The 2011 Mineral, Virginia earthquake cracked the Washington Monument and damaged the National Cathedral, a reminder that the District is not free of seismic risk. Hazard here is low to moderate, and soft soils near the rivers can raise the Seismic Design Category. Your Engineer of Record sets it for each site. We design the bracing for it and detail to AISC 341 where it applies.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore for your Washington, DC site.

Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Hazard
Low to moderate
Reference event
2011 Mineral quake
Design
AISC 341 where it applies
Welds
AWS D1.8-qualified

Why it matters

Low hazard is still a check

A hospital or school on soft soil near the Anacostia can land in a higher Seismic Design Category, and essential buildings carry a higher importance factor.

We design the lateral system for the category your engineer sets, detail to AISC 341 where it applies and weld demand-critical joints with AWS D1.8-qualified WPS and welders.

What we design and fabricate

Steel for seismic categories

Braced frames

Special concentric and buckling-restrained frame steel.

Moment frames

Prequalified connections under AISC 358 where specified.

Demand-critical welds

Welds made by AWS D1.8-qualified welders with procedures on file.

Anchorage

Base plates and anchor rods for the seismic reactions.

Who does what

Seismic steel, split clearly

World Steel supplies

  • Lateral system steel designed or detailed to AISC 341 where it applies
  • AWS D1.8-qualified procedures and welders for demand-critical welds
  • Protected zones marked on the members on request
  • Mill certificates traced by heat, with Charpy results on request
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Site class and Seismic Design Category by the Engineer of Record
  • Engineer of Record approval and PE seal
  • Special inspections and the quality assurance plan
  • Foundations and anchorage installation
  • Erection and site work

Washington, DC

What we do not claim

AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no Washington, DC engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.

Washington, DC ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Washington, DC contractors

Washington, DC contractors: let’s win the next project together

If your next bid involves seismic after 2011, World Steel wants to be your long-term, win-win steel partner in Washington, DC. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington, DC project is cut, welded, inspected and packed.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.

Q&A

What Washington, DC buyers ask

Does DC need seismic design?

Yes. Every building is checked for the category your engineer sets.

Is AISC 341 always required?

Only where the category and system call for it. Your engineer decides.

Is AISC 341 a certificate?

No. AISC 341 is a design standard. We design and fabricate to it where it applies.

Official sources: USGS Earthquake Hazards Program

Building in Washington, DC?

Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.