Hawaii · Hurricane wind
Structural steel for Hawaii hurricane wind
Hurricanes Iniki and Iwa showed what wind can do to the islands, and ASCE 7 sets high design wind speeds across Hawaii, with extra speed-up over ridges, hills and coastal cliffs. We design a continuous load path from roof to anchor rods, opening framing and anchorage for the wind your Engineer of Record sets.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.
- Islands
- All in high wind
- Topography
- Speed-up on ridges
- Load path
- Roof to anchor rods
- Openings
- Framed for pressure
Why it matters
Wind that climbs the ridges
A building on a slope above Kona or a ridge in central Oahu can see much higher wind than one on flat land nearby, because the terrain speeds the wind up. Large doors and long walls are where the pressure concentrates.
We design frames, bracing and anchorage as one load path for the site wind including topographic effects, frame openings for the design pressure and give your foundation engineer the uplift reactions.
What we design and fabricate
Steel for hurricane coasts
Continuous load path
Roof to anchor rods, designed as one path for the design wind.
Opening framing
Door and window framing sized for the design pressure.
Coatings for salt air
Galvanizing or duplex systems near the shore.
Anchorage
Base plates and anchor rods for uplift.
Who does what
Hurricane design, split clearly
World Steel supplies
- Frames and bracing designed to ASCE 7 for the site wind
- Opening framing for the design pressure
- Coating systems chosen for the exposure
- Base reactions for the foundation design
- Tekla shop and erection drawings, included
The US contractor arranges
- Wind speed, exposure and risk category with the Engineer of Record
- Engineer of Record approval and PE seal
- Rated doors, windows and cladding
- Foundations and anchor rods
- Erection and site work
Hawaii
What we do not claim
World Steel holds no product approval for doors, windows or cladding and claims no storm shelter rating. We design the steel structure to ASCE 7 for the wind your Engineer of Record sets.
Hawaii ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Hawaii contractors
Hawaii contractors: let’s win the next project together
If your next bid involves island hurricane wind, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.
Q&A
What Hawaii buyers ask
Do you include topographic speed-up?
Yes, as your Engineer of Record sets it for the site.
Do you supply rated doors and windows?
No. Rated products are chosen by your team; we frame the openings.
Can the building be a shelter?
Shelters follow their own standard and are designed by your team.
Official sources: ASCE 7 Hazard Tool
Hawaii solutions
Every Hawaii guide
Related pages
Code facts on this page summarize Hawaii practice, the Hawaii State Building Code as your county adopts it, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Hawaii?
Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.