Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Florida · Climate
Built for Florida heat, humidity, rain and lightning
Florida’s climate tests a building every day, not only in hurricane season. Humid air condenses on cool surfaces, roofs get hot under the sun, afternoon storms drop heavy rain and lightning strikes often. Each one has a detail we can solve in the steel and the envelope.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Florida port.
- Climate zones
- IECC climate zone 1A in Miami-Dade, Broward and Monroe; 2A in the rest of the state
- Energy code
- Florida Building Code, Energy Conservation
- Main moisture risk
- Condensation in air-conditioned buildings
- Lightning
- Florida has some of the highest lightning activity in the US
Climate details
What we design for in a hot, humid state
Condensation control
Continuous air sealing and a vapor control layer placed for a hot, humid climate, which differs from northern practice. Your designer sets its location; we detail the envelope to suit.
Cool, insulated roofs
Reflective roof colors and insulation chosen to meet the Florida energy code and cut cooling load.
Thermal movement
Steel panels move about 6 mm per 10 m (1/4 in per 33 ft) over a 50 °C (90 °F) swing. Standing-seam clips and expansion details let them move.
Intense rainfall
Gutters, downspouts and scuppers sized for local design rainfall, with secondary drainage so a blocked drain cannot pond the roof.
Lightning
An electrically continuous steel frame can form part of a lightning protection system designed by others to NFPA 780; we add bonding points where specified.
Ventilation
Ridge vents, louvers and wall fans for unconditioned sheds, with weather protection for wind-driven rain.
By others
Mechanical design, energy compliance forms, the lightning protection system and electrical grounding are by your designers and trades. We provide the envelope data and steel details they need.
Florida ecosystem
Products and solutions for this condition
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Florida solutions
Other Florida guides
Questions
What Florida buyers ask
Why does my metal building drip inside?
Usually condensation: warm, humid air meets a surface cooler than its dew point. Air sealing, insulation and a correctly placed vapor control layer stop it. We review this with your designer for air-conditioned buildings.
What roof color is best in Florida?
Light, reflective colors lower roof temperature and cooling load. The energy code and any local rule set the minimum; we offer colors and finishes to suit.
Does a steel building attract lightning?
Lightning strikes tall objects, whatever they are made of. A properly bonded and grounded steel frame helps carry a strike safely to earth as part of a designed protection system.
Keep reading
Related pages
Code facts on this page summarize the Florida Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Florida?
Send the site address, size and use. We set the Florida criteria, design the steel to the Florida Building Code and quote it made in our Vietnam plant, with approvals for every envelope product coordinated in writing.