Structural steel for Alaska mine and mill buildings

Alaska runs some of the largest gold, zinc and silver mines in the country, in the Interior, the Northwest Arctic and the Southeast, and more are in development. Their mill buildings, truck shops and conveyor steel follow the owner’s specifications and travel far to remote sites. We fabricate and pack that steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by sea through Tacoma to Anchorage for your Alaska site.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Mines
Gold, zinc, silver
Typical steel
Mills, truck shops
Cranes
Maintenance bays
Spec
Owner specifications

Why it matters

Heavy steel, far from roads

A truck shop for haul trucks needs wide doors, crane bays and heated space, and a mill building stacks heavy equipment. Many mines are reached by a single gravel road or by barge.

We fabricate process buildings, crane bays and conveyor steel to the owner’s specifications, coat them for the exposure and pack them for the long road or barge to the site.

What we design and fabricate

Steel for mines and mills

Process buildings

Mill, concentrator and truck shop buildings.

Crane bays

Crane columns and runways for maintenance.

Conveyor steel

Galleries, trestles and transfer towers to owner specs.

Coatings

Galvanizing or duplex systems for dust and weather.

Who does what

Mine steel, split clearly

World Steel supplies

  • Process buildings, crane bays and conveyor steel
  • Fabrication to owner specifications
  • Coating systems for the exposure
  • Packing for remote site delivery
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Site access and foundations
  • Mine safety and permits
  • Erection and site work

Alaska

What we do not claim

World Steel names no Alaska mining company as a customer and claims no completed Alaska mine project. Mine permits and safety are the owner’s scope.

Alaska ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Alaska contractors

Alaska contractors: let’s win the next project together

If your next bid involves mine structures, World Steel wants to be your long-term, win-win steel partner in Alaska. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Alaska project is cut, welded, inspected and packed.

Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.
Black-coated members bundled on a loading rack
Black-coated bundles staged on the loading rack, World Steel, Vietnam.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Q&A

What Alaska buyers ask

Do you work to mine owner specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you build heated truck shops?

Yes. We frame heated shops with crane bays and wide doors.

Do you handle mine permits?

No. Mine permits and safety are the owner’s scope.

Official sources: Alaska Department of Natural Resources, Mining

Alaska solutions

Every Alaska guide

Related pages

Code facts on this page summarize Alaska practice, the IBC as adopted for your Alaska site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Alaska?

Send the drawings or the site address, size and use. We set the Alaska design basis with your Engineer of Record, design or detail the steel for great-earthquake seismic, heavy snow and deep cold, and quote it made in our plant in Vietnam, packed by bay in erection order and shipped by sea through Tacoma to Anchorage.