginia ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Virginia contractors

Virginia contractors: let’s win the next project together

If your next bid involves port of Virginia, World Steel wants to be your long-term, win-win steel partner in Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Virginia project is cut, welded, inspected and packed.

Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Packing hall with steel bundles, timber dunnage and loading racks
Timber dunnage and bundles in the packing hall at the Vietnam plant.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Virginia buyers ask

Which port is best for my Virginia site?

For most sites the Port of Virginia. Northern Virginia sites can also use Baltimore. We compare the routes for your address.

Can steel go by rail inland?

Yes, by rail to Front Royal or the Richmond area, then truck. We plan the route with you.

Who handles customs?

It depends on the Incoterm in the contract. We explain the options before you order.

Official sources: The Port of Virginia

Related pages

Code facts on this page summarize Virginia practice, the Virginia Uniform Statewide Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.

Building in Virginia?

Send the drawings or the site address, size and use. We set the Virginia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.