New Hampshire structural steel solutions

Structural steel for large New Hampshire projects, from Nashua to the White Mountains

New Hampshire builds advanced manufacturing plants in Nashua, Manchester and the Seacoast, distribution centers near the Boston market, life sciences buildings in the Manchester Millyard and hospitals, campuses and resorts across the state. As a structural steel fabricator with our own plant in Vietnam, we design the steel to the New Hampshire State Building Code, mountain snow and seismic, and deliver it in erection order.

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam

Light gray warehouse roof beside process plants, seen from above
Drone view of a World Steel warehouse on an overseas industrial site.

Six granite slabs

Where New Hampshire builds big, and what each place needs

From the plants of Nashua and the Millyard in Manchester to the Seacoast and the resort towns of the White Mountains, New Hampshire’s large projects gather in six places. Each has its own buildings and its own weather.

  • Nashua and Merrimack

    Hillsborough County south

    Advanced manufacturing and distribution.

  • Manchester

    The Millyard and the airport

    Life sciences, plants and logistics.

  • Londonderry and Salem

    Rockingham County

    Distribution centers near Boston.

  • Portsmouth and the Seacoast

    Pease and the port

    Aerospace, defense work and salt air.

  • Concord and the Lakes Region

    Merrimack and Belknap counties

    Public work, hospitals and plants.

  • The White Mountains and North Country

    Conway, Lincoln, Berlin

    Resorts and very heavy snow.

South

Southern tier

Plants and warehouses near Boston.

Valley

Merrimack Valley

Manchester labs and plants.

Seacoast

Seacoast

Portsmouth, Pease and salt air.

Lakes

Capital and lakes

Concord and the Lakes Region.

Notch

White Mountains

Resorts and heavy snow.

Upper

Upper Valley

Hanover hospital and campus work.

Ready for New Hampshire

What a large New Hampshire project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Ready for the state code

Calculations that state the New Hampshire code edition, state amendments and the loads.

State Building Code guide →

Mountain snow

Roof steel for ground snow that climbs steeply toward the mountains, with drift on every roof.

Mountain snow guide →

Demand-critical welds

AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.

Demand-critical welds →

Accredited plant

The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.

IAS AC472 accreditation →

Shop drawings included

Tekla shop and erection drawings for every New Hampshire project at no extra cost, ready for approval.

Shop drawings, included →

Live production tracking

Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.

PEB Studio tracking →

New York or Boston

Steel packed in erection order and trucked north on I-95 and I-93.

Port to New Hampshire guide →

Solution advisor

Pick what you are building. We recommend the steel.

Structural steel for the project types New Hampshire builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

The New Hampshire ecosystem

Every product and solution a New Hampshire project needs, board by board

Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.

Open call · New Hampshire contractors

New Hampshire contractors: you run the job, we fabricate the steel from Nashua to the North Country

Advanced manufacturing plants in Nashua, Manchester and the Seacoast, distribution centers in Londonderry and Merrimack, life sciences in the Manchester Millyard and hospitals, campuses and resort buildings in the north are large steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, deliver it in erection order and back your bids with drawings and live tracking.

  • Advanced manufacturing in the south
  • Distribution near the Boston market
  • Life sciences in the Millyard

Buying steel from outside the US

Buying structural steel from outside the US? Here is what New Hampshire buyers check.

The questions New Hampshire owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Real World Steel photos

Every New Hampshire package starts in our plant in Vietnam

Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a New Hampshire site.

Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Galvanized tower tubes with plastic-wrapped flanges stacked in an open yard
Galvanized tower tubes with their flanges wrapped to protect the zinc in transit.
Rows of columns, rafters and purlins inside a large steel building
Inside a finished World Steel frame on a job abroad (location not stated).
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.

Worry-free shipping

Steel for your New Hampshire project, without the shipping worries

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions from New Hampshire buyers

New Hampshire questions we hear most

Which code applies to my New Hampshire project?

The New Hampshire State Building Code, which adopts the ICC codes statewide with state amendments through the Building Code Review Board. Towns with building departments enforce it, and the State Fire Marshal’s office covers some buildings in towns without one. We confirm the edition and review path early.

How do you design for New Hampshire snow and seismic?

Ground snow rises steeply toward the White Mountains and the North Country, so we take it for each site elevation and check drift on every roof. New Hampshire has moderate seismic hazard, and we design the bracing for the Seismic Design Category your Engineer of Record sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.

How does steel reach a New Hampshire site?

Our steel usually lands at New York–New Jersey or Boston and travels north by truck on I-95, I-93 and the Everett Turnpike. Members are packed in erection order.

Do you erect the steel in New Hampshire?

No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.

Talk to an engineer

Send the address. We tell you what New Hampshire asks of your steel.

Our engineers and project managers work in English and reply with the code, snow, seismic and delivery questions for your site.

Honest status. World Steel designs and fabricates to the New Hampshire State Building Code and ASCE 7. We hold no state or local approval and no New Hampshire engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Building in New Hampshire?

Send the drawings or the site address, size and use. We set the New Hampshire design basis with your Engineer of Record, design or detail the steel to the New Hampshire State Building Code, mountain snow and seismic, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order and delivered through New York or Boston to your site.