Responsibility diagram
Who does what under FAS, stage by stage
From packing at our plant in Vietnam to unloading at your US site. Navy is World Steel, red is you, and the dashed red line is where the risk of loss or damage passes to you.
Example of a named place: FAS named berth, Port of Ho Chi Minh City area, Vietnam (Incoterms® 2020). The quote states the exact place, because it moves the hand-over points.
Cost, risk and insurance
Paying for a leg is not the same as carrying its risk
Under every Incoterms® rule, cost and risk can pass at different points. Under FAS they work like this.
Where risk passes
When the steel is placed alongside the vessel at the named berth.
Who pays for what
Packing, loading, export clearance and trucking to the berth are ours. Loading on board, ocean freight, insurance, US entry, duties and delivery are yours.
Cargo insurance
Not required of either party. Arrange cover from the quayside.
US customs and duties
You are the importer of record
You, or the party you appoint, act as US importer of record and pay any duties, including Section 232.
Imported steel can be subject to US duties, including Section 232, and the rules change by proclamation. We publish no duty rates or landed costs. Our Section 232 page summarizes the current rules from official sources, and your licensed customs broker confirms the classification at entry.
-
Commercial invoice by line
Members and accessories grouped so each HTSUS line can be classified, with weights in kg and lb.
-
EN 10204 3.1 mill certificates
Mill, grade and heat number for the melt-and-pour declaration.
-
Certificate of origin
Steel made in our plant in Vietnam, with the mill and country of each heat on its certificate.
-
Documents in PEB Studio
Released to your broker’s login before the vessel arrives.
When it fits
FAS works well for
- Oversize members as breakbulkGirders and columns too long for a flat-rack, loaded straight from the quay.
- Chartered or project vesselsYou fix the vessel, we meet its loading window at the berth.
Watch out for
Points to settle before you sign
- Not for containersFor steel handed over in containers, FCA fits better: the container reaches the terminal long before it is alongside a ship.
- Laycan and berth datesSteel waiting on the quay is your risk. Share the vessel’s loading window early.
Our part under FAS
Heavy members are marked with weights in kg and lb, centers of gravity and lifting points, so your stevedores can plan every lift. The packing plan follows your erection sequence.
Why trade with World Steel
We know FAS, the US market and international trade
Buying steel from another country should not mean guessing who pays what. Our team prepares export files from Vietnam, works with US forwarders, customs brokers and truckers, and writes every quote so the Incoterm, the named place, the importer of record and the party carrying any duties are clear before you sign.
We work in English.
Your project manager, engineers and logistics team write, call and draw in English: quotes, contracts, shop drawings, packing lists, customs documents and PEB Studio. No interpreters and no language barrier, at hours that suit your US time zone.
We know the US market
Gateway ports, customs entries, Section 232, inland trucking and rail, and the US codes your building is designed to.
International trade is our routine
Export clearance in Vietnam, bills of lading, certificates of origin, mill certificates and bank documents, prepared in-house.
Every term, in writing
Each quote names the Incoterm, the named place, the importer of record and who carries duties. Nothing is left to assumption.
One language from quote to closeout
English across email, video calls, drawings and documents, so your broker, erector and lender read the same file.
Live in PEB Studio
Production, packing, seal numbers and documents released in real time, whichever term you buy on.
One accredited plant
Made in our own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472.
US gateway ports
Where a FAS shipment lands
We pick the port that keeps the inland leg short and has a suitable sailing from southern Vietnam. Each port page shows its terminals, rail links and the states it serves.
State guides
Building in a specific state?
Each state guide covers the code edition, wind, snow and seismic conditions, the ports that serve it and how steel reaches the site.
Questions from US buyers
FAS questions we hear
Which US ports take breakbulk steel?
Several do, including Houston, Tacoma, Mobile, Charleston and Jacksonville. Each port page on this site lists its breakbulk terminals.
Which Incoterm will my World Steel quote use?
The one you ask for, where it suits the job. FOB, CFR, CIF and DAP are the terms we quote most for US projects; DDP is quoted case by case. Every quote names the Incoterm, the named place and the importer of record in writing.
Does FAS decide when I own the steel or when I pay?
No. Incoterms® rules allocate delivery, costs, risk and customs formalities. Title, payment terms and remedies are set by the sales contract, which we write in English.
Incoterms® 2020
Compare with the other ten rules
Every rule has its own page with the same responsibility diagram, so you can compare what changes from one term to the next.
Closest to FAS: FCA (Free Carrier), FOB (Free On Board). Or see all eleven side by side.
Incoterms® is a trademark of the International Chamber of Commerce. This page is a plain-English summary for US buyers, not the ICC rules and not legal advice; the official Incoterms® 2020 publication governs. Each World Steel quote states the rule and its version.
Ready for a FAS quote?
Send the site address and what the building is for. We engineer it to US codes, make it in our plant in Vietnam and quote it on FAS or the term that suits you, with the named place and the importer of record in writing.