Virginia · Seismic
Seismic design for structural steel in Virginia
In August 2011 a magnitude 5.8 earthquake near Mineral, in Louisa County, was felt from Georgia to Canada and damaged buildings as far away as Washington, DC. It came from the Central Virginia Seismic Zone, and it reminds owners that Virginia sites still need a seismic check, especially on soft soils and for important buildings.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Virginia site through the Port of Virginia.
Going up beside the plant in Vietnam: World Steel framed its own office building.
- Source
- Central Virginia Seismic Zone
- Reference event
- Mineral, 2011, magnitude 5.8
- Design basis
- ASCE 7 site class and category
- Our part
- Bracing and connections
Why it matters
Moderate hazard, real consequences
Most Virginia sites fall in a moderate seismic design category, but soft soils, tall buildings and essential facilities can raise it. The category decides which systems are allowed and how connections must be detailed.
Your Engineer of Record sets the site class and category from the geotechnical report. We design or detail the braced or moment frames to match, and use AWS D1.8 qualified procedures and welders when the design calls for them.
What we design and fabricate
Seismic steel for Virginia
Braced frames
Braces and gussets detailed to the category.
Connections
Bolted and welded joints sized for seismic forces.
Base details
Base plates and anchors for shear and uplift.
Weld quality
AWS D1.8 procedures and records when required.
Who does what
Seismic design, split clearly
World Steel supplies
- Frames and connections detailed to the category
- AWS D1.8 qualified welders when required
- Protected-zone marking on request
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Geotechnical report and site class
- Engineer of Record approval and PE seal
- Special inspections on site
- Foundations and erection
- The permit
What we do not claim
We set no seismic category ourselves. The design category and system come from your Engineer of Record and the geotechnical report.
Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Virginia contractors
Virginia contractors: let’s win the next project together
If your next bid involves seismic design, World Steel wants to be your long-term, win-win steel partner in Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Virginia project is cut, welded, inspected and packed.
Q&A
What Virginia buyers ask
Does every Virginia building need seismic detailing?
Every building gets a seismic check; the category from ASCE 7 decides how much detailing is needed. Many sites need only ordinary systems.
Can you weld to AWS D1.8?
Yes. Our shop has AWS D1.8 qualified procedures and welders for seismic force-resisting systems when required.
Do soft soils change the design?
Yes. Softer site classes raise seismic forces. Your engineer sets the class from the geotechnical report.
Official sources: USGS: 2011 Mineral, Virginia earthquake
Virginia solutions
Every Virginia guide
Related pages
Code facts on this page summarize Virginia practice, the Virginia Uniform Statewide Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.
Building in Virginia?
Send the drawings or the site address, size and use. We set the Virginia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.