Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Mobile crane lifting a member into a multi-story steel frame

Going up beside the plant in Vietnam: World Steel framed its own office building.

Contractor desk

Your bid, our plant. Structural steel for US contractors.

General contractors, design-builders, EPC contractors and erectors price their steel packages with World Steel: one fabricator that owns its plant, fabricates 2,500 metric tons a month and ships to your US port.

  • 2,500 t a month
  • IAS AC472, first in Vietnam
  • Shop drawings included

I am a contractor

Fields marked * are required. It takes a few minutes.

You and your company
The project
Interested in *
Message and files

Products in your request

VICTOR Dang, Global Sales Director, World Steel Group

Your direct line at World Steel

VICTOR Dang

Global Sales Director, World Steel Group

View Victor’s profile

Who does what

Our plant builds the steel. Your crew builds the job.

A clear line between World Steel and you, the US contractor and our customer, so your bid carries the right scope on each side.

World Steel, Vietnam

  • Design calculations and drawings for your Engineer of Record
  • Shop and erection drawings, included
  • Fabrication, welding and coating in our plant
  • Mill certificates, QC records and inspection access
  • Packing by erection sequence, shipping to your US port

You, the US contractor

  • Engineer of Record approval, PE seal and permit
  • Foundations, anchor rods and site work
  • Steel erection and the crew
  • Local trades and building completion

Our engineers support your crew by phone and video while the frame goes up.

Contractor Partnership Program

Our production capacity is your capacity

Bid more steel without adding a shop. Contractors who build several jobs a year plan plant time around their pipeline with us, under one supply agreement across jobs and states.

Before you send

Questions contractors ask first

Something else? Write it in the message box and an engineer answers with your quote.

Do you work only with large contractors?

We are built for large jobs, at 2,500 metric tons a month, but we quote any US contractor with a real project. Many partnerships start with one building and grow.

Do you erect or install?

No. World Steel designs, fabricates and supplies the steel structure. You, the US contractor and our customer, erect it and handle the site, and our engineers support your crew by phone and video.

Can we visit or audit the plant before award?

Yes. Book a video walk-through from the US or visit the plant in Tay Ninh Province, Vietnam. Hold points on your job can be witnessed remotely.

What is the Contractor Partnership Program?

A long-term way of working for contractors who build several jobs a year: one supply agreement across jobs and states, and plant time planned around your pipeline. Tick "Partnership program" in the form to ask about it.