Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For design-build contractors

Fabricator engineering at the table before your GMP is set

In design-build the price is promised before the design is finished. World Steel puts its engineers into design development, so the steel and envelope in your GMP are the steel and envelope we will fabricate.

  • Fabricator input while the GMP is being set
  • Structure and envelope settled together
  • Calculations ready for the Engineer of Record and plan review

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

  1. Framing systems compared
  2. Preliminary design and quantities
  3. Envelope and openings settled
  4. Itemized scope = your GMP
CPV Food processing plant, 2,500 t of World Steel structural steel

Before and after

From the usual steel problem to the World Steel way

Design risk inside the priceEvery change after the GMP comes out of your margin.
Frames sized earlyPreliminary design and steel quantities during schematic design.
Late envelope decisionsRoof and wall choices made too late to price accurately.
Value Engineering in writingOptions your Engineer of Record accepts or rejects, never applied without approval.
Structure designed twiceA concept frame redesigned by the fabricator after award.
Accredited designMetal building design and fabrication under IAS AC472.
And one more thing you get:
Plan-review readyCalculations and drawings for your Engineer of Record and the plan reviewer.

Early involvement

Where our engineers join your design

What you get from World Steel at each step, so the number you promise is the number you build.

Where our engineers join your design

  1. ConceptFraming systems compared on your footprint, with steel weight per m².
  2. Schematic designPreliminary frame design, quantities and the envelope options.
  3. GMPAn itemized scope of supply that matches the design you priced.
  4. Construction documentsCalculations and drawings for EOR review, approval and the permit.
  5. FabricationShop drawings included; progress live in PEB Studio.

Request a quotation

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Involve us at concept stage
Become our partner in the USDesign-build firms that pursue work with us get early-involvement terms for interviews and proposals, and the same engineers from pursuit to delivery. Partner program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that design-build contractors use most, each with its own page to read before you call.

Ecosystem for Design-Build Contractors

  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
  • PEB Studio trackingYour own login to follow fabrication, inspections, packing and shipping of your structure in real time.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What design-build contractors ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Involve us at concept stage
When should we bring World Steel in?

At concept or schematic design, before the GMP. Early framing studies and quantities give you a steel number you can hold.

Will World Steel design the building?

We design the metal building system and prepare calculations and drawings. Your Engineer of Record reviews and approves them, and seals them where required.

How are Value Engineering changes handled?

Each option is submitted in writing with its effect on steel weight and details. It is applied only after your Engineer of Record approves it.

Can you support a proposal or interview?

Yes. We prepare framing options, quantities and scope narratives your team can use in the pursuit.

What is World Steel’s largest design-build style job?

CPV Food’s processing plant used about 2,500 t of structural steel, designed and fabricated by World Steel.

Is the steel made in the US?

No. It is fabricated in World Steel’s own plant in Vietnam and shipped to the US.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.