Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Sint Maarten steel solutions

Structural steel for large Sint Maarten projects, from Simpson Bay to Philipsburg

Hurricane Irma crossed Sint Maarten at full strength on 6 September 2017, after Luis in 1995 had done the same, and the country has been rebuilding ever since: the airport terminal, schools, shelters, hotels and homes. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to Port St. Maarten at Pointe Blanche.

Semper progrediens · Always progressing

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to Pointe Blanche

Crane setting a rafter on a warehouse frame
Exported steel in place in Philippines: a World Steel job abroad, shown for the building type rather than a US site.

National symbols of Sint Maarten

Built with respect for Sint Maarten

The white courthouse of Philipsburg from the coat of arms, the yellow sage that blooms on the dry hills, the monument to an island shared by two nations, and the sails of the yearly regatta. Four symbols, and what each one means for the steel we make for St. Maarten buildings.

The courthouse

The white courthouse on Philipsburg’s Front Street appears on the coat of arms. Public buildings that last are what the island rebuilds first.

The yellow sage

The yellow sage, the national flower, blooms on the dry hillsides. It survives wind and drought, and so must every frame we design here.

Two nations, one island

The friendship monument on the arms marks the island shared peacefully by two nations. We work the same way: you build, we fabricate.

The regatta

Every year the island’s yacht regatta fills Simpson Bay with sails. Marinas, boatyards and harbour buildings need steel that stands up to spray.

Why World Steel

What a large Sint Maarten project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released building by building.

Large-project program →

Ready for permit

Calculations that state the code basis for your engineer and VROMI.

Building permits guide →

Hurricane design

Roofs, openings, connections and anchors designed together, after Irma showed what fails first.

Hurricane guide →

Seismic and hillside detailing

Ductile frames and stepped bases for steep lots on an active arc.

Ground guide →

Coated for salt air

Paint systems and galvanizing for the lagoon, the bays and the windward east.

Coatings guide →

Shipped to Pointe Blanche

Packed in erection order and shipped to Port St. Maarten at Pointe Blanche.

Port delivery guide →

Five areas on the Dutch side

Pick your area. Each one has its own steel page.

The Dutch side of the island falls into five areas: Simpson Bay and the Lowlands with the airport and the west-end hotels, Cole Bay on the lagoon, Cul de Sac in the hills, Philipsburg with the port at Pointe Blanche, and the Dutch Quarter and the windward east. Each page covers the main places, the ground, the hurricane and earthquake conditions, the road from the port and the steel we recommend. The map is schematic.

The west and the lagoonPhilipsburg and the east

The west and the lagoon

Simpson Bay and the Lowlands, and Cole Bay: the airport, the hotels of Maho and Cupecoy, the marinas and commercial strip along Simpson Bay Lagoon.

Philipsburg and the east

Cul de Sac, Philipsburg and the Dutch Quarter: the capital, the port at Pointe Blanche, the hillside neighbourhoods and the beaches of the east coast.

Project types

What Sint Maarten builds in steel, and where

The four project types behind most steel orders on the Dutch side, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Tall columns and rafters inside a clear-span building with roof sheeting on

Schools, shelters and public buildings

Philipsburg and every area

Classrooms, halls, healthcare and government buildings designed to serve as shelters where required.

Clear-span interior on a World Steel job in southern Vietnam.

Curved long-span trusses being set during erection

Airport, port and marinas

Simpson Bay, Pointe Blanche, the lagoon

Terminal and hangar frames, port sheds, marina and boatyard buildings.

Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Buy it all in one place · Sint Maarten

Everything your project in Sint Maarten needs in steel, from one desk

Hotels and marinas rebuilt after storms, the airport, warehouses and shops. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Pointe Blanche, with every piece tracked live in PEB Studio.

All solutions and products for Sint Maarten

Picked for Sint Maarten

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF Pointe Blanche
  9. Your contractor erectsClearance at Pointe Blanche, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFPointe Blanche, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking St. Maartener contractor partners

St. Maarten contractors: you win the job, we fabricate the steel

Hotels and timeshare towers on the west end, the airport, schools, the hospital, shelters and government buildings, marina and port buildings and warehouses are large steel packages for half of a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Pointe Blanche and back your bid with drawings and live tracking.

  • Hotels and resorts
  • Schools, shelters and public buildings
  • Marina, port and airport buildings

Hurricanes, salt air, earthquakes

Steel for Sint Maarten’s storms and sea

A broad hazard picture for Sint Maarten and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Sint Maarten package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Sint Maarten.

Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Operator at the control panel of an automatic beam welding line, a built-up beam in front
Running the automatic beam line from its control panel, World Steel in Vietnam.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Steel bundles stacked high on a packing frame awaiting loading
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.

Caribbean logistics

Ports for Sint Maarten: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from St. Maartener buyers

Sint Maarten questions we hear most

Which building rules apply to steel buildings in Sint Maarten?

Building permits are issued by the Ministry of Public Housing, Spatial Planning, Environment and Infrastructure (VROMI). Your engineer of record agrees the code basis, wind speed and seismic values with the ministry, often based on US codes or Eurocode. We state that basis on the first sheet of our calculations.

Do hurricanes hit Sint Maarten?

Yes. Luis in 1995 and Irma in 2017 both crossed the island at full strength. Hillsides speed up the wind and surge reaches the low ground around the lagoon and the Great Salt Pond. We design the whole load path for the wind your engineer sets.

Is Sint Maarten an earthquake zone?

Yes. The island lies in the northern Lesser Antilles, where the Atlantic plate dives under the Caribbean plate. Steel frames are designed for the seismic values your engineer sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

Port St. Maarten at Pointe Blanche, east of Philipsburg, which handles both cargo and cruise ships.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the area and the plan. We tell you what Sint Maarten asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Sint Maarten and the US standards it references. We hold no approval, licence or registration in Sint Maarten and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Sint Maarten

Talk to us about steel for Sint Maarten

WhatsApp, email or a video call with our engineers, booked at an hour that suits Philipsburg. Our contact page for Sint Maarten has the ports, the local time and the form.