Hurricane wind
Pressure grows with the square of wind speed, so a few metres a second more wind means a lot more load. Roof corners, edges, doors and anchor bolts take it first.
Large-project capacity
Island projects are rarely small any more: resort phases, port warehouses, power and water plants, hospitals and whole rebuild programs after a storm. Our plant fabricates 2,500 metric tons (about 2,750 US tons) of structural steel a month, so a large Caribbean package runs beside our other work, with every piece coated, tracked and packed for the voyage.
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year.
Shot blasting and multi-coat systems from Jotun, PPG, Carboline, Hempel, Nippon Paint and International Paint, with film thickness recorded.
Every member followed in PEB Studio from cutting to coating to container.
Largest single jobs, metric tons
Plant output 2,500 t (about 2,750 US tons) a month. In the Caribbean we have already supplied 18 footbridges, two warehouses and a mosque for Guyana. How large jobs run
Three hazards, one island
Pressure grows with the square of wind speed, so a few metres a second more wind means a lot more load. Roof corners, edges, doors and anchor bolts take it first.
On the shore, bare carbon steel can lose 80 to 200 µm a year and more in the surf zone. The coating system and the details decide how long the steel lives.
From Jamaica and Hispaniola to Puerto Rico, the Leeward and Windward arc and Trinidad, many islands sit on active plate boundaries. Frames are checked for both.
Island board
A broad public picture for early planning, not design values. Your engineer of record sets the wind speed, exposure, corrosivity and seismic values for the actual site.
Wind Salt Quake Bars: 1 present, 2 often important, 3 often governs
Eight guides
Who does what
Caribbean contractors · Win-win
You know the island, the authority, the crews and the client. We bring a plant that turns out 2,500 t a month, engineers who design for hurricanes and salt air every day and drawings at no extra cost. Bid the larger jobs together and keep the erection, the client and the margin on the island.
Partner with World SteelIn our plant in Vietnam
Real World Steel photos: blasting line, primed columns, paint hall, galvanized frames, built-up members and packed bundles. None is shown as a Caribbean site.
Questions
Yes. We design and fabricate steel buildings and structures for the hurricane wind, exposure and uplift your engineer of record sets for the site, and coat them for the salt air of the coast. We have already supplied 18 steel pedestrian bridges, two warehouses and a mosque for Guyana.
Our plant fabricates about 2,500 metric tons (2,750 US tons) of structural steel a month, and our largest single jobs reach 5,000 t. A resort phase, a port warehouse, a power plant or a program of rebuilt schools and shelters fits beside our other work.
The code the authority and your engineer of record name for the island: a national building code, the OECS Building Code, the older CUBiC or the International Building Code with ASCE 7 loads. The hurricane wind design guide shows how they relate.
No. Hurricane categories describe storms, not buildings. We design the structure for the wind speed and exposure the code sets for the site, and the calculations state every value used so your engineer can check them.
It depends on the distance from the surf and how sheltered each part of the steel is. On the shore the corrosivity is usually C5 and in the spray zone it can reach CX, which calls for a zinc-rich epoxy, epoxy and polyurethane system or galvanizing plus paint. The salt-air guide compares them.
Galvanizing is arranged by World Steel with a galvanizer named for the project, and the galvanized steel is then detailed, checked and packed with the rest of the package. Painting and blasting are done in our own plant.
No. World Steel supplies the steel structure. Erection, cladding installation and site work are the scope of the contractor, our customer. We supply erection drawings, match-marked pieces and touch-up paint.
The contractor and its engineer of record. We deliver calculations and drawings ready for their review and approval; the seal and the building permit are theirs.
Send the drawings or the island, site and use. We set the wind, seismic and corrosivity basis with your engineer of record, design and coat the steel for it and quote it made in our plant in Vietnam and shipped to your port.