Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Crane setting a rafter on a warehouse frame

Mining steel · Truck shops and site buildings

Truck shops sized for the biggest machines on the mine

Ultra-class haul trucks, loaders and dozers are serviced indoors, often in snow or desert heat. A truck shop needs very tall, wide bays with a crane that can lift a wheel motor or a dump body, plus wash, tire and component bays, a warehouse and offices. We design and fabricate it as one steel package.

Areas of a truck shop

What the shop package includes

Service bays

Tall clear-span bays with large door openings, crane runways and lighting supports.

Wash bay

Steel framed and coated for constant water, mud and wash chemicals.

Tire and component bays

Bays with tire handler access and crane-served rebuild areas.

Warehouse and offices

Mezzanines, stores and offices in the same frame or an attached building.

Doors and cranes set the frame

Designing for a truck that is taller with its body up

The governing dimension of a truck shop is the largest machine with its dump body raised, plus the crane hook height to lift components over it. That sets the eave, the crane rail level and the door height. Large door openings in the sidewalls then need heavy jambs and headers, and the crane runways run the full length of each bay.

We size the frame and runways for the crane data from your crane supplier, the door loads from your door supplier and the climate at your site, including heavy snow and drift on high roofs in northern states. Insulated wall and roof panels made in Vietnam can ship with the frame.

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Frame, crane runway and door framing design for your EOR’s review
  • Insulated roof and wall panels, when you want them
  • Mezzanines, stairs and platforms
  • Shop drawings at no extra charge

The US contractor, our customer, and others

  • Doors, cranes, lube and wash equipment
  • Foundations, slabs and trenches
  • Erection and building services
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a mine.

Rows of columns, rafters and purlins inside a large steel building Photo
Inside a finished World Steel frame on a job abroad (location not stated).
Long factory building framed with red tapered portal frames and roof purlins Photo
World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Truck shops: questions we hear

Can you design a shop for ultra-class haul trucks?

Yes. We design the bays, crane runways and door framing from your fleet dimensions and crane data, and your Engineer of Record approves the design.

Do you supply the doors and cranes?

We design and fabricate the steel and can supply panels made in Vietnam. Large doors and cranes are bought from their specialist makers, who give us the loads and clearances.

Can the shop be insulated for Alaska or Minnesota winters?

Yes. Insulated metal panels and roof insulation are designed for your climate, and the frame is designed for the snow loads at your site to ASCE 7-22.

Does World Steel provide shop drawings for mining steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes, the owner’s design criteria and the equipment data govern, and your Engineer of Record confirms them for each project. World Steel has no published mining project.

Talk to our mining steel team

Send the general arrangement drawings, the owner’s structural criteria and the area you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.