Structural steel for large projects in the US Virgin Islands

Irma and Maria struck the US Virgin Islands less than a fortnight apart in September 2017, after Hugo in 1989 and Marilyn in 1995. Since then the territory has been rebuilding hospitals, schools, power and water plants, and the resorts that bring its visitors. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to St Thomas and St Croix.

United in pride and hope

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to St Thomas

Red curved roof of a steel building, photographed from the air
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Three islands, two districts

Pick your island. Each one has its own steel page.

The US Virgin Islands are three main islands in two districts: St Thomas, with Charlotte Amalie, the Crown Bay cargo terminal and the airport, and St John across Pillsbury Sound, mostly national park; and St Croix to the south, the largest island, with Christiansted, Frederiksted and its own port on the south shore. Each page covers the main town, the ground, the hurricane and earthquake conditions, the port and road in, and the steel we recommend.

St Thomas and St JohnSt Croix

St Thomas and St John

The district of St Thomas and St John: Charlotte Amalie, the cruise and cargo harbour, the airport, and the national park island of St John across Pillsbury Sound.

St Croix

The district of St Croix, the largest island, about 64 km south: Christiansted and Frederiksted, the airport, farms, the south shore port and the industrial area.

Project types

What the US Virgin Islands build in steel, and where

The four project types behind most steel orders across the islands, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Red multi-story process tower frame next to a feed mill

Hospitals, schools and public buildings

Charlotte Amalie, Christiansted and every island

Composite frames for hospitals and clinics, schools and halls designed to serve as shelters.

Process tower frame by World Steel in Vinh Long Province, Vietnam.

Columns and floor beams of a multi-story steel frame partway through erection

Resorts and villas

St Thomas east end, St John, the St Croix north shore

Hotel buildings, villas and restaurants on steep or beachfront lots, designed for wind and salt.

Going up beside the plant in Vietnam: World Steel framed its own office building.

Tall lattice columns of a crane-served industrial building during erection

Power, water and industry

St Thomas, the St Croix south shore

Power and desalination plant buildings, pipe racks, tank supports and workshops.

Lattice crane columns on a World Steel job in Can Tho City, Vietnam.

Finished steel building in blue wall panels with a walk-in door

Ports, airports and logistics

Crown Bay, the south shore of St Croix, both airports

Warehouses, cargo sheds, terminal and hangar frames near the ports and airports.

Completed, clad building by World Steel in Quang Ngai Province, Vietnam.

Why World Steel

What a large Virgin Islands project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released building by building.

Large-project program →

Ready for permit

Calculations that state the code basis for your engineer and DPNR.

Building code guide →

Hurricane design

Roofs, openings, connections and anchors designed for hills and open coasts.

Hurricane guide →

Seismic detailing

Ductile frames and welds for the plate boundary and steep volcanic ground.

Ground guide →

Coated for salt air

Paint systems and galvanizing chosen for harbours, beaches and trade-wind ridges.

Coatings guide →

Shipped to two islands

Packed in erection order and shipped to Crown Bay or the south shore of St Croix.

Port delivery guide →

National symbols of the US Virgin Islands

Built with respect for the US Virgin Islands

The yellow ginger thomas flower, the bananaquit that lives on every island, the arcades and red roofs of the Danish towns, and the quelbe and quadrille of the festivals. Four symbols, and what each one means for the steel we make for Virgin Islands buildings.

The ginger thomas

The yellow trumpet flower of the ginger thomas is the territorial flower, blooming on every hillside. Its yellow leads the colours of this page.

The bananaquit

The small yellow-breasted bananaquit, the territorial bird, lives on all three islands. Small, tough and everywhere, like the steel that goes into island buildings.

The Danish towns

Charlotte Amalie, Christiansted and Frederiksted keep the arcades, red roofs and yellow walls of the Danish era. Old masonry and new steel stand side by side.

Quelbe and quadrille

Quelbe, the folk music of the islands, and the quadrille danced to it are part of every festival. Everyone knows the steps; our erection drawings work the same way.

Buy it all in one place · US Virgin Islands

Everything your project in the US Virgin Islands needs in steel, from one desk

Hospitals, schools and resorts being rebuilt on St Thomas, St John and St Croix. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF St Thomas, with every piece tracked live in PEB Studio.

All solutions and products for the US Virgin Islands

Picked for the US Virgin Islands

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF St Thomas
  9. Your contractor erectsClearance at St Thomas, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFSt Thomas, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Virgin Islander contractor partners

Virgin Islands contractors: you win the job, we fabricate the steel

Hospitals and schools being rebuilt on St Thomas and St Croix, the airports, resorts and villas on all three islands, power and water plants and warehouses at the ports are large steel packages for small islands. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to St Thomas or St Croix and back your bid with drawings and live tracking.

  • Hospitals, schools and public buildings
  • Resorts and villas
  • Power, water and port buildings

Hurricanes, salt air, earthquakes

Steel for US Virgin Islands’s storms and sea

A broad hazard picture for US Virgin Islands and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every USVI package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in the US Virgin Islands.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Labeled stacks of steel plate under a gantry crane
Raw plate stock waiting in the World Steel yard, Vietnam.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Fitter grinding a cut steel edge, sparks flying, on the shop floor
Cut edges are dressed before fit-up, World Steel plant in Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Hot-dip galvanized welded steel frames laid on trestles in a fabrication shop
Galvanized welded frames back from the kettle, laid out on trestles in the shop, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Caribbean logistics

Ports for the US Virgin Islands: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Virgin Islander buyers

US Virgin Islands questions we hear most

Which building rules apply to steel buildings in the US Virgin Islands?

The territory’s building code is based on the International Building Code, and permits are issued by the Department of Planning and Natural Resources (DPNR). Coastal sites may also need a Coastal Zone Management permit. Your engineer of record sets the design basis; we state it on the first sheet of our calculations.

How do hurricanes affect steel design in the Virgin Islands?

Hugo in 1989, Marilyn in 1995 and Irma and Maria in 2017 all struck the islands. Steep hills speed up the wind on St Thomas and St John. We design the whole load path for the wind speed and risk category your engineer sets.

Are the Virgin Islands an earthquake zone?

Yes. The islands sit near the boundary of the Caribbean and North American plates, and the 1867 Virgin Islands earthquake sent a tsunami into Charlotte Amalie and Frederiksted. Steel frames are designed for the seismic values your engineer sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which ports do you ship to?

Crown Bay on St Thomas and the container port on the south shore of St Croix. Steel for St John crosses from St Thomas by barge to Cruz Bay.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the island and the plan. We tell you what the US Virgin Islands asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for the US Virgin Islands and the US standards it references. We hold no approval, licence or registration in the US Virgin Islands and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.