Maryland · Building code
Structural steel and the Maryland Building Performance Standards
Maryland adopts one code base for the whole state, the Maryland Building Performance Standards, taken from the IBC. Counties and municipalities enforce it, review plans and inspect the work, and may make limited local amendments, so Montgomery County and Ocean City can differ in the details.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of Baltimore for your Maryland site.
- Statewide code
- MBPS, IBC based
- Enforced by
- Counties and cities
- Local changes
- Limited amendments
- Our part
- Code edition on sheet one
Why it matters
One code base, 24 jurisdictions
The structural rules start from the same IBC across Maryland, but each county and many cities adopt it on their own schedule, with their own amendments and review process. Wind and flood change toward the Bay and the ocean, and snow climbs sharply in the mountains of western Maryland.
We confirm the edition and local amendments with your Engineer of Record before modeling, state the code basis and loads on the first calculation sheet, and answer the reviewer’s questions on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code edition | The MBPS edition and local amendments in force |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Flood | Flood zone and design flood elevation, when the site has one |
| Snow | Ground snow and drift for the site |
| Envelope | Girt and purlin details for the energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The building permit application
- Engineer of Record approval and PE seal
- Special inspections and local inspections
- Energy code compliance for the envelope
- Foundations and erection
Maryland
What we do not claim
World Steel holds no Maryland approval and no Maryland engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the county or city.
Maryland ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Maryland contractors
Maryland contractors: let’s win the next project together
If your next bid involves Building Performance Standards, World Steel wants to be your long-term, win-win steel partner in Maryland. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Maryland project is cut, welded, inspected and packed.
Q&A
What Maryland buyers ask
Does the same code apply across Maryland?
The same code base does. Counties and cities enforce it and may make limited amendments, so we confirm the local version.
Can you answer plan review comments?
Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.
Do local amendments affect the steel?
Sometimes, for example in flood or wind rules. We read the local amendments with your engineer before modeling.
Official sources: Maryland Department of Labor: Building Codes Administration
Maryland solutions
Every Maryland guide
Related pages
Code facts on this page summarize Maryland practice, the Maryland Building Performance Standards, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Maryland?
Send the drawings or the site address, size and use. We set the Maryland design basis with your Engineer of Record, design or detail the steel to the Maryland Building Performance Standards and to Bay wind, flood and mountain snow, and quote it made in our plant in Vietnam, packed in erection order and landed at the Port of Baltimore for the truck to your site.