Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural steel for Washington’s earthquake country

Western Washington sits above the Cascadia subduction zone, with crustal faults such as the Seattle fault running under the Puget Sound cities and deep, soft soils in the river valleys and tideflats. Most commercial and industrial sites there land in a high seismic design category. The frame, its connections and its welds are designed for it from the first sketch.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Which seismic design category will my site be in?

It depends on the site class from your geotechnical report and the risk category of the building. Many Puget Sound sites land in Seismic Design Category D; your Engineer of Record confirms it, and we publish no value per city.

Can you fabricate special concentrically braced frames?

Yes. We fabricate braced and moment frames to AISC 341 where the design requires them, with AWS D1.8 qualified welders, demand-critical welds identified and protected zones marked.

Do you have seismic experience?

Yes. We design and fabricate to AISC 341 and AWS D1.8 for US projects and have supplied buildings in Guam, which is also highly seismic. We do not claim a completed building in Washington.

Official sources: Washington Geological Survey: earthquakes and faults

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.