Colorado · Data centers
Structural steel for Colorado data centers
Data center campuses gather around Denver and Aurora, where fiber, power and a central location meet, and the dry climate helps cooling. A campus is built hall by hall, with heavy roof plant and yard equipment, under Front Range snow, wind and hail.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerData centers
- Clusters
- Aurora and Denver
- Pattern
- Hall by hall
- Roof
- Plant, snow and hail
- Yard
- Equipment steel
Why it matters
Repeat the hall, protect the plant
A data center campus repeats the same hall several times, so the steel model and details are reused and each later hall comes faster. Cooling units on the roof and generators and switchgear in the yard need their own frames and platforms.
Snow drifts against equipment screens and hail hits everything on the roof. We design the roof for snow, drift and equipment together, and frame screens and platforms for the site wind.
What we design and fabricate
Steel for data centers
Hall frames
Repeatable frames for data halls, released hall by hall.
Roof plant
Dunnage and platforms for cooling units.
Yard steel
Frames for generators and electrical equipment.
Service supports
Cable tray and duct support steel.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall frame and roof plant steel design or detailing
- Yard and equipment support steel
- Repeatable packages released hall by hall
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Mechanical and electrical design
- Engineer of Record approval and PE seal
- Local permit and inspections
- Foundations and slabs
- Erection and site work
Colorado
What we do not claim
World Steel names no data center operator as a customer and claims no completed Colorado data center.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Can you repeat the same hall across a campus?
Yes. We keep the model and the details so each later hall is released and fabricated faster.
How do you handle snow and hail around roof plant?
We design the roof for snow, drift and equipment together and frame screens and platforms for the site wind.
Can you work with a design-build team?
Yes. We work with your Engineer of Record and the mechanical and electrical designers from early design.
Official sources: Colorado Office of Economic Development
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.