Clear span
Tapered built-up frames with no interior columns for warehouses, hangars and arenas.
Follow the load
Every load on the building takes the same road to the ground. We design each stop for the same controlling load case, so no single link is the weak one.
Roof and wall panels
Wind, snow and dead load enter here.
Purlins and girts
Collect panel loads bay by bay.
Rafters
Carry the roof across the span.
Knee connection
Turns roof load into the column.
Columns
Take load and sway down to the base.
Base plate and anchor rods
Hand the reactions to the concrete.
Load moves from panels into purlins and girts, then into the frames, across bracing and connections, and finally down the columns into anchor rods and concrete. Each step is checked for the same controlling load combination, so no single link is the weak one.
Frames are sized for ASCE 7-22 wind loads at your site: basic wind speed, exposure category, internal pressure from large doors, and the uplift that can reverse stresses on the roof. In much of the country wind or snow, not gravity alone, decides the frame size.
Your Engineer of Record assigns the Seismic Design Category from the site soil and mapped ground motion. On the West Coast, in the Intermountain region or near the New Madrid zone, frames may need AISC 341 detailing for the chosen seismic force-resisting system.
Wider bays mean fewer, heavier frames and deeper purlins; narrower bays mean the opposite. The lightest combination is found project by project and is one of the most effective Value Engineering choices.
Tapered built-up frames give column-free floors for warehouses, hangars and arenas. How far a frame can span depends on loads, roof pitch, eave height and deflection limits, and is settled in design, not promised in advance.
Plate and shapes are ordered to the grades the design calls for, typically referenced to ASTM specifications such as A572 and A992. Mill certificates (EN 10204 3.1) and grade equivalence are presented in the submittals.
Frame members join with bolted end-plate connections, so your erector does no structural field welding.
Web-to-flange welds on built-up members are made on automated submerged arc lines, and all other welds follow qualified procedures. Inspections follow the project Inspection and Test Plan.
Blast cleaning and coating are selected for the site exposure. See System 09 and the coastal corrosion protection guide.
Sheet of frame types
Pick the layout that fits the use. We size it to your site loads and draw it with the secondary framing and connections.
Tapered built-up frames with no interior columns for warehouses, hangars and arenas.
Interior columns split a very wide building into lighter frames.
One roof plane draining to the back, often for retail and office fronts.
A lower frame hung off the main frame for loading or storage.
Stepped or bracketed columns carry a runway for an overhead crane.
A floor level framed into the main columns or standing on its own.
Want the whole building priced? See pre-engineered metal buildings and built-up steel columns.
In our plant in Vietnam
Plate is cut, fitted and welded into columns and rafters on our own lines, then blasted, coated and checked. Tap a photo to open it full size.
Photo
Photo
Photo
Photo
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
In the catalog
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Photo
Each purlin and girt bolts to a clip that was welded onto the rafter or column in our shop, and flange braces run from those members to the inside flange of the frame.
Design limit: The frame analysis assumes braces at set points, so clip and brace locations on the drawings must match it exactly. · What gets checked: Confirm every bolt is in and snug and that no flange brace has been left off.
Jambs and headers around each door and window take its wind reactions and pass them into the main frames.
Design limit: The frames cannot be finalized until the door supplier gives design pressures and reactions for each opening. · What gets checked: Measure clear opening sizes and check that jambs are plumb.
A mezzanine either connects to the building columns or stands on its own posts.
Design limit: Connecting to the main frame adds load and can change how the frame is braced, so the choice is made early in design. · What gets checked: Check mezzanine bolts for tightness; decking attachment is checked against the deck maker’s pattern.
Column base plates sit on anchor rods that carry the column reactions into the concrete.
Design limit: Rod positions and projection above the concrete must agree with the foundation drawings to the tolerance shown. · What gets checked: Survey rod locations and elevations before steel arrives, then grout under the base plates.
Main frame members receive their blast cleaning and coating system in our plant.
Design limit: The system suits the site’s corrosivity, and any slip-critical faying surfaces get a coating qualified for that slip class or are masked. · What gets checked: Film thickness and adhesion are measured and logged in the Manufacturing Data Record.
Support steel for equipment bolts to the frames or picks up on the purlins.
Design limit: Unit weights and positions have to be known before the frame design is closed out. · What gets checked: Check the support connections against the shop drawings.
Runway brackets and stepped crane columns are designed as part of the main frames.
Design limit: The crane maker must supply wheel loads, impact allowances and duty cycle before the frames are designed. · What gets checked: Runway position and level checked against the tolerance table.
Canopies and other exterior attachments bolt back to the main frames.
Design limit: Canopies pick up strong uplift and snow drift, so they are designed together with the frame they hang from. · What gets checked: Connection check against the drawings.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
8 answers, grouped by topic.
Frames are designed to the codes your Engineer of Record names for the project, usually the locally adopted IBC with ASCE 7-22 loads and member design to AISC 360. Where the seismic force-resisting system needs it, members and connections are detailed to AISC 341.
World Steel designs and fabricates the steel. Drawing approval, the PE seal and the permit are handled by the US contractor with their Engineer of Record. We send the calculations and drawings ready for that review.
It depends on the loads, roof pitch, eave height and deflection limits at your site, so the span is settled in design rather than promised in advance. Send the footprint and the site address and we will show the frame options.
Web-to-flange welds are made on automated submerged arc lines, and every other weld follows a qualified procedure. Inspections follow the project Inspection and Test Plan and are recorded for your submittal.
Yes. Plate and shapes come with EN 10204 3.1 mill certificates, and Charpy impact values can be requested from the Vietnam plate mills where the design calls for them.
No structural field welding is needed on the frame. Frame pieces join with bolted end-plate connections, so your erector bolts the frame together.
The plant fabricates 2,500 metric tons of structural steel a month. Our largest published job is about 5,000 t for the Sunpro Steel factory, and several jobs of 2,000 t or more have shipped from the same shop.
Yes. Production and packing follow the erection sequence you give us, so the first bays can arrive first. Your production slot and ship dates are confirmed in the quote.
Keep reading
Price it or partner with us
Share the building size, use and site address. We design the primary frame to your loads and send calculations and drawings for your Engineer of Record to review.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024
Short project form
Have this system engineered for your site
Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.