Utah · Data centers
Structural steel for Utah data center campuses
Utah has become a major data center market, with large campuses west of Utah Lake, in Lehi and West Jordan and across the Salt Lake Valley. Halls repeat building after building, roofs carry heavy cooling plant and snow, and most sites sit in high Seismic Design Categories along the Wasatch Front.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Los Angeles–Long Beach or Oakland for your Utah site.
- Clusters
- Utah County, Salt Lake Valley
- Halls
- Repeat bays
- Roof
- Cooling plant and snow
- Seismic
- Often category D
Why it matters
Repeat halls on a fault
A data center campus is built hall after hall from the same grid. In Utah the steel has to carry heavy roof plant and snow, brace the halls for high seismic loads, and arrive in phases that match the owner’s schedule.
We model the repeat hall once, release it phase by phase, and track every member in PEB Studio so your team sees the next hall coming before it ships.
What we design and fabricate
Steel for data halls
Hall frames
Repeat bays sized for roof plant, snow and cable loads.
Roof plant steel
Platforms and dunnage for cooling equipment.
Cable supports
Tray and cable support steel through the halls.
Seismic bracing
Braced frames detailed for high seismic categories.
Who does what
Data center steel, split clearly
World Steel supplies
- Hall frames, roof plant steel and cable supports
- Phased releases hall by hall
- Seismic bracing designed or detailed to AISC 341 where it applies
- Live production tracking in PEB Studio
- Tekla shop and erection drawings, included
The US contractor arranges
- The owner contract and the phasing
- Engineer of Record approval and PE seal
- Permits and special inspections
- Mechanical and electrical installation
- Erection and site work
Utah
What we do not claim
World Steel names no data center operator as a customer and claims no completed data center in Utah. We fabricate the structural steel for the US contractor who builds the campus.
Utah ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Utah contractors
Utah contractors: let’s win the next project together
If your next bid involves data centers, World Steel wants to be your long-term, win-win steel partner in Utah. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Utah project is cut, welded, inspected and packed.
Q&A
What Utah buyers ask
Can you repeat the same hall design?
Yes. We model the repeat hall once and release each copy as the owner’s phasing calls for it.
Do you supply roof plant steel?
Yes. Platforms and dunnage for cooling equipment come in the same package as the frames.
How do you handle the seismic loads?
The halls are braced for the Seismic Design Category your Engineer of Record sets, with AISC 341 where it applies.
Official sources: Utah Governor’s Office of Economic Opportunity
Utah solutions
Every Utah guide
Related pages
Code facts on this page summarize Utah practice, the Utah State Construction Code, the IBC with Utah amendments, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Utah?
Send the drawings or the site address, size and use. We set the Utah design basis with your Engineer of Record, design or detail the steel to the Utah State Construction Code and for seismic and snow loads, and quote it made in our plant in Vietnam, packed in erection order and landed at Los Angeles–Long Beach or Oakland for the rail or truck run to your site.