Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hawaii · Seismic

Structural steel for Hawaii seismic design

Hawaii Island sits over an active volcanic hot spot and has had large earthquakes, including the magnitude 6.9 event in 2018. It carries the highest seismic hazard in the state, and Maui and the other islands are not zero. Your Engineer of Record sets the Seismic Design Category. We design the lateral steel to AISC 341 where it applies.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Highest hazard
Hawaii Island
Reference event
2018, magnitude 6.9
Design
AISC 341 where it applies
Welds
AWS D1.8-qualified

Why it matters

Volcano country

A building in Hilo or Kona may fall in a high Seismic Design Category on volcanic soils, while also carrying hurricane wind. Both lateral loads are checked, and the governing one sets the frames and anchorage.

We design or detail braced and moment frames to AISC 341 where they apply, mark protected zones on request and weld demand-critical joints with AWS D1.8-qualified WPS and welders.

What we design and fabricate

Steel for seismic categories

Braced frames

Special concentric and buckling-restrained frame steel.

Moment frames

Prequalified connections under AISC 358 where specified.

Demand-critical welds

Welds made by AWS D1.8-qualified welders with procedures on file.

Anchorage

Base plates and anchor rods for the seismic reactions.

Who does what

Seismic steel, split clearly

World Steel supplies

  • Lateral system steel designed or detailed to AISC 341 where it applies
  • AWS D1.8-qualified procedures and welders for demand-critical welds
  • Protected zones marked on the members on request
  • Mill certificates traced by heat, with Charpy results on request
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site class and Seismic Design Category by the Engineer of Record
  • Engineer of Record approval and PE seal
  • Special inspections and the quality assurance plan
  • Foundations and anchorage installation
  • Erection and site work

Hawaii

What we do not claim

AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Hawaii engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.

Hawaii ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Hawaii contractors

Hawaii contractors: let’s win the next project together

If your next bid involves Big Island seismic, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Painted beams with bolted end plates resting on stands below an overhead crane
Coated beams with end plates welded on, waiting for release in the Vietnam plant.
Pair of red truss assemblies with bolted connection plates inside the shop
Two trusses finished in red primer at World Steel in Vietnam.
Rows of columns, rafters and purlins inside a large steel building
Inside a finished World Steel frame on a job abroad (location not stated).

Q&A

What Hawaii buyers ask

Does all of Hawaii need seismic detailing?

The category varies by island and site. Your engineer sets it from the soils.

Is AISC 341 a certificate?

No. AISC 341 is a design standard. We design and fabricate to it where it applies.

Which governs, wind or seismic?

It depends on the site and building. Both are checked.

Official sources: USGS Hawaiian Volcano Observatory

Building in Hawaii?

Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.