Kentucky · Code and plan review
Structural steel, the Kentucky Building Code and state plan review
Kentucky adopts one building code for the whole state: the Kentucky Building Code, based on the IBC with Kentucky amendments. The Department of Housing, Buildings and Construction reviews the plans of many commercial and industrial buildings, and some local jurisdictions review under their own programs. Complete, clear steel documents make that review faster.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by port, rail and truck to your Kentucky site.
- Code
- Kentucky Building Code
- Based on
- IBC with Kentucky amendments
- Reviewed by
- State or qualified local
- Our part
- Documents ready for review
Why it matters
One code, a known reviewer
Because the code is statewide, the design basis for a rickhouse in Bardstown and a plant in Bowling Green starts from the same document. The difference is who reviews it: the state for many projects, or a local program where one is in place.
We prepare the steel calculations and drawings in a clear order with the code edition, the loads and the design criteria on the first sheet, so your Engineer of Record can submit them without rework.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code edition | The Kentucky Building Code edition in force at submittal |
| Occupancy | Use and storage loads, including barrel or rack storage |
| Seismic | Site class and seismic design category, higher in the west |
| Wind, snow and ice | ASCE 7 values for the site, exposure and risk category |
| Steel | AISC 360 design, connection types and coating system |
Who does what
Code and plan review, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings organized for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The plan review submittal by the design professional
- Engineer of Record approval and PE seal
- Building permit and inspections
- Foundations and erection
- Fees and filing
Kentucky
What we do not claim
World Steel holds no Kentucky approval and no Kentucky engineering license, and does not submit plans. Your Engineer of Record seals and submits the design.
Kentucky ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Kentucky contractors
Kentucky contractors: let’s win the next project together
If your next bid involves code and plan review, World Steel wants to be your long-term, win-win steel partner in Kentucky. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Kentucky project is cut, welded, inspected and packed.
Q&A
What Kentucky buyers ask
Is the Kentucky Building Code statewide?
Yes. It is adopted by the state and applies across Kentucky, with enforcement by the state or by qualified local programs.
Who submits plans for review?
The design professional of record. We provide the steel calculations and drawings for the submittal.
Can you answer reviewer comments?
Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.
Official sources: Kentucky Department of Housing, Buildings and Construction
Kentucky solutions
Every Kentucky guide
Related pages
Code facts on this page summarize Kentucky practice, the Kentucky Building Code, state plan review, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the reviewing authority confirm the code and edition in force for your project.
Building in Kentucky?
Send the drawings or the site address, size and use. We set the Kentucky design basis with your Engineer of Record, design or detail the steel ready for plan review and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.