States and territories
Pick your state for its hazards, code basis and ports
- 51 state guidesall 50 states and Washington, D.C.
- 16 gateway portsWest Coast, Hawaii, Gulf and East Coast
- Jobs up to 5,000 tSunpro Steel Factory, 2024
Pick your state
- Alaska
- Maine
- Wisconsin
- Vermont
- New Hampshire
- Washington
- Idaho
- Montana
- North Dakota
- Minnesota
- Illinois
- Michigan
- New York
- Massachusetts
- Oregon
- Nevada
- Wyoming
- South Dakota
- Iowa
- Indiana
- Ohio
- Pennsylvania
- New Jersey
- Connecticut
- Rhode Island
- California
- Utah
- Colorado
- Nebraska
- Missouri
- Kentucky
- West Virginia
- Virginia
- Maryland
- Delaware
- Arizona
- New Mexico
- Kansas
- Arkansas
- Tennessee
- North Carolina
- South Carolina
- District of Columbia
- Oklahoma
- Louisiana
- Mississippi
- Alabama
- Georgia
- Hawaii
- Texas
- Florida
Site hazards by region
What drives the steel in each part of the country
The same plant and the same engineering method serve every state. What changes is the hazard that governs the frame. Pick a hazard to see where it leads the design, what it changes in the steel and where to read more.
- Alaska
- Maine
- Wisconsin
- Vermont
- New Hampshire
- Washington
- Idaho
- Montana
- North Dakota
- Minnesota
- Illinois
- Michigan
- New York
- Massachusetts
- Oregon
- Nevada
- Wyoming
- South Dakota
- Iowa
- Indiana
- Ohio
- Pennsylvania
- New Jersey
- Connecticut
- Rhode Island
- California
- Utah
- Colorado
- Nebraska
- Missouri
- Kentucky
- West Virginia
- Virginia
- Maryland
- Delaware
- Arizona
- New Mexico
- Kansas
- Arkansas
- Tennessee
- North Carolina
- South Carolina
- District of Columbia
- Oklahoma
- Louisiana
- Mississippi
- Alabama
- Georgia
- Hawaii
- Texas
- Florida
Hazard often leads the design Usually not the governing case Orientation only: loads always come from your site address.
Pacific coast, Alaska, Hawaii, the Intermountain West, the New Madrid zone and Charleston
Earthquake ground motion
Where the Seismic Design Category is D or higher, the lateral system, not gravity, usually sets the size of columns, braces and connections. Special moment and braced frames follow AISC 341 detailing, and their demand-critical welds follow AWS D1.8.
What it changes in the steel
- Braced bays and moment frames sized for the site class and SDC
- AISC 341 detailing and AWS D1.8 seismic welding where the system requires it
- Anchor rods and base plates checked for uplift and shear
States where it often leads
State guides · all 50 states and Washington, D.C.
Choose the state where you are building
Each guide covers the code basis we design to, the hazards that drive the frame, the industries we serve there and the gateway ports that bring the steel from our plant in Vietnam to your site.
West Pacific coast, Mountain West, Alaska and Hawaii
Midwest Great Lakes and the Plains
South Gulf, Atlantic South and Appalachia
Northeast New England and the Mid-Atlantic
Hazard icons: SeismicHurricaneSnowTornado & hailHeat & wildfireSalt air
What we supply in every state
Structural steel packages, not only metal buildings
Pre-engineered buildings are one of the systems we fabricate. Large contractors send us the whole structural steel package of a job, and it ships to any state from the same plant, model and quality system.
Largest jobs
Packages already delivered from our plant
Whatever state your project is in, it runs through the plant that designed, detailed, fabricated and shipped these jobs.
-
5,000 t
Sunpro Steel Factory
about 5,500 short tons
Steel industryCan Tho City, Vietnam · 2024
-
2,500 t
CPV Food Processing Factory
about 2,750 short tons
Food processingDong Nai Province, Vietnam · 2020
-
2,000 t
Long Son petrochemical complex
about 2,200 short tons
Oil and gasBa Ria–Vung Tau, Vietnam · 2022
-
2,000 t
M&D (MD Factory)
about 2,200 short tons
Warehouse and industrialThailand · 2024
-
1,500 t
Tongwei Tien Giang feed factory, phase 1
about 1,650 short tons
Animal feedDong Thap Province, Vietnam · 2018
-
1,000 t
New Era cold storage
about 1,100 short tons
Cold storage, phase 1 tonnageTay Ninh Province, Vietnam
From our plant to your state
Shipped to the gateway port nearest your site
Steel leaves southern Vietnam packed by erection sequence and lands at the US port that gives your site the shortest inland leg. Each port page shows the terminals, the states it serves and the site conditions nearby.
West Coast and Hawaii
Shortest ocean leg from Vietnam; serves the West, the Southwest, the Rockies and the islands.
Gulf Coast
Texas, Louisiana, Alabama and the interior South and Midwest.
East Coast
The Atlantic seaboard, the Southeast and the Ohio Valley.
Model the route to your site
Pick a gateway port and a destination: the shipping simulator draws the sea lane from Vietnam and the road leg to your state.
World Steel, in every state
We design, fabricate and ship the steel
- Design calculations to the code basis of your state
- Shop and erection drawings, included at no extra cost
- Fabrication in our own IAS AC472 plant in Vietnam
- Coating, tagging and packing by erection sequence
- Ocean shipping to the US gateway port you choose
- Live production tracking in PEB Studio
The US contractor, our customer
You approve, permit and erect it
- Review and approval of the drawings by your Engineer of Record
- PE seal, permit and building department submittals
- Foundations, anchor rod setting and site work
- Customs clearance, inland trucking and receiving
- Erection of the steel by your crew or erector
- Special inspection as the building official requires
For US contractors
Become our partner in the US
General, design-build and EPC contractors who bid steel work across several states team up with one fabricator for every job: one design method, one plant, one tracking system and shop drawings included.
FAQ
Questions contractors ask about building in their state
Does World Steel only supply metal buildings?
No. Pre-engineered building systems are one of the systems we fabricate. Most large jobs are structural steel packages: heavy industrial frames, multi-story framing, built-up girders and columns, platforms and equipment supports, fabricated at 2,500 metric tons a month in our own plant in Vietnam.
Can you supply structural steel in every US state?
Yes. We supply projects in all 50 states and Washington, D.C. Each state guide shows the code basis we design to, the site hazards that usually govern and the gateway ports that serve it. The design loads always come from your exact site address.
Which building code do you design to in my state?
The code edition your jurisdiction enforces: most states adopt the International Building Code with local amendments, and some leave adoption to cities and counties. The edition, together with ASCE 7, AISC 360 and AISC 341 where it applies, is stated on every proposal and confirmed with your Engineer of Record.
Who stamps the drawings and pulls the permit?
Your Engineer of Record and your team. World Steel designs and fabricates the steel and delivers calculations and drawings ready for your Engineer of Record to review and approve. The PE seal, the permit and the building department submittals stay with the US contractor, our customer.
Does World Steel erect the steel?
No. World Steel supplies the steel structure. The US contractor, our customer, erects it with its own crew or erector. Our engineers answer questions from the field by phone and video while the frame goes up.
How does the steel get to my site?
Containers and breakbulk loads leave southern Vietnam for the US gateway port nearest your site, such as Los Angeles, Houston, Savannah or New York and New Jersey. Members are tagged and packed by erection sequence. You can model the route in our shipping simulator.
How large a job can you take?
Our plant fabricates 2,500 metric tons of structural steel a month, about 2,750 short tons. Our largest delivered job is the Sunpro Steel factory at 5,000 metric tons, and the Long Son petrochemical complex covered more than 56,000 m² with about 2,000 metric tons of steel.
How do I follow production from the US?
In PEB Studio. Your project team sees each piece move from cutting to welding, coating and packing, with inspection records attached, and can witness hold points live on video or send a third-party inspector to the plant.
Have a site address and a steel package?
Send the state, the drawings or the tonnage and the bid date. Our engineers confirm the code basis and site loads with your Engineer of Record and the production slot we can hold for the job.