Data center steel for the Atlanta market
Metro Atlanta has become one of the largest data center markets in the US, with campuses in Douglas County, Fayetteville, Covington and around the perimeter. Campuses repeat the same building several times, sometimes on two or three levels, under heavy cooling and electrical equipment. We fabricate the steel in phases that match the build-out.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and landed at a Georgia port.
- Market
- Douglas County, Fayetteville, Covington
- Loads
- Heavy roof and yard equipment
- Forms
- Single-story and multi-story halls
- Supply
- Released per building and phase
Why it matters
Speed to power
A data center owner earns nothing until a hall is powered, so the steel for each phase is needed fast and in the right order. Repeat designs across a campus let us keep the drawings, piece marks and packing plans, and ship each building as one labeled release.
Atlanta’s humid summers put heavy cooling equipment on the roofs and in the yards. We frame for the weights and positions your mechanical engineer gives us, and supply insulated envelopes and condensation details to suit the halls.
What we fabricate
Steel for an Atlanta data center
Data hall frames
Long-span frames with clear heights for hot and cold aisle layouts.
Multi-story halls
Composite floor framing for stacked data halls where land is tight.
Roof equipment framing
Dunnage and support steel for cooling units, with loads from the mechanical design.
Equipment yards
Platforms and supports for generators, chillers and electrical gear.
Cable and pipe racks
Racks between buildings and inside halls, coordinated with the MEP layout.
Phased releases
Each building or phase packed and shipped as one labeled release.
What we do not claim
We name no data center operator as a World Steel customer and claim no Uptime tier or rating. Steel is fabricated to the design your Engineer of Record and the owner’s team approve.
Georgia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Georgia contractors
Georgia contractors: let’s win the next project together
If your next bid involves Atlanta data centers, World Steel wants to be your long-term, win-win steel partner in Georgia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Georgia project is cut, welded, inspected and packed.
Q&A
What Georgia buyers ask
Can you fabricate multi-story data halls?
Yes. We fabricate composite floor framing, columns and bracing for stacked halls to the Engineer of Record’s design, with the vibration criteria the owner sets.
Do you supply the envelope?
We can supply the frame alone or with insulated roof and wall panels, trims and openings as a complete package.
How do you keep up with a phased campus?
Each phase is released, fabricated and shipped as its own package, tracked in PEB Studio, from a plant that makes 2,500 metric tons a month.
Official sources: Georgia Department of Economic Development: technology
Georgia solutions
Every Georgia guide
Related pages
Code facts on this page summarize Georgia rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Georgia?
Send the drawings or the site address, size and use. We set the Georgia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, landed at Savannah and packed in erection order.