Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Port structures several stories high under construction, drone view

Exported steel in place in Singapore: a World Steel job abroad, shown for the building type rather than a US site.

Florida · Flood zones

Steel buildings for Florida flood zones and storm surge

In a hurricane, water often does more damage than wind. Much of coastal Florida sits in FEMA special flood hazard areas, where storm surge, waves and heavy rain set the lowest floor, the foundation type and what can be built below it. Your design team sets the design flood elevation; we shape the steel around it.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Florida port.

Flood maps
FEMA Flood Insurance Rate Maps: zones V, VE, Coastal A, AE, A and X
Standard
ASCE 24 through the Florida Building Code, plus local floodplain rules
Key number
Design flood elevation, set by your engineer and the community
Steel role
Elevated frames, raised platforms, breakaway walls and vented enclosures

Flood zones

What each zone means for a steel building

ZoneWhat it meansWhat it means for the steel
V and VECoastal high hazard area, with waves of 0.9 m (3 ft) or moreElevate on piles or columns, keep the area below open or use breakaway walls; no dry floodproofing
Coastal AWaves of 0.45 to 0.9 m (1.5 to 3 ft), landward of the LiMWA lineASCE 24 applies many V-zone foundation rules; open or breakaway lower walls are common
AE and AOne-percent-annual-chance flood, mainly still waterElevate the floor, or dry floodproof a non-residential building; vented enclosures below the flood level
X (shaded and unshaded)Moderate or minimal flood hazardNo federal rules, but heavy rain still needs drainage and raised thresholds

Design options

How steel helps on a flood-prone site

Elevated platforms

Steel floor framing on columns lifts the occupied floor above the design flood elevation while parking or storage stays below.

Breakaway walls

Light wall panels and girts below the flood level designed to break away under waves without damaging the frame, as ASCE 24 describes.

Flood openings

Enclosures below the flood level get openings so water levels equalize, sized by engineering or at about 6,944 mm² per m² of enclosed area (1 sq in per sq ft).

Galvanized lower members

Columns and bracing that can be wetted by flood water are galvanized or given a heavier system.

Reactions for deep foundations

Pile and pier foundations get our column reactions, including combined wind and flood cases your engineer specifies.

Raised openings

Door sills, equipment and electrical rooms set above the flood level where the plan allows.

Who sets the flood design

Flood loads, scour, buoyancy and the design flood elevation are set by your design team under ASCE 24 and your community’s floodplain ordinance, which often adds freeboard. We design and supply the steel to those criteria; we do not certify elevations or flood-proofing.

Florida ecosystem

Products and solutions for this condition

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Real World Steel photos

World Steel at work

Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.
Red multi-story process tower frame next to a feed mill
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Coastal industrial zone with a steel warehouse, seen from the air
World Steel warehouse in a coastal industrial zone abroad, aerial photo.

Questions

What Florida buyers ask

Can a metal building go in a V zone?

Yes, if it is elevated on an open foundation with nothing but breakaway walls, parking, access or storage below the design flood elevation. Steel frames suit this well.

Can we dry floodproof a steel warehouse?

Non-residential buildings in A zones can be dry floodproofed under ASCE 24, with walls and shields designed for the flood loads. That design comes from your engineer; we frame the building to suit it.

Where do I find my flood zone?

On FEMA’s Flood Map Service Center and through your county’s floodplain administrator, who also tells you any local freeboard rule.

Official sources: FEMA Flood Map Service Center

Keep reading

Related pages

Code facts on this page summarize the Florida Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Florida?

Send the site address, size and use. We set the Florida criteria, design the steel to the Florida Building Code and quote it made in our Vietnam plant, with approvals for every envelope product coordinated in writing.