Data centers
Quincy, Wenatchee, East Wenatchee and Moses Lake
Data hall frames, heavy roof equipment framing and phased campus steel, designed for Columbia Basin snow and wind and packed per building and phase.
West to east
Cross the state and the load that governs the steel changes every hundred kilometers: wind and salt on the coast, earthquakes on Puget Sound, snow in the Cascades, heat and wind in the Basin.
High seismic design categories, liquefiable river valleys and tideflats, port logistics, aerospace and multi-story work.
Marine air, heavy rain and coastal wind for ports, fish processing and industrial buildings.
Vancouver, Kalama and Longview: river ports, distribution near Portland and industrial sites on river soils.
Some of the heaviest snow loads in the country, rain-on-snow and drifting at every roof step.
Quincy, Wenatchee, Moses Lake, Yakima and the Tri-Cities: data centers on hydropower, fruit and potato storage, wind and summer heat.
Manufacturing and aerospace suppliers, cold winters, snow and long hauls from the coast.
Washington guides
One guide per Washington condition: earthquakes, codes and energy, snow, marine air, and the data centers, aerospace plants, cold stores and ports that drive the market.
Ready for Washington
2,500 metric tons of structural steel a month from our own plant, released in erection sequences.
Large-project program →Braced and moment frames designed and fabricated to AISC 341 where required, with AWS D1.8 qualified welders.
Seismic steel structures →Ground snow from the site data, drifts at roof steps and parapets, and rain-on-snow where it applies.
Snow load guide →Insulated panels and thermal details sized for the Washington State Energy Code compliance path.
Codes and energy guide →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Washington project at no extra cost, ready for your engineer’s approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Shipments planned to Seattle, Tacoma or a Columbia River port, packed in erection order for your site.
Washington ports guide →Solution advisor
Structural steel for the project types Washington builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Quincy, Wenatchee, East Wenatchee and Moses Lake
Data hall frames, heavy roof equipment framing and phased campus steel, designed for Columbia Basin snow and wind and packed per building and phase.
Everett, Renton, Moses Lake and Spokane
Long-span frames and trusses, crane-served assembly bays and large door openings framed for door reactions and seismic loads.
Kent Valley, Tacoma tideflats, Fife, Sumner and Vancouver
Clear-span or multi-span frames on seismic sites, with dock and cross-dock layouts and foundations planned with the geotechnical engineer.
Yakima Valley, Wenatchee, the Tri-Cities and the Columbia Basin
Insulated metal panel envelopes, galvanized or duplex-coated steel for washdown areas and frames sized for refrigeration and controlled-atmosphere rooms.
Puget Sound, Spokane and the I-90 corridor
Crane-served built-up frames, crane runway beams and mezzanines, with seismic bracing and snow drift at every roof step.
Seattle, Bellevue, Tacoma and Spokane
Multi-story steel frames with composite floors and braced or moment-frame cores designed to AISC 341, with the connection design your Engineer of Record specifies.
Statewide, from the Columbia River dams to the wind farms
Equipment buildings, switchgear shelters, substation structures and battery storage enclosures to the utility’s standards.
The Palouse, the Columbia Basin and the Skagit Valley
Potato and grain storage, machine sheds and processing plants with clear spans, ventilation openings and coatings for humid rooms.
The Washington ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Washington structures, beyond metal buildings.
Complete buildings engineered for Washington sites.
Members and parts made in our Vietnam plant.
The design basis behind every Washington permit set.
How you buy and follow your steel.
From the plant in Vietnam to your Washington site.
Buying steel from outside the US
The questions Washington owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant, the beam lines, welding checks, blasting, coating and packing. None is shown as a Washington site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Washington buyers
The Washington State Building Code: the International Building Code as adopted and amended by the State Building Code Council, with any local amendments of your city or county, plus the Washington State Energy Code. Seattle enforces its own amended versions. We confirm the edition with your Engineer of Record and building official, then design the steel with ASCE 7 loads for your site.
Yes. We design and fabricate seismic force-resisting systems to AISC 341 where the design calls for them, with demand-critical welds made by welders qualified to AWS D1.8, protected zones marked and mill certificates traced by heat. Your Engineer of Record reviews and seals the design.
Yes. Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released in erection sequences and shipped as they are fabricated.
Most often Seattle or Tacoma, run together as the Northwest Seaport Alliance. The Columbia River ports at Vancouver, Kalama and Longview suit Southwest Washington and long members shipped as breakbulk. We pick the port with the shortest haul to your site.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, seismic, snow and port questions for your site.
Honest status. World Steel designs and fabricates to the Washington State Building Code, ASCE 7 and AISC 341 where the design requires it. We hold no Washington State, City of Seattle or county approval and no Washington engineering license; drawing approval, the PE or SE seal, special inspection and the permit are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.