New York · Data centers
Structural steel for New York data centers
Data centers in New York gather where power and fiber meet: near hydropower in Western New York, in the Capital Region and in the Hudson Valley north of the city. A campus is built hall by hall, with heavy roof plant and yard equipment, and upstate the roofs carry lake-effect snow on top of it all.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.
- Clusters
- West, Capital, Hudson Valley
- Pattern
- Hall by hall
- Roof
- Heavy plant and snow
- Yard
- Equipment steel
Why it matters
Repeat the hall, carry the plant
A data center campus repeats the same hall several times, so the steel model and details are reused and each later hall comes faster. Cooling units on the roof and generators and switchgear in the yard need their own frames and platforms.
Upstate, snow drifts against roof equipment screens and parapets. We raise roof plant on dunnage and design the roof for snow, drift and equipment together.
What we design and fabricate
Steel for data centers
Hall frames
Repeatable frames for data halls, released hall by hall.
Roof plant
Dunnage and platforms for cooling units.
Yard steel
Frames for generators and electrical equipment.
Service supports
Cable tray and duct support steel.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall frame and roof plant steel design or detailing
- Yard and equipment support steel
- Repeatable packages released hall by hall
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Mechanical and electrical design
- Engineer of Record approval and PE seal
- Local permit and inspections
- Foundations and slabs
- Erection and site work
New York
What we do not claim
World Steel names no data center operator as a customer and claims no completed New York data center.
New York ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New York contractors
New York contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.
Q&A
What New York buyers ask
Can you repeat the same hall across a campus?
Yes. We keep the model and the details so each later hall is released and fabricated faster.
How do you handle snow around roof plant?
We design the roof for snow, drift and equipment together and raise units above the expected drift.
Can you work with a design-build team?
Yes. We work with your Engineer of Record and the mechanical and electrical designers from early design.
Official sources: New York Power Authority
New York solutions
Every New York guide
Related pages
Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.
Building in New York?
Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.