Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Alabama · Aerospace

Structural steel for Huntsville and Mobile aerospace halls

Huntsville is the Rocket City, home to space flight research, rocket engine work and hundreds of aerospace companies, and Mobile builds commercial aircraft at its Brookley site. Their buildings are tall, column-free assembly halls with heavy overhead cranes and doors that open most of a wall, and at Mobile they are also designed for Gulf hurricane wind.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Mobile for your Alabama site.

Curved long-span trusses being set during erection
Exported steel in place in Western Australia: a World Steel job abroad, shown for the building type rather than a US site.
Clusters
Huntsville, Decatur, Mobile
Buildings
Assembly halls, test and hangars
Key need
Height, spans, big doors
At Mobile
Hurricane wind too

Why it matters

Tall halls, wide doors

An aerospace hall needs a clear floor, height for tall assemblies and cranes, and a door across most of one wall. The truss or girder over that door carries the roof and the wind, and in Mobile that wind is hurricane wind.

We design long-span trusses and door girders, crane runways and tall built-up columns, and fabricate the large members as built-up sections in our plant, cutting plate up to 100 mm thick on our laser machines.

What we design and fabricate

Steel for aerospace halls

Long-span roofs

Trusses and girders for column-free halls.

Door girders

Framing for hangar and assembly doors.

Crane bays

Runways and tall columns for heavy cranes.

Gulf wind

Hurricane design for Mobile halls.

Who does what

Aerospace steel, split clearly

World Steel supplies

  • Long-span frame and truss design or detailing
  • Door girders, crane runways and tall columns
  • Built-up members from heavy plate
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Hangar door supply and crane installation
  • Fire protection design
  • Engineer of Record approval and PE seal
  • Local permit and inspections
  • Erection and site work

Alabama

What we do not claim

World Steel names no aircraft maker, rocket maker or aerospace company as a customer and claims no completed Alabama hall.

Alabama ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Alabama contractors

Alabama contractors: let’s win the next project together

If your next bid involves aerospace in Huntsville and Mobile, World Steel wants to be your long-term, win-win steel partner in Alabama. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Alabama project is cut, welded, inspected and packed.

Crew assembling a large steel truss on the shop floor
A large truss being put together in the Vietnam fabrication hall.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Q&A

What Alabama buyers ask

How tall and wide can a hall be?

Long-span trusses, built-up girders and tall columns are part of our range; the size is set with your Engineer of Record for the loads, cranes and door.

Can you meet project security rules?

We follow the document handling your project specifies. Tell us the requirements at the start.

Do Mobile halls need hurricane design?

Yes. Mobile lies in the hurricane-prone region, so doors, edges and the load path are designed for that wind.

Official sources: Alabama Department of Commerce

Alabama solutions

Every Alabama guide

Related pages

Code facts on this page summarize Alabama practice, local IBC adoption, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Alabama?

Send the drawings or the site address, size and use. We set the Alabama design basis with your Engineer of Record, design or detail the steel to your local code and Gulf or storm wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.