Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

St Kitts and Nevis steel solutions

Structural steel for large St Kitts and Nevis projects, from Basseterre to Charlestown

St Kitts grew sugar for three centuries, and the narrow-gauge cane railway still runs around the island. Today the federation builds resorts on Frigate Bay, the South East Peninsula and the beaches of Nevis, campus buildings for its medical and veterinary schools, factories and warehouses near Basseterre and the schools and clinics of both islands. We design and fabricate that steel in our own plant in Vietnam, 2,500 t a month, and ship it packed in erection order to Basseterre or Nevis.

Country above self

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to Basseterre

Factory frame by World Steel under erection, photographed by drone
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Fourteen parishes on two islands

Pick your parish. Each one has its own steel page.

St Kitts and Nevis has fourteen parishes: nine on St Kitts, from St George Basseterre with the capital and the South East Peninsula round the island to Sandy Point and Dieppe Bay, and five on Nevis, from Charlestown round Nevis Peak to Gingerland and Pinney’s Beach. Each page covers the main town, the ground, the hurricane and earthquake conditions, the route from the port and the steel we recommend for what gets built there.

Project types

What St Kitts and Nevis builds in steel, and where

The four project types behind most steel orders on the two islands, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Metal floor deck laid on each level of a steel-framed building

Campus and public buildings

Basseterre, Frigate Bay, Charlestown

Lecture halls, labs, clinics, offices and schools with composite floors and long spans.

Going up beside the plant in Vietnam: World Steel framed its own office building.

Why World Steel

What a large project in St Kitts and Nevis gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Hurricane design

Frames, purlins, cladding and anchors designed for the load path Hugo, Georges and Lenny tested.

Hurricane guide →

Seismic detailing

Ductile frames and welds detailed for the earthquake values your engineer sets.

Earthquake guide →

Ready for approval

Calculations that state the code basis for your engineer and the planning authority on either island.

Building code guide →

Coated for salt air

Paint systems and galvanizing chosen for beachfront resorts and two small islands in the trade winds.

Coatings guide →

Shipped to both islands

Packed in erection order and shipped to Basseterre, with Nevis loads to Long Point or Charlestown.

Port delivery guide →

National symbols of St Kitts and Nevis

Built with respect for St Kitts and Nevis

Green for the fertile land, red for the struggle from slavery to independence, gold for the sunshine, black for the African heritage and two white stars for hope and liberty. Four national symbols, and what each one means for the steel we make for buildings on both islands.

The two stars

Two white stars on the black band stand for hope and liberty, and for the two islands. One standard of care for both.

Brimstone Hill

The fortress on its volcanic hill, a World Heritage Site, was built to last centuries. We build steel to stay standing too.

The sugar train

The cane railway once carried sugar round the whole island to Basseterre. We pack steel the same way, in order, for the next stop on site.

The brown pelican

The national bird fishes the bays of both islands. Steel near those bays gets coatings made for salt air.

Buy it all in one place · St Kitts and Nevis

Everything your project in St Kitts and Nevis needs in steel, from one desk

Resorts and campuses on two islands, light industry and sports grounds. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Basseterre, with every piece tracked live in PEB Studio.

All solutions and products for St Kitts and Nevis

Picked for St Kitts and Nevis

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF Basseterre
  9. Your contractor erectsClearance at Basseterre, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFBasseterre, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Kittitian and Nevisian contractor partners

Kittitian and Nevisian contractors: you win the job, we fabricate the steel

Resorts on Frigate Bay, the South East Peninsula and Nevis, medical and veterinary campus buildings, warehouses near the Basseterre port, light industry and new schools and clinics are big steel packages. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Basseterre or Nevis and back your bid with drawings and live tracking.

  • Resorts and villas on both islands
  • Campus, schools and clinics
  • Light industry and warehouses

Hurricanes, salt air, earthquakes

Steel for St Kitts and Nevis’s storms and sea

A broad hazard picture for St Kitts and Nevis and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every St Kitts and Nevis package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in St Kitts and Nevis.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Fabricated members lined up along a railed walkway
Fabricated members lined up in a World Steel shop, Vietnam.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Painted beams with bolted end plates resting on stands below an overhead crane
Coated beams with end plates welded on, waiting for release in the Vietnam plant.
Gray members stacked and strapped together on a packing rack
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Caribbean logistics

Ports for St Kitts and Nevis: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Kittitian and Nevisian buyers

St Kitts and Nevis questions we hear most

Which building rules apply to steel buildings in St Kitts and Nevis?

On St Kitts, the Development Control and Planning Board approves new buildings; on Nevis, the Nevis Island Administration’s physical planning office does. Structural design follows the national building code, from the regional OECS model code, with US standards such as the IBC and ASCE 7 commonly used for the detail. We state the code basis your engineer of record sets on the first calculation sheet.

Do hurricanes hit St Kitts and Nevis?

Yes. Hugo in 1989, Luis in 1995, Georges in 1998 and Lenny in 1999 all did heavy damage, and Irma and Maria passed close in 2017. We design the whole load path for the wind speed your engineer sets.

Is St Kitts and Nevis an earthquake zone?

Yes. Both islands are volcanoes on the Lesser Antilles arc: Mount Liamuiga on St Kitts and Nevis Peak. Steel frames are designed for the seismic values your engineer sets.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

The Basseterre Deep Water Port for St Kitts. Steel for Nevis can go to Long Point or Charlestown, or cross from Basseterre.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the parish and the plan. We tell you what St Kitts and Nevis asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for St Kitts and Nevis and the US standards it references. We hold no approval, licence or registration in St Kitts and Nevis and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · St Kitts and Nevis

Talk to us about steel for St Kitts and Nevis

WhatsApp, email or a video call with our engineers, booked at an hour that suits Basseterre. Our contact page for St Kitts and Nevis has the ports, the local time and the form.