Illustrative distribution warehouse section, not a design. The rack plan sets the bay spacing and clear height.
Warehousing & Logistics · Planning the building
Column spacing set from your rack plan and dock count
We start from your racking layout, dock count and the clear height your storage needs, then size a clear-span or multi-span frame that keeps columns out of the aisles. Your racking designer and fire protection engineer review the grid before fabrication.
Clear height framed to your racking and sprinklers, not a catalog
Clear height is set by your racking and sprinkler design, not by a catalog limit. We frame the eave to give the clear height you specify under the lowest rafter flange, and check the columns for that height with the wind and seismic loads at your address.
An end wall built to take the next phase of your warehouse
When you tell us about a future phase, the end wall is designed as an expandable frame, so new bays bolt onto steel that already carries the extra load.
Warehousing & Logistics · Frame, docks and envelope
Rooftop solar and units on purlins sized for them from day one
When the loads are known before design. Your Engineer of Record confirms collateral and equipment loads, we size purlins and frames for them, and dunnage or support steel is detailed in the same model.
Warehousing & Logistics · Frame, docks and envelope
A long warehouse roof that floats on clips and stays watertight
Long buildings usually get a standing seam roof that floats on clips as the steel expands and contracts. Panel runs, expansion details and drainage are planned with the frame so laps and penetrations stay to a minimum.
Warehousing & Logistics · Frame, docks and envelope
Pick modules and mezzanines framed with the main building
Mezzanine frames for pick, pack and office floors are designed with the main frame, so their columns, bracing and connections are coordinated before anything is cut.
Warehousing & Logistics · Fabrication, quality and shipping
Distribution centers at scale from one Vietnam plant
World Steel fabricates up to 2,500 metric tons (2,756 short tons) of structural steel a month, and has supplied single logistics projects of around 2,000 metric tons, such as the M&D Warehouse in Thailand. Large orders are released in shipping lots that follow your erection sequence.
Warehousing & Logistics · Fabrication, quality and shipping
Piece-marked by erection area, shipped to a US port, trucked to site
Members are piece-marked and packed by erection area into containers or as breakbulk, shipped to a US port and trucked to site. The Incoterm and the importer of record are stated in each proposal.
Every zone a pallet passes through puts its own demand on the steel. We size the frame for each one in the same analysis model, before a single plate is cut in Vietnam.
Inbound docks
Dock doors get individually framed openings, and canopy steel cantilevers off the columns so trailers stay dry while unloading.
Retailers, 3PLs and manufacturers are adding distribution space near population centers, interstate corridors and inland ports to shorten delivery routes. Most of these buildings are big, plain boxes where every foot of clear height counts.
What the building needs
Bay spacing that suits the racking and dock layout, framed openings for dock and drive-in doors, a low-slope roof designed for the local snow, rain and wind, and room for the sprinkler system your fire protection engineer specifies.
How World Steel helps
We size the frame around your rack plan and door schedule, fabricate primary and secondary steel together, and load each container with one stage of the erection sequence. NYT Warehouse in New York (about 230 metric tons) and UR Warehouse 2 (2019) are among our US references.
Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.
Questions your engineer will raise
Column spacing, clear height and slab layout are agreed with the racking designer and your fire protection engineer before the frame is sized.
Each dock and drive-in door gets its own framed opening, and wall bracing moves to solid bays.
Snow drift against parapets and higher roofs, and ponding on low-slope roofs, are checked under ASCE 7.
Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.
One partner carries your warehousing & logistics building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.
Engineered to US codes
Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.
Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.
Warehousing & Logistics: what US contractors ask us
16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.
Planning the building4 answers
How do you set the column spacing for a warehouse?+
We start from your racking layout, dock count and the clear height your storage needs, then size a clear-span or multi-span frame that keeps columns out of the aisles. Your racking designer and fire protection engineer review the grid before fabrication.
What clear height can a steel distribution center reach?+
Clear height is set by your racking and sprinkler design, not by a catalog limit. We frame the eave to give the clear height you specify under the lowest rafter flange, and check the columns for that height with the wind and seismic loads at your address.
Can a distribution building be extended later?+
Yes. When you tell us about a future phase, the end wall is designed as an expandable frame, so new bays bolt onto steel that already carries the extra load.
What do you need from us to start a warehouse proposal?+
A site address, the building footprint, eave or clear height, dock door count and any mezzanine or canopy. A racking plan and a geotechnical summary help us refine the frame, but the first scope can start without them.
Frame, docks and envelope4 answers
Do you supply dock canopies and door framing?+
Yes. Canopy steel cantilevers from the main columns, and every dock or overhead door gets framed jambs and headers sized for the door manufacturer’s loads. Doors, levelers and seals come from their own suppliers.
Can the roof carry solar panels and rooftop units?+
Yes, when the loads are known before design. Your Engineer of Record confirms collateral and equipment loads, we size purlins and frames for them, and dunnage or support steel is detailed in the same model.
How is a large warehouse roof kept watertight?+
Long buildings usually get a standing seam roof that floats on clips as the steel expands and contracts. Panel runs, expansion details and drainage are planned with the frame so laps and penetrations stay to a minimum.
Do you design mezzanines and pick modules?+
Yes. Mezzanine frames for pick, pack and office floors are designed with the main frame, so their columns, bracing and connections are coordinated before anything is cut.
Fabrication, quality and shipping4 answers
Can your plant handle a very large distribution center?+
Yes. World Steel fabricates up to 2,500 metric tons (2,756 short tons) of structural steel a month, and has supplied single logistics projects of around 2,000 metric tons, such as the M&D Warehouse in Thailand. Large orders are released in shipping lots that follow your erection sequence.
Can I watch my warehouse steel being made?+
Yes. PEB Studio shows each of your members as it is cut, welded, coated and released by QC in our Vietnam plant, so your team sees progress in real time instead of waiting for photos.
Which quality records come with the steel?+
Mill certificates traced to heat numbers, weld and coating inspection results and packing lists by container, collected in a Manufacturing Data Record. World Steel is the first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year.
How is a warehouse shipped from Vietnam?+
Members are piece-marked and packed by erection area into containers or as breakbulk, shipped to a US port and trucked to site. The Incoterm and the importer of record are stated in each proposal.
Scope and working with us4 answers
Does World Steel erect the warehouse?+
No. World Steel designs, fabricates and supplies the steel. Erection and site work are the scope of the US contractor, our customer, working from our erection drawings and piece marks.
Who seals the drawings and gets the permit?+
Your Engineer of Record and your contractor. We deliver calculations and drawings ready for your Engineer of Record’s review and approval; the PE seal and the building permit stay on the US side of the project.
Are shop drawings included?+
Yes. Shop and erection drawings are supplied for every project at no extra cost, and they go through your review before fabrication starts.
Can the steel carry our company brand?+
Yes. Under OEM or private-label supply, labels and bundle tags carry your brand, while every piece is still made in World Steel’s plant in Vietnam from 100% Vietnamese materials.
Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.