Illinois · Local codes
Illinois local building codes and the Chicago Building Code for steel
Illinois is one of the few states without a single building code for most private buildings. Each municipality, and many counties for unincorporated land, adopts its own code, usually an IBC edition with local amendments. The City of Chicago enforces the Chicago Building Code, rebuilt on the IBC in recent years, and the Illinois Energy Conservation Code applies across the state.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Illinois site by rail through the Chicago hub.
- Most of the state
- Local IBC adoption
- Chicago
- Chicago Building Code
- Statewide
- Illinois energy code
- Our part
- Code basis on sheet one
Why it matters
The address decides the code
Two warehouses a few miles apart can follow different code editions, because Joliet, Elwood and unincorporated Will County each adopt their own. The design basis has to be set from the site address, not from the state.
We confirm the adopting jurisdiction, the edition and any local amendments with your Engineer of Record, then put them with the ASCE 7 loads on the first sheet of the calculations.
Design basis
Which code applies where
A summary for US buyers. Your Engineer of Record confirms the jurisdiction and edition.
| Site | Code that usually applies |
|---|---|
| City of Chicago | The Chicago Building Code, based on the IBC with Chicago provisions |
| Other municipalities | The IBC edition the city or village has adopted, with amendments |
| Unincorporated land | The county code where the county has adopted one |
| Energy, statewide | The Illinois Energy Conservation Code for commercial buildings |
| Structural loads | ASCE 7 as referenced by the adopted code |
Who does what
Code compliance, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for your engineer’s review
- Envelope details for the energy code
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and seal
- Plan review with the city or county
- Special inspections on site
- Foundations and erection
- The building permit
Illinois
What we do not claim
World Steel holds no City of Chicago, municipal or county approval and no Illinois engineering license. The design is sealed and submitted by your Engineer of Record.
Illinois ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Illinois contractors
Illinois contractors: let’s win the next project together
If your next bid involves local codes and Chicago, World Steel wants to be your long-term, win-win steel partner in Illinois. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Illinois project is cut, welded, inspected and packed.
Q&A
What Illinois buyers ask
Does Illinois have a statewide building code?
Not for most private buildings. Local governments adopt their own, usually the IBC. The energy code applies statewide.
Is the Chicago Building Code the same as the IBC?
It is based on the IBC with Chicago provisions. Your Engineer of Record confirms the requirements for your site.
Do you provide calculations for plan review?
Yes. We provide the calculations and drawings your Engineer of Record reviews, seals and submits.
Official sources: City of Chicago Department of Buildings
Illinois solutions
Every Illinois guide
Related pages
Code facts on this page summarize Illinois practice, local code adoption, the Chicago Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the code and edition in force for your permit.
Building in Illinois?
Send the drawings or the site address, size and use. We set the Illinois design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the rail trip to your site.