North Dakota · Farm buildings
Structural steel for North Dakota grain and farm buildings
North Dakota leads the country in spring wheat, durum, canola, sunflowers and several other crops, grown on large farms across the Red River Valley and the plains. Farms and elevators need machine sheds, grain and commodity buildings and shops that stand up to wind and drift. We design them to ASCE 7.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail for your North Dakota site.
- Crops
- Wheat, canola, sunflowers
- Buildings
- Sheds, grain, shops
- Loads
- Wind, drift, frost
- Coatings
- Galvanized options
Why it matters
Big farms, big machines
Modern planters and combines need very wide, tall doors and clear spans, and a machine shed stands alone on open land in blizzard country. Grain dust and moisture attack the steel.
We design the frames, purlins and door framing for the site wind and drift and choose galvanized or duplex coatings where the exposure calls for them, packed for the truck to the farm.
What we design and fabricate
Steel for farm and ranch buildings
Machine sheds
Clear spans for combines, sprayers and trucks.
Storage and processing
Buildings for grain, hay, feed and produce.
Coatings for barn air
Galvanized or duplex steel for livestock exposure.
Big doors
Framing for wide equipment doors.
Who does what
Farm steel, split clearly
World Steel supplies
- Frames, purlins and girts designed to ASCE 7
- Coating systems for livestock and wet exposure
- Door framing for equipment
- Packing for the truck to the farm
- Tekla shop and erection drawings, included
The US contractor arranges
- Site, pad and foundations
- Engineer of Record approval and PE seal where required
- Ventilation and equipment
- Doors, panels and fasteners
- Erection and site work
North Dakota
What we do not claim
Many farm buildings are exempt from local building codes, but World Steel still designs them to ASCE 7 for wind and snow unless the owner directs otherwise. Your engineer confirms what the county requires.
North Dakota ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · North Dakota contractors
North Dakota contractors: let’s win the next project together
If your next bid involves grain and farm buildings, World Steel wants to be your long-term, win-win steel partner in North Dakota. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your North Dakota project is cut, welded, inspected and packed.
Q&A
What North Dakota buyers ask
Are farm buildings exempt from codes?
Often they are. We still design them to ASCE 7 unless the owner directs otherwise.
Can you frame very wide doors?
Yes. We frame doors sized for modern equipment.
Do you supply grain bins?
No. Bins come from their suppliers; we supply the buildings.
Official sources: North Dakota Department of Agriculture
North Dakota solutions
Every North Dakota guide
Related pages
Code facts on this page summarize North Dakota practice, the North Dakota State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in North Dakota?
Send the drawings or the site address, size and use. We set the North Dakota design basis with your Engineer of Record, design or detail the steel to the North Dakota State Building Code, blizzard drift and deep cold, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail for the truck to your site.