Virginia · Data Center Alley
Data center structural steel for Data Center Alley
Loudoun County, Prince William County and their neighbors hold the largest concentration of data centers anywhere. Campuses are built in phases, each hall needs a large, repeatable steel frame, and the roof and yard carry heavy cooling and electrical equipment. Speed and repeatability decide who wins the next building.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Virginia site through the Port of Virginia.
Going up beside the plant in Vietnam: World Steel framed its own office building.
- Market
- Loudoun and Prince William
- Typical build
- Phased multi-hall campuses
- Steel drivers
- Roof plant and floor loads
- Our part
- Repeatable hall packages
Why it matters
One design, many halls
Most Northern Virginia campuses repeat the same hall again and again, with the second and third building following months after the first. A steel package that is detailed once and released building by building lets the contractor keep the same crews and the same sequence on every hall.
Data halls carry heavy loads that ordinary warehouses do not: cooling units and dunnage on the roof, cable trays and busway hung from the structure, generators and switchgear in the yard. We design these loads into the frame with your Engineer of Record from the start.
What we design and fabricate
Steel for data center campuses
Data hall frames
Long spans with repeatable bays and clear heights.
Roof equipment steel
Dunnage and platforms for cooling units.
Hung services
Framing for cable trays, busway and piping.
Office and support floors
Composite floors for admin and electrical rooms.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall frames, roof steel and equipment platforms
- Phased release by building and by area
- Anchor bolt layouts and foundation reactions
- Coatings to the owner’s specification
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and PE seal
- The county permit and inspections
- Foundations, slabs and erection
- Mechanical and electrical installation
- Owner coordination on the campus schedule
What we do not claim
We name no data center owner as a customer and claim no completed Virginia campus. We fabricate the structural steel to your drawings or our design, and your Engineer of Record approves it.
Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Virginia contractors
Virginia contractors: let’s win the next project together
If your next bid involves Data Center Alley, World Steel wants to be your long-term, win-win steel partner in Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Virginia project is cut, welded, inspected and packed.
Q&A
What Virginia buyers ask
Can you repeat the same package for several halls?
Yes. Once a hall is detailed, the next ones are released from the same model with changes tracked, so each building follows the same erection sequence.
Do you design the roof equipment steel?
We design or detail dunnage, platforms and supports from the equipment loads your engineers give us, and your Engineer of Record approves them.
Can you follow the owner’s steel specification?
Yes. Owner specifications for coatings, connections and inspection are written into the shop drawings and the ITP agreed for the project.
Official sources: Loudoun County Economic Development
Virginia solutions
Every Virginia guide
Related pages
Code facts on this page summarize Virginia practice, the Virginia Uniform Statewide Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.
Building in Virginia?
Send the drawings or the site address, size and use. We set the Virginia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.