Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Seaside industrial site with a steel warehouse at its center, wide drone shot

Seismic regions · State guides

Seismic regions of the United States, state by state

Earthquake design is not only a California question. Seattle, Salt Lake City, Anchorage, Reno, Memphis and Charleston all build to seismic rules, and many smaller towns between them do too. Here is where the hazard comes from in each region, with a state guide for every market we ship to.

Highest hazard
Pacific Coast, Alaska and parts of Hawaii
Inland belts
Intermountain West and the New Madrid zone
Your site
Values set by coordinates and soil, never by the state

Where the hazard comes from

Four kinds of earthquake country

Along the Pacific Coast, the boundary between tectonic plates runs through California as the San Andreas system and offshore of Oregon and Washington as the Cascadia subduction zone, which can produce very large, long-duration shaking. Alaska sits on the Aleutian subduction arc, and Hawaii’s volcanoes generate their own earthquakes.

Inland, the Intermountain Seismic Belt follows the Wasatch Front in Utah north into Idaho, Montana and Wyoming, while the Basin and Range stretches across Nevada. In the middle of the country the New Madrid seismic zone, where three great earthquakes struck in 1811 and 1812, still drives design across the Mississippi Valley. On the East Coast, the 1886 Charleston earthquake left South Carolina with the highest values on the Atlantic seaboard.

A state is never a single category. Design values change across a few kilometers and with the soil, so we work from the coordinates of your site.

State guides

Seismic states we ship to

Each guide covers the code edition, wind, snow and seismic conditions, the ports that serve the state and how steel reaches your site.

Southeast

Charleston, South Carolina was badly damaged in 1886, and the coastal plain soils there still drive design.

Real photos

From our plant in Vietnam

World Steel’s own shop floors and jobs, where the steel for US projects is made. Not stock images.

Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air Photo
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.

How World Steel supports this

Designed to US codes, made in our plant in Vietnam

Site-specific from day one

Seismic values taken from your coordinates and soil report, never from a regional average.

Your state’s code edition

Designed to the IBC and ASCE 7 edition your state or city enforces, with local amendments.

Shipped to your nearest port

From our plant in Vietnam to the West Coast, Gulf or East Coast port that keeps the inland leg short.

The seismic solution ecosystem

Products and solutions behind this guide

The products we make for this part of a seismic structure, the services that come with them and past World Steel projects, all one click away.

World Steel projects: US codes, Guam, Japan and beyond

Past World Steel work, shown for the structure type. It does not describe the seismic criteria of any one project.

Standards on this page

Read the standard behind it

Each standard page explains what it covers, the edition we reference and how we apply it. We design and fabricate to these standards; they are not certifications.

Keep reading

Related solutions

Questions from US buyers

Seismic regions & states: questions we hear

Which states have the highest seismic design values?

Alaska, California, Washington, Oregon, Nevada, Utah and parts of Hawaii, Idaho, Montana and Wyoming carry the highest values, with significant hazard in the New Madrid region and around Charleston.

Does California have extra rules?

Yes. The California Building Code amends the IBC, and public schools and hospitals go through state agency plan review with added requirements. We supply the steel structure to each project’s requirements; erection is the scope of the US contractor, our customer.

I am building in Tennessee. Do I really need seismic design?

Possibly. West Tennessee lies near the New Madrid zone and many sites there fall in higher categories. The category depends on your exact site and soil.

Does World Steel provide shop drawings for seismic work?

Yes. Shop drawings come with every project at no extra charge. We design and fabricate the steel structure, and your Engineer of Record reviews and approves the calculations and drawings.

A plain-English summary for US buyers, not the code text and not engineering advice for a specific site. The adopted codes and standards govern, and your Engineer of Record confirms the criteria for each project.

Talk to a seismic engineer

Send the site address, the soil report if you have one, and what the building is for. We confirm the seismic criteria with your Engineer of Record and return a written scope for steel designed to US codes and made in our plant in Vietnam.