Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Mobile crane lifting a member into a multi-story steel frame

Going up beside the plant in Vietnam: World Steel framed its own office building.

Open call · US contractors who buy structural steel

World Steel is looking for US contractor partners

We want to build long-term, win-win partnerships with US general contractors, design-build firms, EPC contractors, developers, steel erectors and metal building dealers who need structural steel. You bring your market, your owners and your crews. World Steel brings its own plant in Vietnam: 2,500 metric tons of steel a month, the first and only IAS AC472-accredited fabricator in Vietnam, engineering to US codes and production you manage live in PEB Studio.

Win-win · long term

Your strengths in the US, our plant in Vietnam: one partnership

World Steel is looking for US contractors to build with for years, not for one bid. Each side does what it does best. You win and build the project in your market; the World Steel plant designs, fabricates and supplies the complete structural steel. Together you can take on larger projects than either side alone.

What you bring

US contractor, our customer

  • Your market and your owners

    You know your state, win the work and hold the owner relationship from bid to handover.

  • Approval, seal and permit

    Your Engineer of Record approves and seals the drawings, and you pull the local permit.

  • Foundations and erection

    Your crews cast the anchor rods, set the steel and run the site safely.

  • Your name on the building

    The project reaches the owner under your company brand, with World Steel as your OEM plant.

What we both win

Sustainable growth for both sides

  • Win more and bigger bids

    Bid structural steel packages far beyond what your own shop could fabricate.

  • Steel for your whole pipeline

    Plant time planned around the jobs you have coming, not one bid at a time.

  • Less risk on every job

    One supplier for the complete steel structure, with the scope of each side written down.

  • A partner for years, not one job

    The same team, details and records on file, so every next project starts faster.

What World Steel brings

The World Steel plant

  • 2,500 t of steel a month

    Our own 20,000 m² (215,000 sq ft) plant in Vietnam, sized for large projects and several jobs at once.

  • IAS AC472, first and only in Vietnam

    Accredited for design and fabrication since 2019 and audited twice a year by IAS.

  • 100% engineering support

    Calculations for your Engineer of Record, with shop and erection drawings at no extra charge.

  • Laser cutting up to 100 mm

    Laser machines cut and make holes in plate up to 100 mm (4 in) thick, for clean, accurate parts.

  • Production live in PEB Studio

    Follow every member of your job through the shop from the US, and share records with your owner.

World Steel designs and fabricates the steel; it does not erect, seal drawings or pull permits. Those stay with you and your Engineer of Record, which is why the partnership works.

Three ways to start the conversation

What every US partner gets

An engineering department, a plant and a project portal behind your name

Partner with World Steel and you can sell, bid and deliver steel buildings across the US without carrying engineering or fabrication overhead.

  • IAS AC472, first and only in Vietnam

    World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, for design (Part C) and fabrication (Part A). Your plan reviewer can verify it in the IAS directory.

  • Engineering, 100% supported

    Every partner job gets full engineering from our design office: framing concepts, the calculation package, anchor rod plan, approval drawings and erection drawings. You do not need an in-house steel engineer to sell or bid a metal building.

  • OEM manufacturing under your brand

    World Steel builds your project as its OEM manufacturer. Piece labels, bundle tags and product labels carry your brand and project information, so the building reaches your client under your name.

  • Real-time control in PEB Studio

    Follow every member of your job through cutting, welding, coating, QC and loading from the US, and share released records with your owner or special inspector.

  • Value Engineering to US codes

    We compare framing schemes, bay spacing and member sizes against IBC, ASCE 7 and AISC 360 so you can offer the owner a leaner building that still meets the code your jurisdiction enforces. Your Engineer of Record approves every change.

  • Completed projects in the US

    10 published projects in the United States and the US territory of Guam, designed to American codes and shipped from our plant. Show them to your owner when you name World Steel.

  • Fabricated to US standards

    Design to AISC 360 and AISI S100, welding to AWS D1.1, materials to ASTM grades with mill certificates traced to every member. US specifications are the baseline on your jobs, not an add-on.

  • An internationally trained team

    More than 300 people in engineering, production and QC, trained to international codes and quality procedures, working in Tekla Structures and SAP2000 and documenting each job in English.

  • Drawings ready for your approval

    Calculations and drawings to US codes, ready for your Engineer of Record to review, approve and seal for the permit.

  • Shop drawings at no extra charge

    Every partner job comes with shop drawings from our detailers, included in the scope at no extra charge, from the anchor rod plan to the erection drawings.

  • Submittals your reviewer can follow

    Calculation reports, approval drawings and revision logs are prepared for your EOR and building department, and the anchor rod plan reaches your foundation engineer early.

  • One complete building package

    Primary frames, purlins and girts, roof and wall panels, trim, doors and accessories engineered together and shipped as one package, so the interfaces are ours to solve.

  • US-grade materials, traced

    Steel ordered to the ASTM grades you specify, mainly from mills in Vietnam, then fabricated in our own plant, with origin documented member by member.

  • Delivered to your nearest US port

    Steel is packed in erection order and shipped from Vietnam to a West, Gulf or East Coast port. Every quote names the Incoterm and the importer of record.

  • Factory direct, with a US office

    You buy from the manufacturer, not a broker. Our Westminster, California office coordinates quotes, submittals and support in US time zones.

Partners wanted · all 50 states

We are looking for contractor partners in every US state

World Steel is building a network of US contractors who win and build the projects in their own state, with World Steel supplying the complete structural steel. You know your market, your owners and your building department. We bring the design office, the plant in Vietnam and the steel, delivered to your nearest US port.

  • General contractors

    You hold the owner contract, run the site and want one steel supplier for every building you bid.

  • Design-build firms

    You bring the structure in early and need framing options before the price is fixed.

  • Steel erectors

    Your crews set steel and want packages that arrive complete, marked and in erection order.

  • Metal building dealers

    You sell buildings under your own name and need a plant and engineering team behind it.

What you bring in your state

  • A contractor license where your state issues one
  • Your Engineer of Record for drawing approval and the seal
  • Foundations, erection crew, crane and site safety
  • The owner relationship and the local permit

Each state page covers the adopted code edition, typical site loads and the nearest gateway ports. Partnership is never exclusive.

Building in the Caribbean? Caribbean contractor partnership

Your fabrication arm in Vietnam

Our production capacity is your capacity

You do not need your own fabrication shop, steel detailers or a design office to bid bigger work. As a World Steel partner, our plant works as your fabrication arm: when you win the job, its engineering team, welding lines, paint hall and packing yard are working for your project.

  • Bid larger buildings and several jobs at once without adding shop overhead
  • Offer owners the complete structural steel package, not just a frame
  • Keep your crews on what they do best: erection and the site
  • 2,500 tstructural steel a monthmetric tons (about 2,750 US tons)
  • 20,000 m²fabrication plantabout 215,000 sq ft, in Tay Ninh Province
  • 300+peopleengineering, production and QC
  • IAS AC472first and only in Vietnamdesign and fabrication, since 2019

Clear lines between us

World Steel supplies the complete steel structure. You build the project.

One supplier for every piece of structural steel on the job, from the calculations to the last anchor bolt, and one US contractor who owns the site, the crew and the client. The final split is written into each contract so nothing falls between us.

World Steel scope · made in Vietnam

The complete structural steel package

  • Design and calculations

    Structural design to US codes and a calculation package for your Engineer of Record.

  • Shop and erection drawings

    Anchor rod plan, shop drawings and erection drawings, included at no extra charge.

  • Primary framing

    Built-up and hot-rolled columns, rafters, beams, trusses and tapered frames.

  • Secondary steel

    Purlins, girts, eave struts, roof and wall bracing, sag rods.

  • Floors and access steel

    Mezzanines, floor beams, deck, platforms, stairs and handrails.

  • Crane steel

    Crane runway beams, brackets and crane-supporting structures.

  • Roof and wall envelope

    Metal roof and wall panels, trim and flashings, when you order the full building.

  • Connections and fasteners

    Connection plates, base plates, structural bolts and anchor bolts.

  • Coating and QC

    Shot blasting, shop coating and inspection records for each member.

  • Packed and shipped to the US

    Bundled in erection order and shipped to the US port named in the quote.

What World Steel does

World Steel

  • Structural steel design and calculation package for your Engineer of Record
  • Anchor rod setting plan first, then shop and erection drawings, included at no extra charge
  • Steel procurement, fabrication and shop coating in our Vietnam plant
  • Inspection to the agreed ITP, with records for each member
  • Packing in erection sequence plus container documentation
  • Ocean freight coordination under the agreed Incoterm
  • Remote technical support for your erector from our engineers, with site supervision on request
  • One project manager for the whole job, plus PEB Studio access for your team

What the US contractor does

US contractor (your company)

  • The prime contract and the relationship with the owner, drawing approval and the PE seal through your Engineer of Record, and the local building permit
  • Concrete foundations, with anchor rods cast in to the World Steel setting plan
  • Customs entry, port pickup and inland delivery, unless the Incoterm covers them
  • The erection crew, the crane and safety on site
  • Interior build-out and trades outside the steel package

World Steel designs, fabricates and supplies the steel; it does not erect and has no US yard or erection crew. Your job is managed by our team in Vietnam, with calls set for hours that suit your US time zone, and our US office is in Westminster, California.

A partnership, not a purchase order

Every job makes the next one easier

Buying steel one bid at a time means starting from zero each time. As a World Steel partner, what you set up on the first job carries into every job after it.

  1. Judge us on a real bid

    Your first job

    Start with one open bid. You get a technical review, a written scope and approval drawings for your Engineer of Record, and you watch the steel go through our plant in PEB Studio before you commit to anything more.

    • Technical review of the bid set
    • Shop drawings at no extra charge
    • Live production in PEB Studio
  2. Less setup on every job

    Repeat work

    From the second job on, the groundwork is already done. Your labels, your ITP hold points, your preferred details and the design basis of the states you bid in are on file, so each new quote starts from what you already approved.

    • Brand and label kit set once
    • ITP format agreed once
    • Same project manager and design team
  3. Plan the pipeline together

    Program partner

    When you run several buildings a year, we plan engineering and plant time around your pipeline, keep one supply agreement across sites and states, and review each finished job with you so the next one goes smoother.

    • One agreement across jobs and states
    • Plant time planned around your pipeline
    • Lessons from each job built into the next

Kept on file for partners

What you never have to explain twice

Repeat jobs start from your approved setup, not a blank form.

  • Design basis by jurisdiction

    Code editions, local amendments and the load criteria your Engineer of Record confirmed for each state you work in.

  • Your brand kit

    Logo, label layout and project fields for piece labels and bundle tags under your name.

  • Your ITP and hold points

    The inspection points you witness, online or in person, set once and reused.

  • Your preferred details

    Connection styles, trim profiles and panel choices your crews already know how to install.

  • Your packing preferences

    Bundle sizes, labeling and loading order your laydown area and erector work best with.

  • People who know your jobs

    The same project manager and design team, so nobody has to learn your company again.

OEM manufacturing · private label

Your brand on the label, our plant behind it

World Steel is the OEM manufacturer for your project. We engineer and fabricate the building, and the piece labels, bundle tags and product labels carry your brand and your project information. Your client buys from you; we stay in the background.

100% of the materials are produced by mills and factories in Vietnam, and every member is fabricated in our own IAS AC472-accredited plant there.

  • Your brand and project details on piece labels and bundle tags
  • Product labels in your name, agreed before the first job ships
  • Engineering and fabrication by World Steel, to US codes
  • 100% of materials from mills and factories in Vietnam
  • Mill certificates traced to every member
  • Records released under your project in PEB Studio
Illustration
Project
Your project name
Piece mark
RF-12 · Grid B/3–4
Member
Rafter, built-up
Length
12,000 mm (39 ft 4 in)
Weight
1,248 kg (2,751 lb)
Bundle
B-07 · erection area 2
Materials: 100% VietnamMade in Vietnam
How a piece label can look under your brand. Content is agreed with you before the first job ships.

Why contractors partner with us

Six ways an imported steel package can hurt your margin

When an overseas supplier is vague, short or late, the GC and the erector absorb it. A real partner takes those exposures off your job one at a time.

Stage
The usual risk
With World Steel as your partner
Bid
The usual riskCarrying a steel number nobody has engineered
With World SteelYou receive a written scope with inclusions, exclusions and the design basis spelled out, so the figure in your bid is tied to the same code edition and loads the frame will be fabricated to. Value Engineering →
Scope gaps
The usual riskFrame from one vendor, panels and trim from another
With World SteelPrimary framing, purlins and girts, roof and wall panels, trim and accessories can ship as one coordinated package, so the interfaces are ours to solve instead of a change order on your job. Building packages →
Submittals
The usual riskShop drawings stuck in review loops
With World SteelApproval drawings and calculations are prepared for your Engineer of Record with logged revision numbers, and the anchor rod plan and column reactions reach your foundation engineer early. Design process →
Schedule
The usual riskAn erector on standby and the wrong bundle in the box
With World SteelSteel is packed by area and erection sequence, every container is photographed and filmed before sealing, and readiness for each erection step shows up before you book the crane. Packing & shipping →
Owner pressure
The usual riskAn owner asking for progress you cannot prove
With World SteelFabrication, inspection and packing records post to PEB Studio as they happen, so you hand the owner verified status instead of a vendor’s word. PEB Studio →
Closeout
The usual riskChasing mill certs to get retainage released
With World SteelMill certificates, inspection records and as-built documents are collected per member during the job and delivered as a sealed digital closeout package. Quality records →

Before you put our name in your bid

The worries every contractor has, answered straight

Naming an overseas fabricator puts your reputation on the line. These are the questions US contractors ask us first, and what we do about each one.

The worry: “Will you go around me to my owner?”

The owner stays your client

You hold the contract and the relationship. We build under your brand as your OEM manufacturer, and the owner sees only the records you choose to release in PEB Studio, never our pricing to you.

OEM under your brand →

The worry: “One bad first job could cost me the client.”

Proof before your name is on it

Check our IAS AC472 accreditation in the IAS directory, review the calculations with your Engineer of Record, and witness the hold points you pick, live on video or at the plant, before the steel ships.

IAS AC472 accreditation →

The worry: “If a piece is wrong, my crew stands around.”

Modeled, checked, packed in order

Every member is modeled in Tekla Structures, cut only after you approve the shop drawings, measured by QC and packed by erection area with a packing list and photos for each container.

Shop drawings, included →

The worry: “My foreman needs answers today, not next week.”

Engineers on call in your hours

Your project manager and our engineers set call times that suit your US time zone. Your crew can scan a piece mark to see where it goes, and questions from the field go straight to the people who drew it.

PEB Studio tracking →

The worry: “Who carries the field work and the permit?”

A clear split, in writing

We design, fabricate and supply the steel. Your company keeps erection, the site, drawing approval and the seal through your Engineer of Record, and the permit. The split is written into every contract.

Scope split →

The worry: “Partnering will tie my hands.”

No exclusivity, ever

Partnership creates no exclusivity. You send us the jobs where we make sense, and every job is agreed on its own contract.

Ways to work together →

Ways to work together

Three ways to partner, all backed by one plant

Choose the model that matches how you win work. Each one is written into an agreement for the job or the program it covers.

Job by job

Bid partner

For general contractors and metal building dealers pricing a steel building or a structural package. Send the bid set; we return a technical review, a list of clarifications and a priced scope you can carry into your number.

  • Technical review of the bid documents
  • Clarifications flagged before you price
  • Scope with inclusions and exclusions
For General Contractors →
In at concept

Design-build partner

For design-build firms that need the structure settled before the GMP is fixed. We develop framing options and Value Engineering alongside your design, under IAS AC472 Part C design accreditation.

  • Framing and span options at concept stage
  • A calc package your EOR can review line by line
  • Steel and envelope coordinated from the start
For Design-Build Contractors →
Multiple buildings

Program supplier

For contractors and developers running a series of buildings across sites or states. One supply agreement, one ITP format, Tekla model exchange in IFC, and traceability from mill certificate to member on every job.

  • One ITP format with your hold and witness points
  • Tekla detailing and IFC exchange
  • Consistent packing and documentation
For EPC & Industrial Contractors →

Steel erectors, metal building dealers and material distributors who buy and resell World Steel packages use the same application. Metal Building Dealers & Distributors · Building Material Suppliers

PEB Studio · for the contractor

Manage the steel package of your job in one account

Every member gets a piece mark and QR code in the Tekla model that stays with it through the shop, the inspection, the container and your laydown area. Partners see those records the moment they are created and decide what the owner gets to see.

  • Schedule crew and crane on facts

    Container packing reports list what is in each box and in which erection order, so labor and lifts are planned against actual contents, not a vessel ETA.

  • Back up your pay applications

    Weekly production reports and stage-by-stage progress give you verified numbers for OAC meetings and monthly pay apps.

  • Find any piece in the laydown area

    Your foreman scans a piece mark or searches by gridline and elevation to see where it goes and whether the rest of that sequence has arrived.

  • Share records, not your pricing

    Client views show released documents only, with no internal notes and no prices. A member passport opens read-only by QR, so a special inspector can check a beam without an account.

  • Witness without a plane ticket

    The ITP you approve sets where the shop stops for you. Join those checks on Zoom or Microsoft Teams, send a third-party inspector, or visit the plant.

  • One closeout file for the owner

    Released documents get a SHA-256 fingerprint at closeout, so what you turn over is exactly what was approved.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

On a live bid

Eight steps from the ITB to closeout

The same sequence on every partner job, from the first drawing you forward to the closeout file your owner keeps.

  1. Forward the bid set

    Drawings, specs and the site address, or just the footprint if design is still early.

  2. Clear questions first

    We check loads, code edition and scope, and list what to resolve with the owner’s engineer.

  3. Price with our scope

    An itemized scope of supply with inclusions, exclusions, design basis and Incoterm.

  4. Award and approval

    Approval drawings and calcs go to your Engineer of Record. Cutting waits for your release.

  5. Follow the shop

    Track progress in PEB Studio and attend hold points online or at the plant.

  6. Receive in order

    Containers come packed by erection area, each with a packing list and load photos.

  7. Your crew sets steel

    Your erector works from our erection drawings and piece marks, with our engineers on call.

  8. Close out

    As-builts and quality records for the owner, packaged and sealed at release.

References for your owner

Projects to cite when you name World Steel

Completed work you can show an owner or design team when you list World Steel USA as your steel supplier.

Browse all projects

Real photos from World Steel

The plant that builds your partner jobs

Welding lines, fit-up checks, QC, the paint hall and export packing in our own plant in Tay Ninh Province, Vietnam, plus a finished building. Click any photo to enlarge it. Not stock images.

Long shop floor of built-up members, overhead cranes and a center walkway Photo
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Fitter comparing a built-up beam with its shop drawing Photo
In the Vietnam shop, fit-up is compared with the shop drawing before final welding starts.
Quality inspector taking dimensions on a finished steel member Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Coated members drying in rows on stands in the paint hall Photo
Members drying in the World Steel paint hall in Vietnam after coating.
Painted members strapped into bundles and stacked for the voyage Photo
Bundles made up for an export shipment at the Vietnam plant.
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Finished steel building in blue wall panels with a walk-in door Photo
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.

Worry-free shipping

You order the building. We take care of the shipping.

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Becoming a partner

How the application works

  1. Apply

    Company name, contact, trade (GC, design-build, erector or dealer) and your state contractor license number where your state issues one. Attach an open bid if you have one.

  2. Verification

    We confirm the company and the contact person before sharing any project documents.

  3. First job

    A technical review and priced scope on a real bid, so you can judge us on actual work.

  4. Working setup

    A named project manager, an agreed ITP and your PEB Studio login once a contract is signed.

Contractor questions

What US contractors ask before listing us

Who sets the steel on site?

Not World Steel. Your own crew or the steel erector you hire sets the steel. World Steel supplies the steel structure only: erection drawings, packing in erection sequence and engineers on call for your crew, with site supervision on request.

Can the owner or special inspector see our job in PEB Studio?

Only if you want them to. Client views show released documents with no internal notes or prices, and a member passport opens read-only from its QR tag without a login. You control who sees what.

Who seals the structural drawings?

World Steel designs the metal building system under its IAS AC472 accreditation and prepares calculations and drawings for the project’s Engineer of Record. Your Engineer of Record reviews, approves and seals them; the seal and permit are your scope as the US contractor. Wind, snow, seismic and exposure criteria are confirmed in writing before members are sized.

Is the partnership exclusive?

No. Partnering creates no exclusivity, and it implies no federal qualification or domestic-content status beyond what is written into each project contract. Federal work should be checked with the contracting officer before you bid imported steel.

We bid in several states. Does the program cover all of them?

Yes. The design basis is set for each jurisdiction, including the IBC edition and local amendments it has adopted, and freight is quoted to the US port that suits each job. The state market pages below summarize what to confirm.

How do duties and customs work on our jobs?

Each quote names the Incoterm and the importer of record. Imported steel can be subject to US duties, for example Section 232, and the quote states who carries them. We publish no duty rates.

Can you manufacture under our brand?

Yes. World Steel works as your OEM manufacturer: piece labels, bundle tags and product labels can carry your brand and your project information. Tell us what the labels should show when you send the first job.

Where do the materials come from?

Mainly from mills and factories in Vietnam, with Japan, Korea, Indonesia or Thailand when the specification calls for it; OEM and private-label supply uses 100% Vietnamese materials. Every member is fabricated in World Steel’s own plant in Tay Ninh Province. Mill certificates are traced to each member and released to you in PEB Studio.

Why partner long term instead of buying job by job?

Because every job after the first starts faster. Your brand kit, ITP hold points, preferred details and the design basis of the states you bid in stay on file, the same project manager and design team stay on your account, and plant time can be planned around your pipeline instead of one bid at a time.

Will World Steel contact or sell to our owner directly?

No. You hold the contract and the owner relationship. We build under your brand as your OEM manufacturer, and the owner sees only the records you release in PEB Studio, never our pricing to you.

Do shop drawings cost extra?

No. Shop drawings come with every project, included in the scope at no extra charge, and cutting starts only after you approve them.

How do we get started?

Apply through the contractor form with your company details and the type of work you bid. If a bid is open now, attach the documents and we begin with a technical review of that job.

Have a metal building on your bid list?

Send the bid documents or just the footprint. You get a technical review and an itemized steel scope you can price with confidence.

Download center

Documents to download

All documents

Sample submittal documents