Leans on the main frame
Uses the building columns. Fewer posts below, but the main frame is designed for the floor.
The use sets the load
Live loads come from the IBC and ASCE 7-22 by use. Pick one to see the minimum uniform load we design to before your Engineer of Record adds anything specific.
Offices
2.4 kN/m²
(50 psf)
Scale: heavy storage, 12.0 kN/m² (250 psf), fills the bar.
Partitions are added on top as their own allowance.
Corridors above the first floor
3.8 kN/m²
(80 psf)
Scale: heavy storage, 12.0 kN/m² (250 psf), fills the bar.
Exit paths carry crowds, so they get more than the offices around them.
Light storage
6.0 kN/m²
(125 psf)
Scale: heavy storage, 12.0 kN/m² (250 psf), fills the bar.
Shelving and boxed goods.
Heavy storage
12.0 kN/m²
(250 psf)
Scale: heavy storage, 12.0 kN/m² (250 psf), fills the bar.
Racked pallets and dense goods; rack makers give their own loads too.
Equipment platforms
From the vendor
Machine weights, footprints and vibration data come from the equipment maker.
Two ways to hold it up
Uses the building columns. Fewer posts below, but the main frame is designed for the floor.
Independent posts and bracing. The main frame is untouched and the floor can move later.
Photo
Photo
Photo
US codes
Set by the intended use, such as storage, office or equipment, under the IBC and ASCE 7.
Floors that people walk on or that carry sensitive equipment are checked for vibration as well as strength.
Occupancy and construction type may require fire-resistive protection.
A mezzanine can lean on the main frame or stand on its own columns, and that choice changes the frame design.
Stair geometry, guards and handrails follow the IBC and, for work platforms, OSHA requirements where they apply.
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
In the catalog
Photo
Photo
Photo
Photo
A mezzanine either connects to the building columns or stands on its own posts.
Design limit: Connecting to the main frame adds load and can change how the frame is braced, so the choice is made early in design. · What gets checked: Check mezzanine bolts for tightness; decking attachment is checked against the deck maker’s pattern.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
The intended use sets it under the IBC and ASCE 7-22: for example 2.4 kN/m² (50 psf) for offices, 6.0 kN/m² (125 psf) for light storage and 12.0 kN/m² (250 psf) for heavy storage. Your Engineer of Record confirms the values.
Yes. Floors that people walk on or that carry sensitive equipment are checked for vibration and deflection, not only strength.
Both work. Leaning on the main frame saves posts but means the frame is designed for the floor; a free-standing mezzanine leaves the frame untouched and can be moved later.
Yes, when the floor is designed for it. Rack makers give post loads and footprints, and we design the beams, deck support and columns for those point loads as well as the uniform storage load.
Stair geometry, guards and handrails follow the IBC and, for work platforms, OSHA requirements where they apply. Your design team confirms the occupancy.
Yes. The plant fabricates 2,500 t of structural steel a month, including multi-story frames for offices and plants. Our largest jobs run from about 2,500 t at the CPV Food factory to about 5,000 t at Sunpro Steel.
Keep reading
Price it or partner with us
Send the use, the size and the column grid. We design the mezzanine with the main frame and send drawings ready for your Engineer of Record.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.
Or call +84 902 881 833