Advanced manufacturing plants
East of Reno on I-80
Long-span process halls, crane bays and heavy utility steel, released by phase.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
Six highway signs
From Reno and the I-80 parks to the Las Vegas Valley, Carson City, the mining north and the southern corridors, Nevada’s large projects gather in six places. Each has its own buildings and its own weather.
Distribution, manufacturing and data centers.
Large industrial parks and advanced plants.
Distribution centers, data centers and multi-story buildings.
Manufacturing and light industry near the Sierra.
Process plants, truck shops and mine buildings.
Industrial parks, solar and utility buildings.
High seismic hazard, snow at elevation and dry wind.
Extreme summer heat, sun and desert wind.
Industrial parks from Reno to Fernley.
Distribution from Las Vegas to Mesquite.
Remote process plants and truck shops.
Heavy snow and wind near Lake Tahoe.
Nevada guides
One guide per Nevada condition: the county building codes, northern seismic design, desert heat, wind and snow, the routes from the California ports, and the industrial, data center, warehouse and mining projects that drive the market.
Ready for Nevada
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations and drawings that state the county code edition, amendments and loads.
County codes guide →Braced and moment frames detailed to AISC 341 where the Seismic Design Category calls for it.
Northern seismic guide →AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.
Demand-critical welds →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Nevada project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Packed in erection order at Oakland or Los Angeles–Long Beach, then the truck on I-80 or I-15.
Ports and routes guide →Solution advisor
Structural steel for the project types Nevada builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
East of Reno on I-80
Long-span process halls, crane bays and heavy utility steel, released by phase.
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
Reno, McCarran and Las Vegas
Repeat data halls, heavy roof plant, seismic bracing and phased releases.
GPPD Energy factory, Vietnam: plant steel by World Steel
North Las Vegas, Henderson and Reno
Clear-span frames with tall clear heights, cool roofs and dock canopies.
Makro Prachinburi, Thailand: clear-span World Steel frames
Elko, Winnemucca and Battle Mountain
Mill buildings, truck shops, conveyor steel and crane bays for remote sites.
Hoa Phat factory, Vietnam: heavy plant steel by World Steel
Las Vegas and Reno
Composite floors with braced or moment frames for the site seismic category.
The Sun Tower, Vietnam: multi-story steel frame by World Steel
Las Vegas and Reno
Freezer and cooler warehouses with thermal breaks for desert heat.
New Era cold storage, Vietnam: 1,000 t of World Steel structural steel
Southern corridors and the north
Equipment shelters, substations and plant buildings for heat, wind and seismic loads.
Interlink factory, Thailand: plant steel by World Steel
Reno and Las Vegas
Long-span trusses and portal frames with big door openings.
Hangar, Thailand: long-span World Steel frames
The Nevada ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Nevada structures, beyond metal buildings.
Complete buildings engineered for Nevada sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your Nevada site.
Open call · Nevada contractors
Industrial parks east of Reno, data centers in Reno and Las Vegas, distribution centers in North Las Vegas and Henderson, and mining process plants in the north are large steel packages in fast-growing markets. You win the job and run the site; World Steel designs and fabricates the structural steel, 2,500 t a month from its own plant, to the county code and AISC 341 where it applies, and trucks it to you in erection order.
Where Nevada partners win with us
Buying steel from outside the US
The questions Nevada owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a Nevada site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Nevada buyers
The code your county or city adopts. Clark County and Washoe County, and the cities inside them, adopt the IBC with Southern or Northern Nevada amendments. We confirm the edition with your Engineer of Record before modeling.
Yes. We design the steel to the Seismic Design Category your Engineer of Record sets, with AISC 341 detailing where it applies, and our shop has AWS D1.8-qualified welding procedures and welders for demand-critical welds.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
Through Oakland or Los Angeles–Long Beach, then by truck or rail on I-80 to Reno or I-15 to Las Vegas. Members are packed in erection order for the last leg to your site.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, seismic, heat, snow and delivery questions for your site.
Honest status. World Steel designs and fabricates to the county-adopted IBC and ASCE 7. We hold no state or local approval and no Nevada engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Nevada design basis with your Engineer of Record, design or detail the steel to the code your county adopts and for seismic loads, desert heat and snow, prepare it for plan review, and quote it made in our plant in Vietnam, packed in erection order and landed at Oakland or Los Angeles–Long Beach for the truck to your site.