Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For investors and funds

Steel supply your lender, your buyer and your auditor can all check

Industrial and commercial assets trade on documents. World Steel fabricates the structural steel of your building in its own accredited plant and hands your team a data-room-ready record of what was supplied, inspected and shipped.

  • Scope and price fixed before you commit capital
  • Quality records ready for lenders and buyers
  • A fabricator whose references you can check

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Before and after

From the usual steel problem to the World Steel way

Cost exposure in developmentSteel is one of the largest swings in a shell budget.
A defined scope of supplyEvery inclusion and exclusion in writing, quoted line by line.
Thin records at exitBuyers and lenders ask for material and inspection records that nobody kept.
Records built for reviewMill certificates, weld and coating records indexed per building.
Suppliers you cannot verifyA fabricator overseas has to prove who it is.
Credentials you can look upIAS AC472 accreditation since 2019, audited twice a year, in a public directory.
And one more thing you get:
Capacity for a portfolio2,500 metric tons a month, enough to run several buildings in parallel.

Data room index

The data room index for your steel

Folders your asset manager receives for each building, ready to share with lenders, insurers and the next buyer.

The data room index for your steel

Materials

  • Mill certificates (EN 10204 3.1)
  • Heat-number traceability list
  • Bolt and fastener certificates

Quality

  • Inspection and Test Plan
  • Weld and dimensional records
  • Coating thickness readings

Engineering

Supply

  • Itemized scope of supply
  • Packing lists by container
  • Bill of lading and Incoterm

Request a quotation · Investors

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Become our partner in the US

Funds and platforms building across several US markets can agree program terms once and reuse them per asset.

See the Contractor Partnership Program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that investors use most, each with its own page to read before you call.

Ecosystem for Investors

  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What investors ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Request a defined-scope package
What documents come with each building?

A Manufacturing Data Record with mill certificates, inspection and coating records, calculations, approved drawings, packing lists and shipping documents, indexed per building.

Can you work through our general contractor?

Yes. That is the usual route. Your GC buys the steel and manages erection; your team gets access to the records and progress in PEB Studio.

How do we verify World Steel?

IAS AC472 accreditation is listed in the IAS public directory, ISO 3834-2 welding quality is audited by Bureau Veritas, and project references with photos are on our projects page.

Can several assets be supplied at the same time?

The plant fabricates about 2,500 metric tons a month and runs several projects in parallel, each with its own production slot confirmed in the quote.

Do you publish prices?

No. Every package is engineered to its site and quoted on its own scope.

Who is responsible for permits and the PE seal?

The US contractor and its Engineer of Record. World Steel prepares calculations and drawings for their review and approval.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.