Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Engineering & standards · Coating standards body

AMPP: the SSPC and NACE coating standards under one name

In 2021 NACE International and SSPC joined to form AMPP, the Association for Materials Protection and Performance. The coating standards US engineers have cited for decades now come from one publisher, and the inspector and contractor programs owners ask for run under one roof. Here is how to read an AMPP citation, and how we work to it in our paint shop.

Formed
2021, from NACE International (1943) and SSPC (1950)
Publishes
SSPC, NACE and joint coating standards, guides and procedures
People programs
Coating inspector and coating applicator certifications
Company programs
QP certifications for painting contractors and shops

Companies and people, certified separately

The AMPP programs a US coating specification can ask for

AMPP certifies two different things: painting companies, through its QP programs, and individual people, through inspector and applicator certifications. A specification can ask for either. This map shows what each one proves and when US owners tend to ask for it.

Companies · QP programs

QP 3

A shop painting operation has been assessed for its procedures, equipment, records and people.

When a US spec asks for it
Shop-coated steel for bridges, transit and owners with their own coating rules.

QP 1

A field painting contractor can prepare and coat complex industrial structures on site.

When a US spec asks for it
Field coats and repainting on bridges, tanks and plants, the US contractor's side.

QP 2

A field contractor can remove hazardous coatings, such as lead paint, safely.

When a US spec asks for it
Repainting older structures that carry lead or other hazardous paint.

QP 5

A coating inspection company has the procedures and qualified inspectors to inspect coating work.

When a US spec asks for it
When the owner hires an inspection firm rather than a single inspector.

People · certifications

Coating inspector

An individual has passed AMPP coating inspector training and exams at a stated level.

When a US spec asks for it
The owner's or engineer's inspector who signs off coating hold points.

Coating application specialist

A blaster or painter has shown the skills in the joint applicator standard SSPC-ACS 1/NACE No. 13.

When a US spec asks for it
Specifications that set a minimum share of certified craft workers.

World Steel applies AMPP, SSPC and NACE standards in its own paint shop. Our coating inspectors hold FROSIO Level III and BGAS painting inspector qualifications, and every coating hold point is open to your inspector. We hold no AMPP QP certification and no AMPP inspector certification; a requirement for either is agreed before award.

16 answers from our engineers

AMPP questions and answers

What owners, engineers and coating inspectors ask about AMPP on steel coated in our plant: the merger, how standards are cited, inspector and QP programs, and how World Steel works to them.

Not answered here?Send your AMPP question with the drawings. An engineer replies in writing.

AMPP, NACE and SSPC 4 answers

What is AMPP?

The Association for Materials Protection and Performance, formed in 2021 when NACE International and SSPC joined. It publishes the coating and corrosion standards both bodies wrote and runs their training and certification programs.

Are SSPC and NACE standards still valid after the merger?

Yes. The documents carry on under AMPP with their numbers and requirements, and they are revised over time like any standard. A specification that cites SSPC-SP 10 or NACE No. 2 still means near-white blast.

What is a joint standard?

A standard SSPC and NACE wrote together before the merger and published under both numbers, such as SSPC-SP 10/NACE No. 2 for near-white blast or SSPC-SP 6/NACE No. 3 for commercial blast.

How should a new specification cite these documents?

By document number and edition, in the form the owner's template uses. What matters is that each document is identifiable; we list them all back to you before fabrication either way.

Inspectors and applicators 5 answers

What does an AMPP-certified coating inspector do on our job?

Checks that the steel is prepared, coated and measured as the specification says: conditions, cleanliness, profile, film thickness and repairs, at the hold points in the inspection plan, and signs the acceptance.

Who appoints the coating inspector?

Usually the owner or the Engineer of Record, sometimes through the US contractor. The inspector works for the party that pays, which keeps the inspection independent of the paint shop.

Can the inspector work remotely while the steel is coated in Vietnam?

Yes. Hold points can be witnessed in person in our plant or remotely, with live video and the readings posted in PEB Studio. Many owners combine a visit for the first members with remote checks after.

Are your painters certified?

Our painters are trained and certified by the paint manufacturer whose products they apply. AMPP applicator certification of our crew is not claimed.

What qualifications do your own coating inspectors hold?

FROSIO Level III and BGAS painting inspector, two coating inspector schemes used worldwide. They check every hold point in our plant. They are not AMPP certifications, so where a specification names an AMPP-certified inspector, that inspector is appointed by you and witnesses alongside ours.

QP programs 3 answers

What is the difference between QP 1 and QP 3?

QP 1 assesses field painting contractors who coat structures on site. QP 3 assesses shop painting operations, where steel is coated before it ships.

Does World Steel hold AMPP QP 3?

No. We apply AMPP and SSPC standards in our own paint shop with full records and inspector access. If your specification requires QP 3, raise it before award so we can agree how it is met.

Is QP 1 needed for touch-up on site?

That depends on the specification. Field touch-up and field coats are the US contractor's scope, so any field qualification it asks for applies to the contractor's painters.

How we work to AMPP 4 answers

Which AMPP documents do you apply most often?

The surface preparation standards, mostly SSPC-SP 1, SP 10 and SP 6, the SSPC-VIS 1 photographs, SSPC-PA 2 for film thickness and SSPC-Guide 15 where salt testing is specified.

What if the specification and the paint data sheet disagree?

We send a written question before fabrication. The stricter requirement usually governs, but the Engineer of Record decides, and the answer goes onto the coating schedule.

Which coating products do you use?

Systems from Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint (IP). The products carry UL certification and sell across the US, so touch-up paint is easy to buy near the job.

Does AMPP cover galvanizing too?

Galvanizing itself follows ASTM A123. AMPP documents come in when galvanized steel is painted, for example the SSPC-SP 16 sweep blast before a duplex system.

More answers on every US code we design to: search all standards questions.

Before and after 2021

What changed when NACE and SSPC became AMPP

TopicBefore 2021Since 2021
PublisherTwo bodies, SSPC and NACE InternationalOne body, AMPP
Surface preparationSSPC-SP numbers, many shared as joint SSPC/NACE standardsSame numbers and requirements, published by AMPP
Corrosion and lining practiceNACE standard practicesCarried on by AMPP as they are revised
Coating inspectorsNACE CIP or SSPC inspector programsAMPP coating inspector certifications, alongside FROSIO and BGAS used worldwide
Painting contractors and shopsSSPC QP programsAMPP QP programs

Four kinds of AMPP document

The AMPP documents you meet on a steel coating job

A coating specification usually cites a mix of these. Each does a different job, and the specification decides which ones are binding.

Surface preparation standards

How clean the steel must be before coating: SP 1 solvent cleaning through SP 10 near-white and SP 5 white metal blast.

Measurement procedures

How a result is checked, such as SSPC-PA 2 for dry film thickness or holiday testing of linings.

Guides

Advice the specification can make binding, such as SSPC-Guide 15 on testing soluble salts on steel.

Qualification procedures

The QP programs that assess painting contractors and shops, and the inspector and applicator certifications for people.

Reading a coating specification

How we read an AMPP-based coating section before fabrication

  1. Exposure and system

    The exposure, often an ISO 12944 category, and the coating system named for it, coat by coat.

  2. Cited documents

    Every SSPC, NACE or AMPP document listed with its edition, so nothing is applied from memory.

  3. Spec against data sheet

    Blast grade, profile and film thickness compared with the paint manufacturer's data sheet; any conflict goes back as a written question.

  4. Hold points

    Coating hold and witness points written into the inspection and test plan for your inspector.

  5. Inspector access

    Your coating inspector joins in person in Vietnam or remotely, with the records in PEB Studio.

Ready for your coating inspector

What your AMPP-certified inspector receives from us

  • The coating schedule and the list of AMPP, SSPC and NACE documents it cites
  • The inspection and test plan with coating hold and witness points
  • Climate, cleanliness, profile and film thickness records by piece mark
  • Batch numbers of every coating product used, with data sheets
  • Remote access to members in the paint hall on request
  • Repair records for any coating defect found and corrected

Who does what on an AMPP coating spec

From the specifier to the site, each hand-off on the coating

A coating passes through four sets of hands on a World Steel job. Each one works to the same AMPP documents and hands a record to the next.

  1. Specifier and Engineer of Record

    • Set the exposure and the coating system
    • Cite the AMPP, SSPC or NACE documents and their editions
    • Name the inspection the owner wants
  2. World Steel paint shop

    • Prepares and coats the steel to the cited documents
    • Records every reading, checked by our FROSIO Level III and BGAS inspectors
    • Opens the hold points to your inspector
  3. Coating inspector

    • Witnesses the hold points, in person or remotely
    • Checks the readings against the specification
    • Accepts the steel before it is packed
  4. US contractor, our customer

    • Erects the steel
    • Touches up damage with the same product
    • Applies any field coats

AMPP questions on review

Four AMPP questions a coating reviewer asks, and our answers

Reviewers of an AMPP-based specification look past the products to the documents, the editions and the people.

Specification references

Which edition of each cited standard was applied?

Each AMPP, SSPC or NACE document is listed with the edition the specification names, before fabrication starts.

Joint standards

Old SSPC or NACE numbers in the spec: still valid?

Yes. The joint numbers carry the same requirement under AMPP, and any edition question goes back as a written query.

Owner's inspection clause

Who inspects, and to what qualification?

The inspection the specification names. Your certified inspector can witness every coating hold point in person or remotely.

Quality requirements clause

Is a QP-certified shop required?

Raised before award. No QP certification is held; our inspectors hold FROSIO Level III and BGAS, and how the requirement is met is agreed in writing.

For your coating inspector

Three records your coating inspector works from

Shared before the first member is blasted and kept live in PEB Studio while the job runs.

  • Cited documents list

    Every AMPP, SSPC and NACE document in the coating section, with its edition.

    SSPC surface preparation →
  • Inspection and test plan

    Coating hold and witness points with their acceptance criteria.

    How the ITP works →
  • Coating inspection records

    Climate, cleanliness, profile, film thickness and repairs by piece mark.

    Coating inspection →

Real photos from World Steel

Coating work your inspector can see, in person or remotely

Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.

Inspector walking a line of painted built-up members on the shop floor Photo
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Coated members drying in rows on stands in the paint hall Photo
Members drying in the World Steel paint hall in Vietnam after coating.
Galvanized steel frames with punched bolt plates at the corners on shop trestles Photo
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Crew loading steel parts onto the shot-blasting conveyor Photo
Parts going into the blaster ahead of primer, World Steel, Vietnam.

AMPP never works alone

The standards and guides it works with

Each link opens the full page, with its own questions and answers.

What we do not claim

World Steel works to AMPP, SSPC and NACE standards in its own paint shop. Its coating inspectors hold FROSIO Level III and BGAS painting inspector qualifications, not AMPP certification, and the company holds no AMPP QP certification. Where a specification requires either, it is settled before award, for example with an AMPP-certified third-party inspector appointed by you.

Who does what

World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.

Details confirmed in quote Edition: The editions your coating specification names

Source record: https://www.ampp.org/

Last checked: —. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.

All US codes & standards

Is your coating section written around AMPP standards?

Send it with the drawings. We list every document it cites, compare it with the paint data sheets and return the coating schedule and the hold points for your inspector.