Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Sunpro Steel factory, 5,000 t of structural steel by World Steel

For general contractors

A structural steel supplier that ships in the order your crew builds

On a large job the steel package sets the pace of everything behind it. World Steel takes the whole package, from frame to trim, fabricates 2,500 metric tons a month in its own plant and ships it sequence by sequence to your US port.

  • Steel and metal envelope bought as one package
  • Loads packed in erection sequence for your crew
  • Submittals and quality records when the schedule needs them

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Where jobs get stuck

What general contractors tell us goes wrong

  • Five vendors for one buildingFrame, panels, trim and doors from different suppliers means five schedules to chase.
  • Slow submittalsLate shop drawings hold the whole schedule.
  • Deliveries out of orderSteel that arrives in the wrong order idles the crane and the crew.

What changes with World Steel

How we take those problems off your desk

  • One packageFrame, envelope and accessories bought from one fabricator.
  • Submittals ready earlyShop drawings included and released in the sequences you need.
  • Packed by erection sequenceBundles tagged and loaded so the first steel up is the first steel out.
  • Field supportThe engineers who detailed your steel answer RFIs while you erect.

Erection-sequence delivery

Your steel package, sequence by sequence

How a large package moves from our drawing office to your laydown yard. Each sequence follows the same path, overlapped with the next.

  • Shop drawings
  • Fabrication
  • Inspection
  • Packing
  • Shipping

Sequence AGrid lines A to D: columns, rafters, bracing

Shop drawings Fabrication Inspection Packing Shipping

Sequence BGrid lines D to H: frame and secondary steel

Shop drawings Fabrication Inspection Packing Shipping

Sequence CEnvelope: roof and wall panels, trims, doors

Shop drawings Fabrication Inspection Packing Shipping

Illustration of overlapping sequences. Your production slot and ship dates are confirmed in the quote.

Request a quotation

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Price your next steel package
Become our partner in the USGCs who bid with us regularly get private RFQs, a named estimator and engineer, and repeat-project terms. Steel erectors working under a GC are supported through the same program. Partner program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that general contractors use most, each with its own page to read before you call.

Ecosystem for General Contractors

  • Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
  • Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What general contractors ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Price your next steel package
What does a World Steel steel package include?

The primary frame, secondary steel, envelope, trims and accessories listed in the quote, with shop drawings, design calculations and the Manufacturing Data Record. Erection, foundations and permits stay with your team.

Can you ship in erection sequence?

Yes. Members are tagged with piece marks, bundled by sequence and loaded so each shipment arrives at your US port in the order it goes up.

How large a package can you take?

The plant fabricates about 2,500 metric tons a month. Our largest single jobs include Sunpro Steel at 5,000 t and CPV Food at 2,500 t.

Who stamps the drawings?

Your Engineer of Record reviews and approves them, and the PE seal and permit are your team’s scope. World Steel prepares the calculations and drawings for that review.

Can our inspector witness fabrication?

Yes, by live video, through your own third-party inspector or in person at the plant in Vietnam.

Do you work with erectors directly?

We supply through the contractor who buys the steel. Erectors working under a GC are supported with erection drawings and engineer access.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.