Mining steel · Conveyors

Conveyor galleries and trestles, by the kilometer

Conveyors tie a mine together, from the crusher to the stockpile, the plant and the load-out. Their steel is long, repetitive and exposed: truss galleries spanning between trestle bents, walkways along the belt, covers against wind and weather. That makes it a natural package for a large plant that fabricates the same span again and again.

Built from repeated spans

A gallery is a repeated truss, so design it once

Most conveyor routes are made of a few standard gallery spans, a few trestle bent heights and special pieces at the drives, the transfers and the crossings. We design a typical span and bent for the loads in your criteria, then the special pieces, so the whole route is fabricated from a small family of repeated spans and bents with consistent piece marks.

Belt loads, material loads, belt tension at the drive and take-up, and idler spacing come from the conveyor designer, who usually follows the CEMA guidance for belt conveyors. We add the structure’s own weight, walkways, covers, wind, snow, ice and seismic forces to ASCE 7-22, and check the gallery for deflection limits the conveyor needs.

Galleries are usually galvanized, because they are exposed for decades and hard to repaint over a running belt. Our hot-dip galvanizing option is listed in the corrosion products, and coatings can be specified instead where the owner prefers.

Parts of a conveyor route

What the conveyor package includes

Truss galleries

Box or open trusses carrying the stringers, idler supports and walkways between bents.

Trestle bents and towers

Braced bents at regular centers, taller towers at road and river crossings, with fixed and sliding bearings.

Walkways and access

Walkways on one or both sides, crossovers, stairs and ladders, handrails and toe plates.

Covers and hoods

Belt covers, wind screens or fully clad galleries where the owner needs dust and weather control.

Checks on every route

Design checks for a conveyor gallery

CheckWhyWhat we do
Deflection between bentsKeeps idlers aligned and the belt trackingLimits agreed with the conveyor designer and your EOR
Thermal movementLong galleries grow and shrink with the seasonsExpansion joints and sliding bearings at set intervals
Wind and snow on coversCovers and screens can double the wind on a galleryLoad cases to ASCE 7-22 for the cover you choose
Seismic drift at bentsTall bents move under earthquake loadsBracing and bearings checked for the site seismic data
Drive and take-up loadsBelt tension concentrates at the head and tailLocal frames and bracing designed for the drive data

From route to containers

How a conveyor package moves through our plant

  1. Route and loads in

    Profile, bent locations and conveyor data from your conveyor designer.

  2. Typical spans designed

    Standard gallery span and bents designed and approved first.

  3. Repeated in Tekla

    The route modeled from the approved spans and bents, specials added at drives and crossings.

  4. Fabricated in sequence

    Members galvanized, piece-marked and packed in the order the route is erected.

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Gallery, bent and walkway design to US codes for your EOR’s review
  • Repeated span and bent design with consistent piece marks
  • Hot-dip galvanizing or coating for the exposure
  • Packing by route section, tracked in PEB Studio

The US contractor, our customer, and others

  • Conveyor design, belts, idlers, pulleys and drives
  • Foundations and anchor rod setting
  • Erection, alignment and belt installation
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a mine.

Crew assembling a large steel truss on the shop floor Photo
A large truss being put together in the Vietnam fabrication hall.
Curved long-span trusses being set during erection Photo
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Conveyor galleries & trestles: questions we hear

Do you supply the conveyor equipment?

No. Belts, idlers, pulleys and drives come from the conveyor supplier. We supply the galleries, trestles, walkways and covers that carry them.

How do the galleries ship?

Gallery trusses are split into pieces that fit containers or flat racks, with bolted field splices, so they arrive ready to assemble. See the remote-site delivery guide.

Does World Steel provide shop drawings for mining steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes, the owner’s design criteria and the equipment data govern, and your Engineer of Record confirms them for each project. World Steel has no published mining project.