Wyoming · Building code
Structural steel and Wyoming building code coverage
Wyoming’s Department of Fire Prevention and Electrical Safety adopts the IBC for fire and life safety statewide. Cities and counties that enforce building codes, such as Cheyenne, Casper and Teton County, adopt their own editions; many rural sites have no local building review. We confirm the code for each site.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail along I-80 for your Wyoming site.
- Statewide
- IBC fire and life safety
- Local
- Cities and counties
- Rural sites
- Often no review
- Our part
- Code stated on sheet one
Why it matters
Coverage varies by county
A data center in Cheyenne goes through city review, while a shop on a ranch or a mine site may only see state fire and life safety review. Owners, lenders and insurers still usually expect design to the IBC and ASCE 7.
We confirm the edition and reviewer with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The IBC edition for your site and the reviewing office, if any |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
Wyoming
What we do not claim
World Steel holds no Wyoming approval and no Wyoming engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
Wyoming ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wyoming contractors
Wyoming contractors: let’s win the next project together
If your next bid involves code coverage, World Steel wants to be your long-term, win-win steel partner in Wyoming. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wyoming project is cut, welded, inspected and packed.
Q&A
What Wyoming buyers ask
Is there a statewide building code?
The IBC applies statewide for fire and life safety; building codes are adopted locally.
What if my site has no local review?
We still design the steel to the IBC and ASCE 7 unless the owner directs otherwise.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: Wyoming Department of Fire Prevention and Electrical Safety
Wyoming solutions
Every Wyoming guide
Related pages
Code facts on this page summarize Wyoming practice, the code that applies at your site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wyoming?
Send the drawings or the site address, size and use. We set the Wyoming design basis with your Engineer of Record, design or detail the steel for Wyoming wind, drifting snow and northwest seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail along I-80 for the truck to your site.