Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Massachusetts · 780 CMR

Structural steel and the Massachusetts building code, 780 CMR

Massachusetts has one building code for the Commonwealth. The Board of Building Regulations and Standards adopts the IBC with Massachusetts amendments as 780 CMR, and local building officials review plans and inspect the work. The energy code is a town choice: base, stretch or specialized.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped through New York–New Jersey or Boston to your Massachusetts site.

Office block of World Steel standing between two fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Statewide code
780 CMR, IBC based
Adopted by
BBRS
Energy code
Base, stretch or specialized
Our part
Code edition on sheet one

Why it matters

One code, many energy rules

The same structural rules apply from Pittsfield to Provincetown, but snow, wind and flood change a lot across the state, and the energy code changes at the town line. On larger buildings 780 CMR also asks for construction control by a registered design professional, who follows the work on site.

We confirm the edition in force and the town’s energy code with your Engineer of Record before modeling, state the code basis and loads on the first calculation sheet, and detail the envelope steel to the insulation system your architect specifies.

Design basis

What the steel design states

The items we confirm with your Engineer of Record before modeling.

ItemWhat we state
Code edition780 CMR and the IBC edition it adopts
SnowGround snow, drift and sliding snow for the site
WindASCE 7 wind speed, exposure and risk category
FloodFlood zone and design flood elevation, when the site has one
EnvelopeGirt and purlin details for the town’s energy code

Who does what

780 CMR work, split clearly

World Steel supplies

  • Steel design or detailing to the stated code basis
  • Calculations and drawings for plan review
  • Answers to reviewer comments on the steel
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The building permit application
  • Engineer of Record approval and PE seal
  • Construction control and special inspections
  • Energy code compliance for the envelope
  • Foundations and erection

Massachusetts

What we do not claim

World Steel holds no Massachusetts approval and no Massachusetts engineering registration, and does not apply for permits or provide construction control. Your Engineer of Record seals the design and your team files it with the local building department.

Massachusetts ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Massachusetts contractors

Massachusetts contractors: let’s win the next project together

If your next bid involves 780 CMR and energy code, World Steel wants to be your long-term, win-win steel partner in Massachusetts. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Massachusetts project is cut, welded, inspected and packed.

Inspector walking a line of painted built-up members on the shop floor
Final look at coated members before they are released to packing, World Steel plant in Vietnam.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Welded members with drilled end plates laid out side by side
Members with drilled end plates waiting for release, Vietnam plant.
Reception and lobby of the World Steel head office in Ho Chi Minh City, with the World Steel sign and framed certificates
World Steel head office, 55 Le Thuc Hoach Street, Ho Chi Minh City: where visitors meet our engineers.

Q&A

What Massachusetts buyers ask

Does the same code apply across Massachusetts?

Yes. 780 CMR is the building code for the whole Commonwealth, enforced by local building officials.

Does the stretch energy code affect the steel?

Yes. Girts, purlins and steel crossing the envelope are detailed for the continuous insulation the town’s energy code asks for.

Who provides construction control?

A registered design professional on your team, usually the Engineer of Record. World Steel supplies the drawings and answers questions on the steel.

Official sources: Massachusetts Board of Building Regulations and Standards

Massachusetts solutions

Every Massachusetts guide

Related pages

Code facts on this page summarize Massachusetts practice, 780 CMR, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Massachusetts?

Send the drawings or the site address, size and use. We set the Massachusetts design basis with your Engineer of Record, design or detail the steel to the 780 CMR and to snow, drift and coastal wind, and quote it made in our plant in Vietnam, packed in erection order for the port and the truck to your site.