Snug-tight
Where
Most secondary connections and joints in bearing.
How it is checked
Plies in firm contact after a few impacts of an impact wrench or the full effort of a worker with a spud wrench.
RCSC Specification
Nothing is welded in the field. Which joints are snug-tight, pretensioned or slip-critical, and how they are inspected, is set under the RCSC Specification for each project.
Where
Most secondary connections and joints in bearing.
How it is checked
Plies in firm contact after a few impacts of an impact wrench or the full effort of a worker with a spud wrench.
Where
Joints with load reversal, vibration or where the design calls for it.
How it is checked
Bolts tensioned by turn-of-nut, calibrated wrench or tension-indicating methods, as the RCSC Specification lists.
Where
Joints that must not slip in service, such as some bracing and crane connections.
How it is checked
Faying surfaces prepared to the specified class and bolts pretensioned; surfaces masked in the shop.
Where steel meets concrete
We provide column reactions and the anchor rod setting plan, and ship rods when your contract lists them. Embedment design and casting stay with your foundation team.
AWS D1.1 and D1.8
Plates, clips and welded assemblies are fitted, welded and inspected under qualified procedures. Tap a photo to open it full size.
Photo
Photo
Photo
Photo
In the catalog
Photo
Photo
Photo
Photo
Photo
Photo
Column base plates sit on anchor rods that carry the column reactions into the concrete.
Design limit: Rod positions and projection above the concrete must agree with the foundation drawings to the tolerance shown. · What gets checked: Survey rod locations and elevations before steel arrives, then grout under the base plates.
Bolts and anchor rods get a finish that works with the coating on the steel they connect.
Design limit: Keep metals alike: galvanized steel takes galvanized bolts, so no galvanic couple forms. · What gets checked: Fastener certificates checked against the bolt list.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
7 answers, grouped by topic.
No. Every site joint is bolted. Which joints are snug-tight, pretensioned or slip-critical, and how they are inspected, is set under the RCSC Specification and shown on the drawings.
Yes, when your contract lists them. Bolts are packed with the members they belong to, with bolt lists on the shop drawings.
They are prepared to the specified surface class and masked during coating in the shop, so the friction surface arrives as designed.
The foundation engineer. World Steel provides the column reactions and the anchor rod setting plan; casting the rods into the footings is your foundation contractor’s work.
Damage in high wind usually begins at a connection, not in the middle of a member. That is why uplift is followed from panel screws through clips and frame joints down to the anchor rods.
Yes. The shop has weld procedures and welders qualified to AWS D1.8 for seismic work, alongside AWS D1.1 for structural welding.
Yes. The plant fabricates 2,500 t of structural steel a month, and jobs like the 5,000 t Sunpro Steel factory were detailed and shipped with every connection piece marked.
Keep reading
Covered in our state guides
Price it or partner with us
We design every connection in the load path, ship the plates, bolts and rods your contract lists, and give your foundation team the reactions.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833