Mining steel · The process plant

Process plant steel built around the mills, cells and cranes inside it

A concentrator is a building designed from the inside out. Grinding mills, flotation cells, thickeners, pumps and the cranes that service them set the bays, the floor levels and the loads. We design and fabricate the steel around your process layout, with the heavy members built up from plate in our own plant.

Start from the flowsheet

The process sets the frame

In a concentrator the steel serves the equipment. Mill bays need a crane that can lift a shell section or a motor and reach every liner bolt; flotation and thickening areas need open floors with heavy, wet loads; the pump and reagent areas need platforms at the levels the piping engineer draws. We take the general arrangement drawings and the equipment list first, then set out the grid, the floor levels and the crane runways.

Heavy columns and crane girders are welded from plate in our plant, where a deep built-up section saves tonnage over the nearest rolled shape. Floor framing, bracing and platforms use hot-rolled members where they are the better answer. Everything is designed to AISC 360 for the loads in your design criteria, and your Engineer of Record approves the scheme.

Mill foundations are usually separate concrete blocks isolated from the building. We detail the steel to stay clear of them, and leave the gaps, covers and access your mechanical engineer asks for.

Areas of a concentrator

What the steel does in each area

Grinding and mill bay

Tall crane bay over the mills, with runway girders, brackets and columns sized for the crane loads and the maintenance lifts.

Flotation and thickening

Open floors and platforms for cells and tanks, galvanized or coated for wet and chemical exposure.

Pump, reagent and process levels

Multi-level platforms, stairs and pipe supports at the levels set by the piping layout.

Maintenance and lay-down

Crane-served lay-down bays and monorail beams for pumps, liners and motors.

Coordinated before fabrication

What the plant steel has to work with

InterfaceWhat it needs from the steelHow we handle it
Overhead cranesRunway girders, stops and brackets within tight toleranceCrane data from your crane supplier; runway designed with AISC Design Guide 7 as a reference
Mills and crushersSteel kept clear of isolated foundationsGaps, covers and access detailed from your mechanical layout
Process piping and laundersSupports, openings and platform cut-outsPipe supports and openings modeled in Tekla with the frame
Cladding and ventilationGirts, openings and louvers in the right placesWall and roof panels and louvers made in Vietnam, when you want them
Future equipmentSpare capacity where the owner plans itAllowances stated on the calculations, as set in your criteria

Who does what

World Steel supplies the steel. Your contractor builds.

World Steel, from our plant in Vietnam

  • Frame and crane runway design to US codes for your EOR’s review
  • Tekla model coordinated with your process and piping layout
  • Shop drawings at no extra charge
  • Built-up columns and girders welded from plate in our plant

The US contractor, our customer, and others

  • Process design, equipment selection and supply
  • Mill and equipment foundations, anchor rod setting
  • Erection, crane installation and field connections
  • Drawing approval, PE seal and permit

Real photos

From World Steel’s plant and jobs

Our own shop floors and past work, shown for the kind of steel on this page. Not stock images, and not a mine.

Tall lattice columns of a crane-served industrial building during erection Photo
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related pages

Questions from US contractors

Process plant buildings: questions we hear

Can you supply the steel for a whole concentrator building?

Yes. We design and fabricate the frame, crane runways, floors, platforms, stairs and support steel of a concentrator in our plant in Vietnam, and ship it to your US port. The US contractor erects it.

Do you supply the overhead cranes?

We design and fabricate the runway steel. The cranes themselves are usually bought from a crane maker chosen by the owner or the contractor, who gives us the wheel loads and clearances.

Can you work to the owner’s engineering standards?

Yes. Mining owners often have their own structural design criteria and specifications. We design and fabricate to them, and your Engineer of Record confirms the basis for each project.

Does World Steel provide shop drawings for mining steel?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure; the US contractor and their Engineer of Record review and approve the calculations and drawings, and handle the PE seal and the permit.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes, the owner’s design criteria and the equipment data govern, and your Engineer of Record confirms them for each project. World Steel has no published mining project.

Talk to our mining steel team

Send the general arrangement drawings, the owner’s structural criteria and the area you are pricing. We return a written scope for structural steel designed to US codes, made in our plant in Vietnam and shipped to your US port.