Oregon · Cascadia seismic
Structural steel for Oregon’s Cascadia seismic hazard
The Cascadia subduction zone runs just off the Oregon coast and can produce a great earthquake with long shaking across the western half of the state. Crustal faults run under the Portland area, and soft river soils along the Willamette and the Columbia amplify the motion. Many sites in Portland, the valley and on the coast fall in high Seismic Design Categories.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Portland or Seattle–Tacoma for your Oregon site.
- Source
- Cascadia subduction zone
- Categories
- Often D and above
- Soils
- Soft river sediments
- Design basis
- ASCE 7 and AISC 341
Open call · Oregon contractors
Oregon contractors: let’s win the next project together
If your next bid involves Cascadia seismic design, World Steel wants to be your long-term, win-win steel partner in Oregon. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Oregon project is cut, welded, inspected and packed.
Q&A
What Oregon buyers ask
Does Cascadia affect my project?
Very likely west of the Cascades. Your Engineer of Record sets the Seismic Design Category from the site class and the hazard, and we design the steel to it.
Do you weld demand-critical welds?
Yes. Our shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds.
Can inspectors follow the work?
Yes. Remote inspector access is available on request, alongside the inspection items agreed in the project ITP.
Official sources: Oregon Department of Geology and Mineral Industries: earthquakes
Oregon solutions
Every Oregon guide
Related pages
Code facts on this page summarize Oregon practice, the Oregon Structural Specialty Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Oregon?
Send the drawings or the site address, size and use. We set the Oregon design basis with your Engineer of Record, design or detail the steel to the Oregon Structural Specialty Code and for Cascadia seismic hazard, snow and coastal wind, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Portland or Seattle–Tacoma for the truck to your site.