Structural steel for large US projects, by project type
Every type of project loads its steel differently. A crane bay, a process plant, a freezer warehouse and a mid-rise office each have their own spans, loads, codes and details. This guide lists the project types we fabricate for US contractors and, for each one, what drives the steel and what to decide before you bid.
2,500 ta month
About 2,750 short tons of structural steel a month, from World Steel’s own IAS AC472-accredited plant in Vietnam. Jobs up to 5,000 t delivered.
Pick your project type and see the steel that usually decides the bid.
The sector advisor matches your project to the structure types, loads and specifications that size its steel, so the first conversation starts in the right place.
From 1,000 t cold stores to a 5,000 t steel plant, the jobs behind each sector.
Sunpro Steel at about 5,000 t, CPV Food at 2,500 t, Long Son and M&D at about 2,000 t each and New Era cold storage at 1,000 t were all fabricated in our plant.
Our own plant ships 2,500 t a month, so a large US job does not queue.
Built-up lines, laser cutting up to 100 mm, blasting and paint halls sized for large packages let your steel move through the plant without waiting behind smaller work.
Five things to settle with us before the bid date, not after award.
Equipment data in writing, tolerance limits on the drawings, built-up options, the next bay and the inspection level all change tonnage and schedule if they come late.
Design, detailing, fabrication and shipping with us. Approval and erection with you.
World Steel designs, details, fabricates, coats and ships the structural steel. The US contractor, our customer, keeps the Engineer of Record approval, the permit, foundations and erection.
Data centers, seismic, fire-rated and mining steel each have their own guide.
Some projects need a deeper guide than one sector page: data center campuses, seismic systems, fire-rated steel and mining structures each have a full group of their own.
Pick a project type to see its typical spans and heights, the structural systems that suit it, the loads that size the steel and what we need from you for a firm scope. Ranges are typical, for orientation only; your Engineer of Record sets the design basis.
Heavy industrial plants
CRANE
Crane-served bays, heavy built-up columns, runway girders and process platforms for steel, metals and heavy manufacturing.
Typical spans
24 to 45 m (80 to 150 ft) per bay, often in several parallel bays
Heights
Crane hook heights of 9 to 20 m (30 to 65 ft) and more
Structural systems
Built-up or stepped columns, rafters or roof trusses, braced crane bays
Loads that size the steel
Crane wheel loads and lateral forces, fatigue, equipment and process loads
Industrial interior, heat and dust; zinc-rich or epoxy systems where specified
What sizes the steel
Crane capacity and duty. Capacity, span, speed and the CMAA service class set wheel loads, impact and the number of fatigue cycles the runway must carry.
Hook height and clearances. The hook height and the crane envelope fix the column height, the bracket level and the roof line.
Fatigue details. Runway girders, stiffeners and their welds are detailed for repeated loading, with weld categories shown on the drawings.
Process and equipment loads. Furnaces, presses, conveyors and hung services add point loads and vibration that the frame must take.
Written for US general, design-build and EPC contractors and their engineers. Each guide covers what drives the steel, the systems that suit it, our advice before you bid and World Steel projects of the same type.
Six decisions that shape every large steel package
Whatever the project type, these are the choices that move tonnage, cost and schedule the most. Settle them early with your Engineer of Record, and the bid you win is the job you build.
Fix the structural system before the tonnage
Rigid frames, trusses, braced bays or a moment frame each move the steel weight more than any later optimization. Choose it with your Engineer of Record at concept stage.
Decide who designs the connections
State in the contract documents whether connections are designed by the Engineer of Record or delegated to the fabricator, as AISC 303 allows. It changes the bid, the drawings and the schedule.
Split the job into erection sequences
A large package is modeled, detailed, fabricated, shipped and erected in sequences. Agree them early, and the steel your crew needs first is made first.
Write the material and test requirements once
Grades, Charpy toughness, mill certificate type and inspection hold points belong in the specification, not in an email after award.
Design for the shipping container
Members that fit a 12 m (40 ft) container, or a planned breakbulk load, ship cheaper and arrive straighter. We size splices for it during design.
Ask for visibility, not promises
On a large job you need to see progress member by member. PEB Studio shows every piece from cutting to packing in real time.
One plant, sized for the largest packages in every sector
2,500metric tons a month
About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.
Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.
Beam lines, submerged-arc welding, truss assembly, quality control and packing, in World Steel’s own plant in Tay Ninh Province, Vietnam. Not stock images.
Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Photo
A large truss being put together in the Vietnam fabrication hall.
Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Photo
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Photo
Going up beside the plant in Vietnam: World Steel framed its own office building.
Fabrication, welding and coating in our plant in Vietnam
Quality records, mill certificates and inspection access
Packing by erection sequence and shipping to your US port
Engineering support during erection by phone and video
The US contractor, our customer
Engineer of Record review, approval and PE seal
Building permit and special inspection arrangements
Foundations, anchor rods and site work
Steel erection and the erection crew
Local trades and final building completion
Questions from US contractors
Structural steel questions we hear
What kinds of structural steel projects does World Steel take on?+
Heavy industrial plants, oil, gas and petrochemical structures, food, beverage and feed plants, warehouses and distribution centers, cold storage, advanced manufacturing, energy and utility structures, multi-story and mixed-use frames, hangars, arenas and other long spans, and data center campuses.
How large a structural steel package can you fabricate?+
Our plant in Vietnam fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month. The largest single job so far is the Sunpro Steel Factory, about 5,000 metric tons.
Is this only for pre-engineered metal buildings?+
No. We fabricate conventional structural steel as well: built-up and rolled columns and girders, trusses, braced and moment frames, multi-story framing, platforms and access steel, alongside pre-engineered frames where they suit the job.
Can you build to our Engineer of Record’s design?+
Yes. Send the design and we fabricate it as drawn, or propose design optimization options that your Engineer of Record approves before anything changes.
Does World Steel erect the steel or seal the drawings?+
No. World Steel designs, fabricates and supplies the steel structure. Erection, the Engineer of Record’s approval and PE seal, the permit and site work are the scope of the US contractor, our customer.
Are shop drawings included?+
Yes. Shop drawings come with every project at no extra charge, from a Tekla Structures model of the whole job.
Where is the steel made?+
In World Steel’s own plant in Tay Ninh Province, Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472. The steel comes mainly from mills in Vietnam and ships to your US port.
Send the drawings, the specification and the schedule for any project type above. Our estimators take off the tonnage, confirm the production slot we can hold and return a written scope for steel designed to US codes, made in our plant in Vietnam and shipped to your US port by erection sequence.