Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

New Mexico · Oil and gas

Structural steel for New Mexico Permian oil field sites

The Delaware Basin of southeast New Mexico, around Hobbs, Carlsbad and Artesia, is one of the most productive parts of the Permian oil field. Operators and service companies need process buildings, equipment shelters, shops and yard steel. We fabricate and galvanize that steel to the owner’s specifications.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your New Mexico site.

Long hot-dip galvanized ladder cages lying in a yard
Hot-dip galvanized ladder cages for a 50 m (164 ft) tower job, Vietnam.
Basin
Delaware Basin
Hubs
Hobbs, Carlsbad, Artesia
Coatings
Galvanized outdoors
Spec
Owner specifications

Why it matters

Hard sites, owner specs

Oil field steel stands in sun, wind and dust on remote pads, and operators specify materials, coatings and inspection in detail. Service company shops and yards need wide doors and crane bays.

We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel and pack it by system so each pad or shop goes up in order.

What we design and fabricate

Steel for energy sites

Equipment structures

Platforms and supports for process and electrical equipment.

Plant buildings

Process, compressor and maintenance buildings.

Galvanized steel

Hot-dip galvanizing for exposed outdoor steel.

Owner specifications

Fabrication to the owner’s project specifications.

Who does what

Energy steel, split clearly

World Steel supplies

  • Plant buildings, platforms and equipment steel
  • Fabrication to owner specifications
  • Galvanizing or coating systems for the exposure
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Foundations and equipment setting
  • Piping, electrical and controls
  • Erection and site work

New Mexico

What we do not claim

World Steel names no New Mexico energy or utility company as a customer and claims no completed New Mexico energy project. Process design and equipment are the owner’s scope.

New Mexico ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · New Mexico contractors

New Mexico contractors: let’s win the next project together

If your next bid involves Permian oil field, World Steel wants to be your long-term, win-win steel partner in New Mexico. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your New Mexico project is cut, welded, inspected and packed.

Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Primed column with its bolted end plate set on painting stands
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.

Q&A

What New Mexico buyers ask

Do you work to operator specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you galvanize the steel?

Yes. Hot-dip galvanizing is available for exposed members.

Do you name operators as customers?

No. World Steel names no company as a customer on this site.

Official sources: New Mexico Energy, Minerals and Natural Resources Department

New Mexico solutions

Every New Mexico guide

Related pages

Code facts on this page summarize New Mexico practice, the New Mexico Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in New Mexico?

Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.