- Location
- Tay Ninh Province, Vietnam
- Building type
- Cold storage warehouse
- Year
- 2024
Project overview
About New Era Cold Storage (Phase 2)
New Era Cold Storage (Phase 2) in Tay Ninh Province, Vietnam, is a cold storage warehouse completed in 2024 with steel by World Steel. As a second phase it extends an existing facility, and cold stores in general add their own structural demands: insulated panel systems, refrigeration equipment on or under the roof, and careful detailing where steel passes through the thermal envelope.
US cold chain developers, food distributors and 3PLs can use the project as a cold storage reference with a phased element. We coordinate the frame layout with your insulated panel supplier and refrigeration engineer, design to IBC 2024 and ASCE 7-22 or your Engineer of Record’s basis, and keep expansion options open where you plan another phase. Send your temperature zones and racking plan.
Cold storage frames carry insulated panels and refrigeration equipment, and the steel must stay outside or above the cold envelope to avoid condensation and thermal bridges. Phase 1 for New Era took about 1,000 tonnes, and this second phase continued the work for the same owner.
Gallery
New Era Cold Storage (Phase 2) images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
New Era Cold Storage (Phase 2) by the numbers
In the portfolio
New Era Cold Storage (Phase 2) is one of 1 cold storage warehouses in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied New Era Cold Storage (Phase 2) in 2024, together with 16 other projects shown here from that year.
Design points
What a cold storage warehouse needs from its steel
General points for every cold storage warehouse, not specific to this one.
A sealed thermal envelope
Insulated metal panels, taped joints and a continuous vapor retarder hold the set temperature and keep moisture out of the wall and roof.
Learn more →Refrigeration loads
Evaporators hang from the roof framing and condensers often sit on top, so their weights and locations are fixed before the frame is analyzed.
Learn more →Cleanable and protected
Food-grade interiors need washable surfaces, and any steel exposed to cold, damp air is coated for that exposure.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Cold storage warehouse. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Tay Ninh Province, Vietnam · 2019
Nam Long Warehouse
Warehouse
Hoc Mon District, Vietnam · 2019
Pacific Warehouse
Warehouse
Ho Chi Minh City, Vietnam · 2019
Cat Lai Warehouse
Warehouse
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a cold storage warehouse in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.