Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Primary structural system

The frame that carries every load to your foundation

Columns, rafters and tapered frames made from plate and rolled shapes in our IAS AC472-accredited plant in Vietnam. We fabricate 2,500 t of structural steel a month, so the main frame of a large US job is one order, one load path and one set of calculations.

ROOF LOAD RAFTERKNEE COLUMNANCHOR RODS

Diagram, not to scale. Your site loads set the real member sizes.

2,500 tfabricated per month
5,000 tSunpro Steel, largest job
2,000 tLong Son petrochemical
Since 2019IAS AC472 accredited

Follow the load

One load path, checked link by link

Every load on the building takes the same road to the ground. We design each stop for the same controlling load case, so no single link is the weak one.

  1. Roof and wall panels

    Wind, snow and dead load enter here.

  2. Purlins and girts

    Collect panel loads bay by bay.

  3. Rafters

    Carry the roof across the span.

  4. Knee connection

    Turns roof load into the column.

  5. Columns

    Take load and sway down to the base.

  6. Base plate and anchor rods

    Hand the reactions to the concrete.

Built-up steel girders on the shop floor at the World Steel plant in Vietnam

How we engineer the frame for US codes

Structural load path

Load moves from panels into purlins and girts, then into the frames, across bracing and connections, and finally down the columns into anchor rods and concrete. Each step is checked for the same controlling load combination, so no single link is the weak one.

Wind resistance

Frames are sized for ASCE 7-22 wind loads at your site: basic wind speed, exposure category, internal pressure from large doors, and the uplift that can reverse stresses on the roof. In much of the country wind or snow, not gravity alone, decides the frame size.

Seismic design

Your Engineer of Record assigns the Seismic Design Category from the site soil and mapped ground motion. On the West Coast, in the Intermountain region or near the New Madrid zone, frames may need AISC 341 detailing for the chosen seismic force-resisting system.

Frame spacing

Wider bays mean fewer, heavier frames and deeper purlins; narrower bays mean the opposite. The lightest combination is found project by project and is one of the most effective Value Engineering choices.

Clear span

Tapered built-up frames give column-free floors for warehouses, hangars and arenas. How far a frame can span depends on loads, roof pitch, eave height and deflection limits, and is settled in design, not promised in advance.

Material grades

Plate and shapes are ordered to the grades the design calls for, typically referenced to ASTM specifications such as A572 and A992. Mill certificates (EN 10204 3.1) and grade equivalence are presented in the submittals.

Connection design

Frame members join with bolted end-plate connections, so your erector does no structural field welding.

Fabrication requirements

Web-to-flange welds on built-up members are made on automated submerged arc lines, and all other welds follow qualified procedures. Inspections follow the project Inspection and Test Plan.

Corrosion protection

Blast cleaning and coating are selected for the site exposure. See System 09 and the coastal corrosion protection guide.

Sheet of frame types

Six frame layouts, one design team

Pick the layout that fits the use. We size it to your site loads and draw it with the secondary framing and connections.

Clear span

Tapered built-up frames with no interior columns for warehouses, hangars and arenas.

Multi-span

Interior columns split a very wide building into lighter frames.

Single slope

One roof plane draining to the back, often for retail and office fronts.

Lean-to

A lower frame hung off the main frame for loading or storage.

Crane-ready

Stepped or bracketed columns carry a runway for an overhead crane.

With mezzanine

A floor level framed into the main columns or standing on its own.

Want the whole building priced? See pre-engineered metal buildings and built-up steel columns.

In our plant in Vietnam

From steel plate to a bolted frame

Plate is cut, fitted and welded into columns and rafters on our own lines, then blasted, coated and checked. Tap a photo to open it full size.

Submerged arc welding station joining web and flange plates Photo
Welder working on a long built-up beam on the fabrication line Photo
Red primed frame sections stacked in the World Steel shop Photo
Interior of a long-span steel building framed by World Steel Photo

In the catalog

Primary frame items in the catalog

Finished steel building in blue wall panels with a walk-in door Photo

Pre-Engineered Metal Buildings

A full metal building engineered to your US site loads and cut, welded and coated in our Vietnam plant: clear span, multi-span, single-slope, lean-to, crane-ready or mezzanine layouts. Made by World Steel in Vietnam Verified
Long factory building framed with red tapered portal frames and roof purlins Photo

Rigid Frame Systems

Main frames built from welded I-sections that taper to follow the bending forces, joined at the knee and ridge with field-bolted end plates. Made by World Steel in Vietnam Verified
Welder looking over the stiffeners and end plate of a heavy column Photo

Built-Up Steel Columns

Columns welded up from flat plate to the exact web and flange sizes your design calls for, instead of the nearest rolled shape. Made by World Steel in Vietnam Verified
Welder beside a deep built-up girder running through the automatic line Photo

Built-Up Steel Rafters

Rafters welded from plate, straight-tapered or curved, so roof beams carry steel only where the bending moment needs it. Made by World Steel in Vietnam Verified
Members in gray finish paint laid out in the paint hall Photo

Tapered Frames

Variable-depth I-section columns and rafters, deep at the haunch and slim at the base and ridge, forming the main frames of a metal building. Made by World Steel in Vietnam Verified
Fabricated members lined up along a railed walkway Photo

Hot-Rolled Structural Members

Wide-flange beams, columns and channels bought from steel mills in Vietnam, then cut to length, drilled, welded and coated in our shop. Made by World Steel in Vietnam Verified
Crew assembling a large steel truss on the shop floor Photo

Steel Trusses

Shop-built steel trusses for long roof spans and floors, assembled from shapes or tubes into panels sized for shipping. Made by World Steel in Vietnam Verified
Tall columns and rafters inside a clear-span building with roof sheeting on Photo

Long-Span Steel Structures

Column-free roofs and frames for distribution centers, aircraft hangars, arenas and other buildings that need open floor area. Made by World Steel in Vietnam Verified
Red multi-story process tower frame next to a feed mill Photo

Multi-Storey Steel Framing

Beam-and-column steel frames for multi-story offices, hotels, schools and mixed-use projects, detailed for your lateral system. Made by World Steel in Vietnam Verified
Tall lattice columns of a crane-served industrial building during erection Photo

Crane Supporting Structures

Building frames laid out around an overhead crane, with runway girders and column brackets or stepped columns built in. Made by World Steel in Vietnam Verified
Portal frames and roof purlins silhouetted against the sky Photo

Portal Frames

Simple column-and-rafter frames for shops, stores and light industrial buildings where a straightforward, repeatable bay suits the plan. Made by World Steel in Vietnam Verified
X-braced red truss assembly on the fabrication floor Photo

Special Structural Assemblies

One-off fabricated steel such as plate girders, equipment frames, modular skids and heavy plant structures, built to your drawings. Made by World Steel in Vietnam Verified

Where it meets the other systems

Secondary Framing

Each purlin and girt bolts to a clip that was welded onto the rafter or column in our shop, and flange braces run from those members to the inside flange of the frame.

Design limit: The frame analysis assumes braces at set points, so clip and brace locations on the drawings must match it exactly. · What gets checked: Confirm every bolt is in and snug and that no flange brace has been left off.

Doors & Building Openings

Jambs and headers around each door and window take its wind reactions and pass them into the main frames.

Design limit: The frames cannot be finalized until the door supplier gives design pressures and reactions for each opening. · What gets checked: Measure clear opening sizes and check that jambs are plumb.

Mezzanines & Floor Systems

A mezzanine either connects to the building columns or stands on its own posts.

Design limit: Connecting to the main frame adds load and can change how the frame is braced, so the choice is made early in design. · What gets checked: Check mezzanine bolts for tightness; decking attachment is checked against the deck maker’s pattern.

Connections & Anchorage

Column base plates sit on anchor rods that carry the column reactions into the concrete.

Design limit: Rod positions and projection above the concrete must agree with the foundation drawings to the tolerance shown. · What gets checked: Survey rod locations and elevations before steel arrives, then grout under the base plates.

Corrosion Protection

Main frame members receive their blast cleaning and coating system in our plant.

Design limit: The system suits the site’s corrosivity, and any slip-critical faying surfaces get a coating qualified for that slip class or are masked. · What gets checked: Film thickness and adhesion are measured and logged in the Manufacturing Data Record.

Ventilation & Building Services Support

Support steel for equipment bolts to the frames or picks up on the purlins.

Design limit: Unit weights and positions have to be known before the frame design is closed out. · What gets checked: Check the support connections against the shop drawings.

Crane Runway & Industrial Supports

Runway brackets and stepped crane columns are designed as part of the main frames.

Design limit: The crane maker must supply wheel loads, impact allowances and duty cycle before the frames are designed. · What gets checked: Runway position and level checked against the tolerance table.

Special Building Accessories

Canopies and other exterior attachments bolt back to the main frames.

Design limit: Canopies pick up strong uplift and snow drift, so they are designed together with the frame they hang from. · What gets checked: Connection check against the drawings.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Frame design calculations to the codes your Engineer of Record names, typically AISC 360 with ASCE 7-22 loads
  • Shop drawings, anchor rod setting plan and column reactions, included at no extra cost
  • Columns, rafters, tapered frames and bracing made from plate and rolled shapes in our plant
  • Coating, mill certificates and inspection records, then packing in erection order for your US port

The US contractor, our customer

  • Drawing review and approval, the PE seal and the building permit, with your Engineer of Record
  • Foundations, casting the anchor rods and checking them against the setting plan
  • Unloading, steel erection and bolting at site
  • Special inspection at site where the building department requires it

Questions from US contractors

Primary frame questions and answers

8 answers, grouped by topic.

Design and codes 3 answers

Which codes is the primary frame designed to?

Frames are designed to the codes your Engineer of Record names for the project, usually the locally adopted IBC with ASCE 7-22 loads and member design to AISC 360. Where the seismic force-resisting system needs it, members and connections are detailed to AISC 341.

Who stamps the frame drawings in the US?

World Steel designs and fabricates the steel. Drawing approval, the PE seal and the permit are handled by the US contractor with their Engineer of Record. We send the calculations and drawings ready for that review.

How wide can a clear-span frame go?

It depends on the loads, roof pitch, eave height and deflection limits at your site, so the span is settled in design rather than promised in advance. Send the footprint and the site address and we will show the frame options.

Fabrication and quality 3 answers

How are built-up columns and rafters welded?

Web-to-flange welds are made on automated submerged arc lines, and every other weld follows a qualified procedure. Inspections follow the project Inspection and Test Plan and are recorded for your submittal.

Can you supply mill certificates for the steel?

Yes. Plate and shapes come with EN 10204 3.1 mill certificates, and Charpy impact values can be requested from the Vietnam plate mills where the design calls for them.

Is any welding needed at site?

No structural field welding is needed on the frame. Frame pieces join with bolted end-plate connections, so your erector bolts the frame together.

Large projects 2 answers

How much primary steel can you produce for one job?

The plant fabricates 2,500 metric tons of structural steel a month. Our largest published job is about 5,000 t for the Sunpro Steel factory, and several jobs of 2,000 t or more have shipped from the same shop.

Can a large frame package ship in phases?

Yes. Production and packing follow the erection sequence you give us, so the first bays can arrive first. Your production slot and ship dates are confirmed in the quote.

Keep reading

Related pages

Price it or partner with us

Send the footprint. We will frame it.

Share the building size, use and site address. We design the primary frame to your loads and send calculations and drawings for your Engineer of Record to review.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details