Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

For logistics and distribution operators

Steel warehouses framed around your racking, your docks and your yard

Distribution space is measured in pallet positions and dock doors. World Steel sets the column grid to your racking plan, frames every dock opening for full design wind pressure and repeats it bay after bay, at the scale of our 2,000 t M&D warehouse in Thailand.

  • Clear spans that follow the racking plan
  • Dock openings framed for full design wind pressure
  • Expandable end walls for future growth

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

M&D warehouse in Thailand, 2,000 t of World Steel structural steel
M&D warehouse, Thailand · 2,000 t

Large-project capacity

2,500 t of structural steel a month

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.

How large jobs run

Your role, your problems

The problems we hear most, and our answer to each

  • Racking that fights the grid

    Columns in the wrong place cost pallet positions for the life of the building.

  • Walls full of openings

    Dozens of dock doors weaken the wall that has to resist the wind.

  • Many sites, many codes

    A network of buildings means a different design load at every address.

  • Grid set to the rackingBay spacing and clear height studied against your layout, in mm and feet.
  • Dock walls designed for windJambs, headers and bracing sized for the openings you need.
  • Expandable end wallsFrames and anchor rods planned for the next phase.
  • One design, many addressesA standard building adjusted to each site’s loads.

Span and bay study

Span and bay study for your floor

Three ways to frame the same distribution building. We run the comparison on your footprint and racking plan.

Span and bay study for your floor

Clear span

Columns
No interior columns
Steel
Most flexible floor, heaviest frame
Best for
Cross-docks and short-term leases

Multi-span

Columns
Interior columns on the racking line
Steel
Less steel per m² on wide buildings
Best for
Big-box distribution

Modular multi-span

Columns
Columns on a repeated grid
Steel
Lowest steel weight, longest runs
Best for
Large regional DCs

Request a quotation · Logistics Companies

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Plan your warehouse or cross-dock
Become our partner in the US Operators building at several US locations can standardize one building and agree program terms for every site. Contractor Partnership Program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that logistics companies use most, each with its own page to read before you call.

Ecosystem for Logistics Companies

  • Packing & shippingBundled in erection sequence, documented for US customs and shipped to West, Gulf or East Coast ports.
  • Design processEight steps from your RFQ to released shop drawings, with an approval gate before any steel is cut.
  • Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What logistics companies ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Plan your warehouse or cross-dock
Can you design the column grid around our racking?

Yes. Send the racking layout, pallet sizes and clear height. We compare bay spacing options and show the steel weight per square meter for each.

How are dock openings handled?

Each opening is framed with jambs and headers, and the wall bracing is designed for the full design wind pressure with the doors open or closed as the code requires.

Can we reuse one design across several sites?

Yes. The building is engineered once and adjusted to each site’s wind, snow and seismic loads, which keeps drawings and fabrication fast across a program.

What is the largest warehouse job World Steel has delivered?

The M&D warehouse in Thailand used about 2,000 t of structural steel. The plant fabricates about 2,500 t a month.

Is the building expandable?

Yes. End walls can be designed as removable bearing frames, with anchor rods placed for the future bays.

Who installs the building?

Your US contractor erects it. World Steel designs, fabricates and ships the steel in erection order.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.